ASU Cable Production Line for Central Loose-Tube Aerial Cable
ASU production-line panorama · Complete route remains visible
이 생산 경로는 무엇을 생산합니까? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.
- 생산 루트
- HK-50 → HK-90 ASU
- 제어 방식
- 각 생산 단계에 대한 조정된 제어 시스템 검토
- 주요 공정
- PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
- 적합한 케이블 범위
- ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
Read the ASU cable from the inside out.
Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.
01
조립된 참조
Two core stages form the reference ASU cable.
위쪽 레이어를 선택하여 준비, 형성 또는 통합하는 단계를 강조 표시하세요.
선택한 케이블 계층의 생산 구성 검토.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.
HK-50
PBT loose-tube production
Combine colored fibers, filling compound and PBT material into the required central loose tube.
- 입력
- Approved colored optical fibers + filling compound + PBT
- 출력
- Jelly-filled PBT loose tube
- 경로 위치
- Stage 01 · Central loose-tube formation
Form the jelly-filled PBT loose tube
Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.
Fiber feeding · jelly filling · PBT extrusion
This stage forms the single loose tube used at the center of the reference ASU construction.
Fiber count, tube geometry and material system
Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.
기계 수량, 치수, 성능, 보조 시스템 및 최종 배치는 케이블 구조 및 프로젝트 요구사항에서 확인됩니다.
See the ASU-specific downstream production line in operation.
This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.
Define the ASU project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
아래의 모든 항목은 서면으로 확인될 때까지 포함, 제외, 구매자 공급 또는 HONGKAI- 공급으로 간주되지 않습니다.
그룹을 열면 세부 정보만 표시되며, 범위가 확인되는 것은 아닙니다.
01 구매자 준비 구매자 책임 공학 검토를 위한 프로젝트, 제품 및 사이트 정보 4 항목
생산 라인 및 참조 장비 구성 확정 전에 HONGKAI을 검토해야 합니다.
- 검토를 위한 목표 케이블 도면 및 제품 요구사항 확인 예정
- 시작 재료, 등급 및 공급 형태 확인 예정
- 공장 공간, 유틸리티, 접근 및 설치 조건 확인 예정
- 기존 장비 및 상류/하류 인터페이스 정보 확인 예정
02 서면 제안서에 정의됨 HONGKAI 책임 권장 구성 및 견적 공급 범위 4 항목
HONGKAI은 사용 가능한 프로젝트 입력을 검토한 후 권장 구성 및 견적 공급 범위를 정의합니다.
- 권장 생산 루트 및 참조 장비 구성 확인 예정
- 견적 장비 목록 및 장비 공급 범위 확인 예정
- 견적 장비에 필요한 인터페이스 확인 예정
- 제안서에 명시된 문서화, 시운전, 교육 및 사후 서비스 범위 확인 예정
03 함께 확인됨 공동 확인 기술 인터페이스, 수락 및 프로젝트 조정 4 항목
기술 인터페이스, 수락 및 프로젝트 조정은 양측 프로젝트 팀의 서면 확인이 필요합니다.
- 최종 공정 루트 및 장비 구성 확인 예정
- 배치, 인터페이스 분할 및 현장 준비 조건 확인 예정
- 수락 기준, 시험 조건 및 샘플링 방법 확인 예정
- 납품, 설치, 시운전 일정, 변경 사항 및 최종 승인 확인 예정
Identify the inputs needed to review the ASU production route.
첫 번째 공학 검토 시 논의할 계획 주제를 선택하세요. 선택은 검토 주제를 표시할 뿐, 기술적 값, 장비 수량, 재료 등급, 성능 목표 또는 공급 범위를 승인하는 것이 아닙니다.
Review the available ASU references and what still needs confirmation.
These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
아직 계획 주제가 선택되지 않았습니다. 검토 우선순위를 추가하려면 섹션 05로 돌아가세요.
HK-50 PBT loose-tube line reference
Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.
These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
What Brazil customers value in an ASU project discussion.
Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU
제안을 요청하기 전에 라인을 명확히 하십시오.
These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.
이 참조 경로는 ASU 케이블 구조를 기반으로 하고 있나요?
The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.
두 단계 경로는 사전에 염색된 광섬유를 가정합니까?
Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.
페이지에 코어 생산 단계가 두 개로 표시되는 이유는 무엇입니까?
HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.
HK-50 및 HK-90 ASU가 최종 장비 구성인가요?
아니요. 이는 공정 경로를 설명하기 위해 사용되는 참조 생산 단계 모델입니다. 최종 모듈 수량, 치수, 제어장치, 유틸리티, 선택적 시스템 및 장비 인터페이스는 케이블 도면, 재료, 용량 목표 및 공장 조건을 검토한 후에만 확정됩니다.
기존 장비 또는 구매자 제공 자재를 통합할 수 있습니까?
기술 검토를 전제로 가능합니다. HONGKAI은 기존 장비 또는 구매자 제공 재료를 제안된 경로에 포함하기 전에 재료 패키지 크기, 장력 범위, 라인 인터페이스, 제어 신호, 치수, 유틸리티, 운영 조건 및 요구 테스트를 확인해야 합니다.
라인 속도 및 생산 능력을 확인하기 위해 필요한 정보는 무엇입니까?
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.
기계 이미지 및 공정 동영상은 최종 공급 장비인가요?
No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.
검사, FAT, 설치 및 교육이 포함되어 있나요?
Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.
최종 케이블 구조, 성능, 장비, 수락 기준 및 공급 범위는 상호 승인된 기술 및 상업 계약에서만 정의됩니다.
광섬유 케이블 생산 투자를 계획하세요.
목표 케이블 패밀리, 계획 용량, 공장 조건 및 현재 프로젝트 단계를 공유하세요. HONGKAI은 프로젝트별 제안서를 준비하기 전에 공정 경로, 장비 범위, 시스템 인터페이스 및 열려 있는 기술 항목을 검토합니다.
HONGKAI이 검토하는 내용
- 목표 제품 계획
- 케이블 패밀리, 구조, 섬유 수 및 재료 요구 사항
- 공정 경로
- 시작 재료, 필요한 공정 및 장비 인터페이스
- 생산 능력 목표
- 제품 혼합, 예상 출력 및 목표 라인 속도
- 공장 조건
- 사용 가능한 공간, 유틸리티, 기존 장비 및 테스트 요구사항
- 프로젝트 단계
- 계획, 예산 수립, 공장 준비 또는 생산 확장
- 검토 상태
- 초기 평가 · 기술 확인 필요
준비할 사항 · 6 항목
- 대상 케이블 유형, 참조 샘플 또는 사용 가능한 도면
- 섬유 수, 케이블 구조 및 재료 요구사항
- 시작 재료 및 필요한 생산 공정
- 목표 출력, 제품 혼합 또는 예상 라인 속도
- 기존 장비, 리ール 크기 및 사용 가능한 공장 레이아웃
- 유틸리티, 테스트 요구사항 및 계획된 프로젝트 일정
완전한 사양이 아직 없나요? 목표 제품과 현재 가정을 공유해 주십시오. 확인되지 않은 항목은 “확인 예정”으로 유지할 수 있습니다.
여기서 제출된 정보는 초기 기술 검토를 지원합니다. 최종 장비 구성, 성능, 가격, 납기 일정 및 공급 범위는 승인된 제안서 또는 계약서에서만 확인됩니다.
광섬유 케이블 생산 프로젝트 개요
계획 중인 케이블 제품, 목표 생산 능력 및 현재 투자 단계를 알려주세요. 부분적인 정보도 환영하며, 사용 가능한 경우 케이블 도면을 업로드할 수 있습니다.
