01

Turnkey factory project

Turnkey Fiber OpticCable Factory Solution

Start your fiber optic cable manufacturing business with a complete plan for equipment, materials, factory layout and production startup.

One factory.
One connected project.
Equipment · Materials · Layout
Utilities · Laboratory · Training
Complete process lines, connected.Stranded ADSS example · prepared fiber input

Separate lines with reel transfers. Double-jacket ADSS also needs an inner-sheath pass between stages 02 and 03. Add upstream fiber coloring if required.

02

Who this solution is for

Where does your
project begin?

03

Target cable portfolio

What business
will your factory serve?

Start with the cable your customers need. Explore a direction to see how it changes your production route and factory plan.

FTTH / drop cableEXISTING 3D REFERENCE
FTTH drop-cable reference structureCáp thả FTTH details
Existing HONGKAI 3D model. Final construction follows your drawing.
Connect homes & buildings

Start with the cable that reaches the customer.

Plan an indoor or self-supporting drop-cable business around your local access-network requirements.

  • Confirm indoor or self-supporting construction
  • Match reel handling and packing to your buyers
  • Plan extrusion, cooling and final inspection together
Typical process routeProcess steps, not a list of standalone machines
  1. 01Cung cấp sợi quang
  2. 02Các bộ phận chịu lực
  3. 03Jacket extrusion
  4. 04Làm nguội & ghi nhãn
  5. 05Take-up & testing

A drop-cable route can start from purchased optical fiber and prepared strength members. Coloring and support-wire preparation are added only when the project needs them.

04

Project requirement snapshot

Define the factory.
Then select the equipment.

A few project inputs connect your target cable to the factory it needs. Start with what you know. Every field is optional.

Project starting pointNhà máy mớiTarget cable portfolioĐể xác nhậnChọn cáp
Utilities, laboratory & your team

Your inputs stay in this page and carry into the final brief. No enquiry is sent here.

05

Complete factory process architecture

See your business
take shape.

From raw materials to finished cable: connect complete production lines, intermediate reels, laboratory checks and dispatch with the systems that support them.

Whole-factory explorerFTTH / drop cable
ILLUSTRATIVE MASTERPLANSelect a system or play the tour
Illustrative factory masterplan showing raw-material areas, production, utilities, laboratory, logistics and future expansion
Material & product flowSupporting infrastructure
SYSTEM 01 / 08
What goes into my cable?

The right materials, ready for the first run.

Coordinate the material bill with the cable drawing and the equipment, from optical fiber to the finished reel.

  • Fiber, polymers, yarns and strength members
  • Supplier matching, TDS and sample review
  • Storage, trial-run quantities and packaging
WHAT WE PLAN TOGETHERInitial material BOM & sourcing plan

Cuộc thảo luận của nhà máy bạnExplore the complete scope, then add the topics you want to discuss.

Open my brief
06

Equipment scope by production stage

The right production lines.
One workable factory flow.

A cable factory connects complete process lines, not just individual machines. Choose a cable to see the line combination and the intermediate products transferred between them.

  1. LINE 01

    FTTH drop-cable line

    Complete ftth drop-cable line configuration reference, including upstream and downstream equipment
    INPUTOptical fiber + prepared strength membersOUTPUTFinished drop cable on reels

    Feed the fiber and strength members into one coordinated extrusion, cooling, marking and take-up line. Messenger feeding is added for a self-supporting design.

What belongs in each production stage?

Planning status for the selected cable, not a final supply list.

Chuẩn bị sợi quang

Coloring, rewinding and compatible pay-offs

Use purchased optical fiber and prepared strength members. Add fiber coloring / rewinding or wire coating only if those inputs will be made in-house.

Conditional

Tube / buffer formation

No secondary coating in this example

Match the intermediate product to the approved cable design.

Not in route

Cable core & reinforcement

Cấp phát bộ phận chịu lực song song

Reinforcement equipment is coordinated with its host line.

Design dependent

Sheathing & marking

FTTH drop-cable line

Extrusion, cooling, marking and take-up operate as a complete line.

In this route

Testing & finishing

Test instruments, reel transfer, rewinding / coiling and packing

Select test equipment and finished-reel handling for the customer specification.

Scope to agree
Explore equipment within each line
07

Factory layout & material flow

Plan the space
between the production lines.

Việc tiếp nhận, sản xuất, kiểm tra và xuất hàng cần hoạt động như một luồng vật liệu thống nhất. Kích thước thiết bị chỉ là một phần của bản vẽ nhà xưởng.

Factory layout conceptIllustrative. Not to scale.
Illustrative full-factory layout with material stores, separate production areas, laboratory, plant services and dispatch
Building inputDimensions and site drawing to confirmPlanning exampleCáp thả FTTH
FLOW STEP 2 / 5

Design the space between complete lines.

Production does not move through one continuous machine. Include process-reel storage, inspection and safe transfer to the next line.

  • Line length and operator access
  • Intermediate reel / drum buffers
  • Maintenance access around every line
Planning outputEquipment positions and WIP handling plan

Final planning uses your building drawing, reel sizes, line configuration and local requirements. Forklift routes, operator aisles, cabinets, water routes and cable trays must be reviewed together.

08

Utilities & infrastructure

Prepare the services
that make production possible.

Calculate utility requirements after the equipment scope is confirmed. One fixed power or water figure cannot describe every factory.

Electrical power

Installed load, local voltage / frequency, distribution and machine connections.

Cooling water

Extrusion cooling circuits, temperature control and connection points.

Compressed air

Required pressure, air quality and connection points for applicable equipment.

Ventilation

Extrusion and workshop ventilation matched to equipment and local conditions.

Material storage

Storage and material preparation for fiber, polymers, yarns and strength members.

Process environment

Temperature, humidity, dust control and safe access where the process requires them.

09

Laboratory & quality control

Build quality control
into the factory plan.

Từ nguyên vật liệu đầu vào đến các cuộn cáp thành phẩm, hãy lên kế hoạch cho các thiết bị, phương pháp thử nghiệm và hồ sơ mà khách hàng của bạn sẽ cần.

  1. 01
    Incoming materials

    Identity, supplier records and agreed incoming checks.

  2. 02
    Kiểm soát trong quá trình sản xuất

    Process settings, dimensions and reel traceability.

  3. 03
    Finished cable

    Product-specific tests and recorded release criteria.

LABORATORY EQUIPMENT PLANNING
Reference cable tensile testing machine with capstan wheels
Existing HONGKAI proposal image · equipment reference
Mechanical

Cable tensile testing

Evaluate the cable under the agreed pulling load and monitoring conditions.

Phạm vi thiết bị
Tensile, crush, impact, bending or torsion equipment is selected against the cable specification.
Confirm before selection
Load range, fixtures, sample length, optical monitoring and acceptance limits.
Required evidence
Recorded loading conditions and the specified cable / optical results.
10

Raw material & initial BOM support

The cable you want to make.
The materials to start it.

See what goes into your selected cable, where each material enters production, and what must be confirmed before the first order.

Cáp thả FTTHEXISTING 3D REFERENCE
FTTH drop-cable reference structure
Approximate layer locator. Final materials follow the approved cable drawing.
VẬT LIỆU 01 / 03

Sợi quang

The optical transmission element at the centre of your cable.

Where it enters production
Fiber preparation and the first production line
Confirm for the initial BOM
Fiber specification, colour, reel format and supplier records
Explore this material category
Explore the material layersSelect a category to see its role.

Also plan reels, packaging, process consumables and incoming inspection with the first material order.

  1. 1
    Cable drawingConfirm the construction
  2. 2
    Initial BOMIdentify grades & quantities
  3. 3
    Supplier reviewCheck TDS & samples
  4. 4
    Trial productionValidate the agreed inputs
11

Phased factory configuration

Start with the essentials.
Plan the next move.

Choose the planning horizon for your brief.

12

Manufacturing & responsibility

One project team.
Clearly defined responsibilities.

How HONGKAI works

Manufactured by HONGKAI

Core machinery, mechanical assembly, electrical integration and testing within our manufacturing scope.

Được cấu hình & cung cấp

Auxiliary equipment, tooling and supporting systems matched to the production route.

Tích hợp chuyên gia

Identified partners for specialist machinery, materials and laboratory equipment.

Your local team

Building, civil works, local utility readiness, approvals and operators coordinated with the project plan.

HONGKAI coordinates the configuration, delivery, installation and after-sales interfaces agreed in the project scope.

13

Project execution timeline

A clear path to
your first production run.

See what you bring, what each stage produces and who works with you along the way.

Customer + HONGKAI

Start with your product and market.

You can start with an application when the exact cable model is still unknown.

START WITH
Target customers, cable samples or drawings, and the output you need.
LEAVE WITH
A shared product brief and open-question list.

Stage order is a planning framework. Dates, duration and overlaps are agreed after the equipment and service scope is confirmed.

14

FAT / installation / training

Reduce project risk
before production starts.

Separate acceptance, installation and training into clear checkpoints. Agree the deliverables and responsibilities before work begins.

Agree the test before the equipment is shipped.

FAT means Factory Acceptance Test. It checks the contracted equipment against agreed conditions, not an undefined promise of factory performance.

  • Contracted machine scope and configuration
  • Cable sample, materials and test conditions
  • Running checks and agreed acceptance criteria
  • Recorded results, open items and documentation
15

Real project evidence

See the work behind
the factory plan.

Review existing HONGKAI project imagery, then ask for the records relevant to your proposed equipment and service scope.

HONGKAI machine manufacturing activity
HONGKAI PROJECT ACTIVITY

See the equipment behind the scope.

Workshop and assembly views help you review how the proposed production equipment is built.

Ask for build records and machine-specific running evidence.

These images show project activities. The supplied scope, test results and acceptance records for your factory are confirmed separately.

16

Knowledge & decision support

A clearer decision.
A better project brief.

Use the existing HONGKAI resources and the planning checklists on this page to work through the next decision.

Equipment selection

Compare routes before machine models.

Use cable construction and application to identify the right production-line family.

Cable & process catalogHONGKAI website
Nguyên liệu thô

Prepare the first material discussion.

Explore material categories before confirming grades, suppliers and trial quantities.

Optical cable materialsHONGKAI website
Capacity & investment

Set the assumptions first.

Capture target output, building conditions and a planning phase before requesting a configuration.

Project input checklistPlanning checklist on this page
Laboratory planning

Define the checks your cable needs.

Review in-process checks, finished-cable testing and the laboratory scope.

Quality planning checklistPlanning checklist on this page
Common project questions

Resolve the open decisions.

Space, phasing, supplier responsibilities and startup support belong in the first discussion.

Factory project FAQPlanning checklist on this page
17

Câu hỏi thường gặp

Before you start.

A few useful answers for your first factory discussion.

Can I start if I do not know the machine names?

Yes. Start with your intended customers, installation environment and the cable you want to sell. A sample, drawing or application description gives HONGKAI a basis for discussing the product, process and factory scope.

Which production lines does a new factory need?

The cable portfolio determines the line combination. FTTH drop cable, GJFJV, central-tube GYXTPY and stranded ADSS use different routes. Review purchased intermediate products, preparation, reel transfers and testing before fixing the equipment list.

Can materials and specialist equipment be included?

Material sourcing, auxiliary systems and specialist laboratory equipment can be coordinated within the agreed scope. Their manufacturers, technical requirements and responsibilities are identified in the proposal.

How much investment and factory space do I need?

A useful estimate requires the target cable portfolio, output, automation level, available building and local utility conditions. The project can then be evaluated by production phase. This page does not apply a fixed price or area to every factory.

Can we build the project in phases?

Yes, phased planning can begin with the core product range and consider additional parallel lines or new cable families later. Space, material flow and utility interfaces should be reviewed before the first phase is finalized.

What should we prepare for the first discussion?

Share your target market and cable products, country, capacity goal, available factory information and expected timing. Mark unknown items as “to confirm”; the first conversation can help identify the missing technical inputs.

What utilities should be prepared?

Power, cooling water, compressed air where required, ventilation and process conditions are evaluated after equipment selection. Share the existing voltage, frequency and building conditions so equipment-side and site-side responsibilities can be defined.

Do we need to build a new laboratory?

Review your current instruments, target cable requirements and testing plan first. The scope may involve a new laboratory, additions to an existing one or identified external testing. Test methods, equipment and documentation are confirmed for the project.

What does FAT include?

Factory Acceptance Test checks the contracted equipment against an agreed plan, including the test material, running conditions, acceptance criteria and documentation. Results and open items should be recorded before the contracted shipment-release decision.

Can we keep our existing production equipment?

Share the machine list, current process, controls, utility needs and condition. Reuse depends on technical compatibility and the planned output; integration is reviewed before it is included in the factory configuration.

How are installation and training arranged?

Site readiness, travel or remote support, installation responsibilities, commissioning, training and acceptance conditions are defined in the project agreement. Your local team prepares the building, utilities and operators assigned to the project.

18

Start your factory project

Bring your cable idea.
Let’s plan the factory.

You do not need every technical answer today. Start with what you know and we can work through the missing details together.

Review your project inputsFull requirements

Prepare and review here. Nothing is sent until you choose your enquiry channel.

Only need an individual production line?Browse production lines & equipment

Yêu cầu báo giá

chúng tôi sẽ trả lời bạn trong vòng 24 giờ!!!