ASU Cable Production Line for Central Loose-Tube Aerial Cable

Apa yang dihasilkan rute produksi ini? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.

Rute produksi
HK-50 → HK-90 ASU
Pendekatan kontrol
Kontrol terkoordinasi ditinjau untuk setiap tahap produksi
Proses utama
PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
Rentang kabel yang sesuai
ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
02 ASU cable anatomy

Read the ASU cable from the inside out.

Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.

Pelat tampilan terurai teknik Reference central loose-tube ASU construction
ASU fiber optic cable 3D structure showing the central loose tube and two parallel FRP strength members 01 Referensi terpasang
Ikhtisar · beralih tampilan tanpa meninggalkan bagian ini Semua komponen kabel tetap terlihat sementara margin putih berlebih dikurangi.
Rute struktur-ke-proses

Two core stages form the reference ASU cable.

Pilih lapisan di atas untuk menyoroti tahap yang menyiapkan, membentuk, atau mengintegrasikannya.

01HK-50 · Ekstrusi tabung longgarForm the jelly-filled PBT loose tube around colored fibers.
02HK-90 ASU · SZ forming + sheathPosition two FRP rods and the ripcord, then extrude the PE jacket.
Referensi batas: this generated exploded render explains the layer relationship, not a final manufacturing drawing. The generated image is a structure explainer; confirm fiber count, jelly system, FRP diameter and spacing, ripcord position, jacket material and all dimensions against the approved cable drawing.
03 Konfigurasi referensi

Tinjau konfigurasi produksi untuk lapisan kabel yang dipilih.

The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.

Dibawa dari struktur kabel Tidak ada lapisan kabel yang dipilih Mulai dari struktur kabel di atas, atau tinjau rute referensi lengkap di bawah.
Pilih lapisan kabel
Gambar jalur produksi referensi Gambar referensi · Tata letak khusus proyek
HONGKAI HK-50 PBT loose-tube production line used as the first core ASU production stage
Gambar tahap yang dipilih PBT loose-tube production
Awal rute referensi

HK-50

PBT loose-tube production

Combine colored fibers, filling compound and PBT material into the required central loose tube.

Input
Approved colored optical fibers + filling compound + PBT
Output
Jelly-filled PBT loose tube
Posisi rute
Stage 01 · Central loose-tube formation
Tahap produksi referensi
Peran proses

Form the jelly-filled PBT loose tube

Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.

Ruang lingkup referensi

Fiber feeding · jelly filling · PBT extrusion

This stage forms the single loose tube used at the center of the reference ASU construction.

Konfirmasi sebelum proposal

Fiber count, tube geometry and material system

Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.

Reference route only. Final equipment scope follows the approved cable drawing.

Jumlah mesin, dimensi, kinerja, sistem pendukung, dan susunan akhir dikonfirmasi berdasarkan konstruksi kabel dan persyaratan proyek.

03B Stage 02 process video

See the ASU-specific downstream production line in operation.

This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.

HONGKAI video · ASU Stage 02 process reference Tonton di YouTube
Reference boundary: the video shows an ASU HK-90-specific forming and sheathing process, but it does not confirm the final machine quantities, arrangement, capacity, interfaces, supplied scope, acceptance result or project performance. If the embedded player is unavailable, use "Watch on YouTube" above.
04 Tanggung jawab proyek

Define the ASU project boundary before the route is finalized.

The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

Status ruang lingkup Diperlukan tinjauan teknik

Tidak ada yang di bawah ini dianggap termasuk, dikeluarkan, disediakan pembeli, atau disediakan HONGKAI- sampai dikonfirmasi secara tertulis.

Matriks tanggung jawab Tinjau ketiga kelompok tanggung jawab

Membuka grup hanya menampilkan detailnya; tidak mengonfirmasi lingkup.

Pembeli menyiapkan Tanggung jawab pembeli Informasi proyek, produk, dan lokasi untuk tinjauan teknis 4 items

Informasi HONGKAI harus ditinjau sebelum menetapkan rute produksi dan konfigurasi peralatan referensi.

  • Gambar kabel dan persyaratan produk target untuk ditinjau Untuk dikonfirmasi
  • Bahan awal, grade, dan format pasokan Untuk dikonfirmasi
  • Ruang pabrik, utilitas, akses, dan kondisi pemasangan Untuk dikonfirmasi
  • Informasi peralatan yang ada dan antarmuka hulu/hilir Untuk dikonfirmasi
Didefinisikan dalam proposal tertulis Tanggung jawab HONGKAI Konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip 4 items

HONGKAI menentukan konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip setelah meninjau input proyek yang tersedia.

  • Rute produksi yang direkomendasikan dan konfigurasi peralatan referensi Untuk dikonfirmasi
  • Daftar peralatan yang dikutip dan batasan sumber peralatan Untuk dikonfirmasi
  • Antarmuka yang diperlukan untuk peralatan yang dikutip Untuk dikonfirmasi
  • Lingkup dokumentasi, commissioning, pelatihan, dan pascapenjualan yang dinyatakan dalam proposal Untuk dikonfirmasi
Dikonfirmasi bersama Konfirmasi bersama Antarmuka teknis, penerimaan, dan koordinasi proyek 4 items

Antarmuka teknis, penerimaan, dan koordinasi proyek memerlukan konfirmasi tertulis dari kedua tim proyek.

  • Rute proses akhir dan konfigurasi peralatan Untuk dikonfirmasi
  • Tata letak, pembagian antarmuka, dan kondisi kesiapan lokasi Untuk dikonfirmasi
  • Kriteria penerimaan, kondisi pengujian, dan metode pengambilan sampel Untuk dikonfirmasi
  • Jadwal pengiriman, pemasangan, uji coba, perubahan, dan penandatanganan akhir Untuk dikonfirmasi

05 Masukan perencanaan

Identify the inputs needed to review the ASU production route.

Pilih topik perencanaan yang siap Anda diskusikan selama tinjauan teknis pertama. Pemilihan menandai topik tinjauan saja; tidak mengesahkan nilai teknis, jumlah peralatan, grade bahan, target kinerja, atau lingkup pasokan.

Pilih topik perencanaan jalur produksi yang akan ditinjau
06 Reference & verification

Review the available ASU references and what still needs confirmation.

These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.

Section 05 context carried forward HK-50 loose-tube extrusion → HK-90 ASU dual-FRP positioning, SZ forming and PE sheathing

No planning topics selected yet. Return to Section 05 to add review priorities.

Reference image of the HK-50 PBT loose-tube production line used for the first ASU production stage
Stage 01 reference
Not final arrangement
Reference available

HK-50 PBT loose-tube line reference

Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.

These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.

Selected ASU production-stage reference image
Stage 01 reference

HK-50 PBT loose-tube line reference

1 dari 2
Brazil ASU customer feedback

What Brazil customers value in an ASU project discussion.

Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU

07 Rute FAQ

Jelaskan rute sebelum meminta penawaran.

These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.

Konstruksi kabel ASU apa yang menjadi dasar rute referensi ini?

The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.

Apakah rute dua tahap mengasumsikan serat optik yang sudah berwarna?

Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.

Mengapa halaman menampilkan dua tahap produksi inti?

HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.

Apakah HK-50 dan HK-90 ASU merupakan konfigurasi peralatan akhir?

Tidak. Mereka adalah model tahap produksi referensi yang digunakan untuk menjelaskan rute proses. Jumlah modul akhir, dimensi, kontrol, utilitas, sistem opsional, dan antarmuka peralatan dikonfirmasi hanya setelah meninjau gambar kabel, material, target kapasitas, dan kondisi pabrik.

Apakah peralatan yang sudah ada atau bahan yang disediakan pembeli dapat diintegrasikan?

Berpotensi, tergantung pada tinjauan teknis. HONGKAI harus mengonfirmasi ukuran paket material, rentang tegangan, antarmuka jalur, sinyal kontrol, dimensi, utilitas, kondisi operasi, dan tes yang diperlukan sebelum peralatan yang ada atau material yang disediakan pembeli dimasukkan ke dalam rute yang diusulkan.

Informasi apa yang diperlukan untuk mengonfirmasi kecepatan lini dan kapasitas produksi?

Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.

Apakah gambar mesin dan video proses adalah peralatan yang akhirnya disuplai?

No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.

Apakah inspeksi, FAT, instalasi, dan pelatihan termasuk?

Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.

Konstruksi kabel akhir, kinerja, peralatan, kriteria penerimaan, dan cakupan pasokan hanya ditentukan dalam perjanjian teknis dan komersial yang disetujui bersama.

08 Pertanyaan investasi

Rencanakan investasi produksi kabel serat optik Anda.

Bagikan keluarga kabel target, kapasitas yang direncanakan, kondisi pabrik, dan tahap proyek saat ini. HONGKAI akan meninjau rute proses, lingkup peralatan, antarmuka sistem, dan item teknis terbuka sebelum menyiapkan proposal khusus proyek.

Konteks halaman saat ini ASU central loose-tube aerial cable · HK-50 → HK-90 ASU reference route Konteks ini menyertai permintaan sebagai referensi. Ini tidak mengonfirmasi rute produksi akhir atau konfigurasi peralatan. Masukan perencanaan tetap terbuka · Tahap pendukung tidak dilanjutkan

Apa yang akan ditinjau HONGKAI

Rencana produk target
Kelompok kabel, konstruksi, jumlah serat, dan persyaratan material
Rute proses
Bahan awal, proses yang diperlukan, dan antarmuka peralatan
Target kapasitas
Campuran produk, output yang diharapkan, dan kecepatan garis target
Kondisi pabrik
Ruang tersedia, utilitas, peralatan yang ada, dan kebutuhan pengujian
Tahap proyek
Perencanaan, penganggaran, persiapan pabrik, atau ekspansi produksi
Status tinjauan
Penilaian awal · Diperlukan konfirmasi teknis
Apa yang perlu disiapkan · item 6
  • Jenis kabel target, sampel referensi, atau gambar yang tersedia
  • Jumlah serat, struktur kabel, dan persyaratan material
  • Bahan awal dan proses produksi yang diperlukan
  • Target output, product mix atau kecepatan lini yang diharapkan
  • Peralatan yang ada, ukuran reel, dan tata letak pabrik yang tersedia
  • Utilitas, persyaratan pengujian, dan jadwal proyek yang direncanakan

Belum ada spesifikasi lengkap? Bagikan produk target dan asumsi saat ini Anda. Item yang belum dikonfirmasi dapat tetap berstatus “Untuk dikonfirmasi”.

Informasi yang diserahkan di sini mendukung tinjauan teknis awal. Konfigurasi peralatan akhir, kinerja, harga, jadwal pengiriman, dan cakupan pasokan hanya dikonfirmasi dalam proposal atau perjanjian yang disetujui.

Ringkasan proyek investasi

Ringkasan Proyek Produksi Kabel Serat Optik

Katakan kepada kami produk kabel yang direncanakan, kapasitas target, dan tahap investasi saat ini. Informasi sebagian pun diterima, dan Anda dapat mengunggah gambar kabel bila tersedia.

Konteks kontak

Kabel & aplikasi

Lingkup proyek

Seret & Lepaskan File, Pilih File untuk Diunggah
Unggah gambar gambar kabel, sampel produk, atau spesifikasi teknis jika tersedia.

Minta penawaran

kami akan membalas Anda dalam waktu 24 jam!!!