Coordinate melt delivery, tooling, cooling and traction around the cable design.
HK-90 광케이블 피복 라인
Φ90 mm 압출 · 코어 공급부터 완제품 케이블 권취까지
Apply the specified outer sheath around your prepared optical cable core. Configure material feeding, aramid yarn stranding or metal-tape protection as required, extrusion, cooling and take-up as one coordinated production stage.
- INPUT
- Prepared cable core or loose tube, with the specified protection materials
- OUTPUT
- Sheathed optical cable on the agreed finished-cable drum
- CORE PROCESS
- Pay off → prepare → extrude → cool / inspect → take up
- CONFIGURATION BASIS
- Cable construction, sheath compound, diameter, output and reel format
Scope boundary: this page covers the sheathing stage. Upstream coloring, loose-tube extrusion and SZ core stranding are separate processes. Reinforcement and armoring modules are selected for the approved cable construction.
From prepared core to finished outer sheath.
Build the process around the cable layers. Optional protection modules are selected before the extrusion and downstream handling requirements are finalized.
Feed the specified construction.
Start with the prepared core or loose tube. Match the core, wire and protection-material pay-offs to the incoming package.
Prepare the layers before extrusion.
Apply the selected water blocking and ripcord. ADSS routes add aramid yarn stranding before the outer sheath; armored routes use the specified metal-tape preparation and forming modules.
Form the outer jacket.
Feed the approved compound to the Φ90 mm extruder and crosshead. Coordinate melt delivery, cable centering, temperature and line speed.
Cool, inspect and collect.
Cool and dry the sheath, monitor diameter, apply the specified marking and tests, then coordinate caterpillar traction with finished-cable take-up.
Choose the protection route for your cable.
The same extrusion stage can sit within different process routes. Compare the incoming core, reinforcement and tape requirements before defining the equipment package.
Follow the line, one machine at a time.
Select a number or equipment card to see its equipment area, image and process role. Dashed regions identify process interfaces whose final position must be confirmed. The reference includes optional preparation and testing modules; the final equipment list follows your cable construction.
13 · Φ90 mm sheath extruderEquipment area in the reference arrangement
Equipment-family reference from the supplied project document. Final construction and quantity follow the approved equipment list.
Φ90 mm sheath extruder
Plasticizes the approved sheath compound and supplies the adjustable crosshead. The reference uses a Φ90 mm screw with a 25:1 L/D ratio.
Compound grade, screw and crosshead, tooling, temperature profile, output and required jacket dimensions.
Selected equipment 13: Φ90 mm sheath extruder
참조 경계: the panorama illustrates equipment order, not the final machine count, footprint or construction. Images from the project document show equipment families; the approved layout and equipment list define the supplied arrangement.
사양 뒤에 있는 작동 조건을 정의하십시오.
아래의 참조 자료를 사용하여 기술 검토를 시작하십시오. 생산 성능에 동의하기 전에 완전한 케이블 구조, 재질 등급 및 시험 조건을 확인하십시오.
| Review area | Reference / requirement | 확인할 조건 |
|---|---|---|
| Extruder reference | Φ90 mm screw · 25:1 L/D · 75 kW main drive. | Reference equipment configuration; screw, crosshead and tooling must suit the compound and cable. |
| Aramid stranding reference | 24 heads · independent tension · adjustable pitch · S or Z lay. | Selected for the cable construction. Confirm yarn grade, quantity, tension and stranding pitch together with extrusion speed. The reference 120 rpm rotation is not a cable line speed. |
| Sheath materials | PE / PVC in the supplied extruder reference. | Confirm the compound grade and process settings. Other compounds require a separate suitability review. |
| 생산 속도 | Reference: up to 80 m/min for PE cable below Φ10 mm. | Conditional source value; confirm the complete construction, jacket thickness, cooling, reel changes and quality targets. |
| Extrusion output | Reference: up to 250 kg/h PE, with the crosshead open in the source specification. | An extruder-output reference is not guaranteed finished-cable throughput. Verify it with the agreed tooling and compound. |
| Cable & tooling range | Specify incoming core, finished diameter and jacket thickness. | Review every module. A metal-tape forming tool may have a narrower range than the extruder or capstan. |
| Reels, tension & utilities | Agree supply/output drums, winding tension, layout and utility loads. | Use one approved schedule for the chosen configuration; do not infer these values from the HK-90 name. |
| Controls & acceptance | PLC / IPC coordination, recipes, alarms and agreed inspection records. | Define instruments, interfaces, safety functions, trial duration and acceptance criteria. |
Confirm the technical schedule for your cable.
Review output together with the sheath cross-section, compound, tooling and cooling capacity. Reel capacity, line footprint, tension settings and utility loads are finalized for the selected configuration.
Connect the sheathing stage to your finished cable.
Compare the complete cable route, then define the sheathing equipment and construction-specific preparation modules.
GYXTW 케이블
Review the loose-tube input, parallel strength members, metal-tape protection and outer-sheath requirements.
Open cable solutionADSS 케이블
Coordinate aramid yarn stranding with outer-sheath extrusion; confirm whether the incoming cable is a prepared core or an inner-sheathed cable.
Open cable solutionGYXTC8S Figure-8 Cable
Review the published construction, armoring, messenger positioning and figure-8 crosshead tooling together.
Open cable solutionConstruction matters: armored, all-dielectric and figure-8 cables require different preparation, reinforcement and tooling. One illustrated arrangement does not establish compatibility with every cable.
For tube extrusion, review the 느슨한 튜브 생산 라인. 꼬임 심선의 경우, 다음을 검토하세요. SZ 연합 와이어 생산 라인.
See the sheathing process. Plan the acceptance trial.
The HONGKAI HK-90 video shows a sheathing reference for an ADSS cable route. Use it to discuss equipment and operating sequence, then agree the trial for your construction.
Trial the specified construction.
Use the approved core, sheath compound, protection materials and output drum.
Check coordinated behavior.
Observe extrusion, cooling, diameter monitoring, traction and take-up during starts, steady running and stops.
Agree the inspection record.
Check finished diameter, sheath thickness and appearance, marking, winding and the agreed optical and jacket tests.
Connect equipment supply with factory start-up.
The written proposal should connect equipment selection, integration and start-up responsibilities. Confirm the scope with HONGKAI for your project.
장비 범위
- Specify the supplied modules and quantities
- Identify retained and buyer-supplied equipment
- Record equipment-source responsibilities
Line integration
- 레이아웃 및 자재 흐름 인터페이스 검토
- Define controls, utilities and safety boundaries
- 설치 및 시운전 범위에 동의함
Start-up & support
- 시험 제품 및 승인 기록 정의
- Confirm operator training and documentation
- Agree spare-parts and after-sales scope
Tell us about the cable you need to sheath.
귀하의 도면, 제품 요구사항 또는 기존 장비부터 시작하십시오. 기술적 세부사항은 첫 번째 검토 시 확인할 수 있습니다.
Nine inputs for your sheathing line.
- 01
Cable drawing and finished dimensions
- 02
Incoming core or loose-tube details
- 03
Sheath compound and jacket thickness
- 04
Reinforcement, tape and ripcord requirements
- 05
Input and output drum sizes / weights
- 06
Target output and operating plan
- 07
Marking, testing and acceptance criteria
- 08
Factory layout and retained equipment
- 09
Utilities, installation and project timing
Questions before specifying an HK-90 sheathing line.
Review the cable construction, equipment boundary and information needed for a proposal.
01HK-90 피복 라인은 무엇을 생산합니까?
해당 공정은 준비된 광케이블 코어 또는 구조별 튜브 및 보호 패키지에 지정된 외피를 적용한 후, 케이블을 냉각하고 검사하여 권취한다. 상류 공정인 광섬유 컬러링, 로스튜브 압출 및 SZ 연선은 별도의 단계로 간주되며, 프로젝트 범위에 포함되지 않는 한 본 공정에 포함되지 않는다.
02한 라인으로 GYXTW, ADSS 및 피규어-8 케이블을 생산할 수 있습니까?
이 케이블 계열에는 HK-90 피복 공정이 포함될 수 있지만, 동일한 장비 패키지를 사용하지는 않는다. 각 케이블 도면에 대해 코어 처리, 보강재, 아머링, 메신저 와이어 위치 설정, 크로스헤드 툴링 및 하류 시험을 검토해야 한다.
03모든 구성에 금속 테이프 장비가 포함되어 있습니까?
금속 테이프의 방출, 접합, 축적, 주름 형성 및 종방향 성형은 지정된 피복 또는 복합 외피 구조를 위해 선택됩니다. 전유전체(All-dielectric) 경로는 다른 보강 요건을 갖습니다.
04표시된 속도와 출력은 무엇을 의미합니까?
The source gives up to 80 m/min for PE cable below 10 mm and an extrusion-output reference of up to 250 kg/h PE with the crosshead open. These values describe stated reference conditions. Actual accepted cable output must be agreed for the cable, compound, tooling, cooling and operating plan.
05어떤 시스 컴파운드를 사용할 수 있습니까?
The supplied extruder reference describes PE and PVC. Confirm the exact grade and required screw, tooling, drying and temperature settings. Do not assume that LSZH or another compound is covered without a separate engineering review.
06완성 케이블 애큐뮬레이터가 포함되어 있습니까?
장비 사양에는 테이프 접합 공정을 위해 테이프를 저장하는 금속 테이프 애큐뮬레이터가 포함됩니다. 완성 케이블 애큐뮬레이터는 다른 역할을 수행하므로 자체 구성, 장력, 저장 길이 및 릴 교체 점검이 필요합니다.
07Can the jacket spark tester be used for ADSS?
시험 적용성은 케이블 구조와 적절한 전기적 복귀 경로에 따라 달라진다. 유전체만으로 구성된 케이블에는 금속을 포함한 케이블과 동일한 스파크 시험 장치를 자동으로 적용해서는 안 된다. 실제 제품에 대한 시험 방법 및 합격 기준을 확인하라.
08견적을 위해 무엇을 보내야 하나요?
케이블 도면, 인입 코어, 시스(외피) 컴파운드, 보호재, 필요한 드럼 사이즈 및 생산 목표를 보내주십시오. 가능하면 공장 레이아웃과 기존 장비도 함께 제출해 주세요. 기술적 세부사항은 첫 번째 검토 단계에서 완료할 수 있습니다.