Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
Tinjau setiap proses dan peralatannya
ASU Cable Production Line for Central Loose-Tube Aerial Cable
ASU production-line panorama · Complete route remains visible
Apa yang dihasilkan rute produksi ini? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.
- Rute produksi
- HK-50 → HK-90 ASU
- Pendekatan kontrol
- Kontrol terkoordinasi ditinjau untuk setiap tahap produksi
- Proses utama
- PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
- Rentang kabel yang sesuai
- ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
Tinjau setiap proses dan peralatannya
Read the ASU cable from the inside out.
Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.
01
Referensi terpasang
Two core stages form the reference ASU cable.
Pilih lapisan di atas untuk menyoroti tahap yang menyiapkan, membentuk, atau mengintegrasikannya.
Tinjau konfigurasi produksi untuk lapisan kabel yang dipilih.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.
HK-50
PBT loose-tube production
Combine colored fibers, filling compound and PBT material into the required central loose tube.
- Input
- Approved colored optical fibers + filling compound + PBT
- Output
- Jelly-filled PBT loose tube
- Posisi rute
- Stage 01 · Central loose-tube formation
Form the jelly-filled PBT loose tube
Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.
Fiber feeding · jelly filling · PBT extrusion
This stage forms the single loose tube used at the center of the reference ASU construction.
Fiber count, tube geometry and material system
Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.
Jumlah mesin, dimensi, kinerja, sistem pendukung, dan susunan akhir dikonfirmasi berdasarkan konstruksi kabel dan persyaratan proyek.
See the ASU-specific downstream production line in operation.
This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.
Define the ASU project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Tidak ada yang di bawah ini dianggap termasuk, dikeluarkan, disediakan pembeli, atau disediakan HONGKAI- sampai dikonfirmasi secara tertulis.
Membuka grup hanya menampilkan detailnya; tidak mengonfirmasi lingkup.
01 Pembeli menyiapkan Tanggung jawab pembeli Informasi proyek, produk, dan lokasi untuk tinjauan teknis 4 items
Informasi HONGKAI harus ditinjau sebelum menetapkan rute produksi dan konfigurasi peralatan referensi.
- Gambar kabel dan persyaratan produk target untuk ditinjau Untuk dikonfirmasi
- Bahan awal, grade, dan format pasokan Untuk dikonfirmasi
- Ruang pabrik, utilitas, akses, dan kondisi pemasangan Untuk dikonfirmasi
- Informasi peralatan yang ada dan antarmuka hulu/hilir Untuk dikonfirmasi
02 Didefinisikan dalam proposal tertulis Tanggung jawab HONGKAI Konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip 4 items
HONGKAI menentukan konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip setelah meninjau input proyek yang tersedia.
- Rute produksi yang direkomendasikan dan konfigurasi peralatan referensi Untuk dikonfirmasi
- Daftar peralatan yang dikutip dan batasan sumber peralatan Untuk dikonfirmasi
- Antarmuka yang diperlukan untuk peralatan yang dikutip Untuk dikonfirmasi
- Lingkup dokumentasi, commissioning, pelatihan, dan pascapenjualan yang dinyatakan dalam proposal Untuk dikonfirmasi
03 Dikonfirmasi bersama Konfirmasi bersama Antarmuka teknis, penerimaan, dan koordinasi proyek 4 items
Antarmuka teknis, penerimaan, dan koordinasi proyek memerlukan konfirmasi tertulis dari kedua tim proyek.
- Rute proses akhir dan konfigurasi peralatan Untuk dikonfirmasi
- Tata letak, pembagian antarmuka, dan kondisi kesiapan lokasi Untuk dikonfirmasi
- Kriteria penerimaan, kondisi pengujian, dan metode pengambilan sampel Untuk dikonfirmasi
- Jadwal pengiriman, pemasangan, uji coba, perubahan, dan penandatanganan akhir Untuk dikonfirmasi
Identify the inputs needed to review the ASU production route.
Pilih topik perencanaan yang siap Anda diskusikan selama tinjauan teknis pertama. Pemilihan menandai topik tinjauan saja; tidak mengesahkan nilai teknis, jumlah peralatan, grade bahan, target kinerja, atau lingkup pasokan.
Review the available ASU references and what still needs confirmation.
These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-50 PBT loose-tube line reference
Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.
These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
What Brazil customers value in an ASU project discussion.
Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU
Jelaskan rute sebelum meminta penawaran.
These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.
Konstruksi kabel ASU apa yang menjadi dasar rute referensi ini?
The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.
Apakah rute dua tahap mengasumsikan serat optik yang sudah berwarna?
Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.
Mengapa halaman menampilkan dua tahap produksi inti?
HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.
Apakah HK-50 dan HK-90 ASU merupakan konfigurasi peralatan akhir?
Tidak. Mereka adalah model tahap produksi referensi yang digunakan untuk menjelaskan rute proses. Jumlah modul akhir, dimensi, kontrol, utilitas, sistem opsional, dan antarmuka peralatan dikonfirmasi hanya setelah meninjau gambar kabel, material, target kapasitas, dan kondisi pabrik.
Apakah peralatan yang sudah ada atau bahan yang disediakan pembeli dapat diintegrasikan?
Berpotensi, tergantung pada tinjauan teknis. HONGKAI harus mengonfirmasi ukuran paket material, rentang tegangan, antarmuka jalur, sinyal kontrol, dimensi, utilitas, kondisi operasi, dan tes yang diperlukan sebelum peralatan yang ada atau material yang disediakan pembeli dimasukkan ke dalam rute yang diusulkan.
Informasi apa yang diperlukan untuk mengonfirmasi kecepatan lini dan kapasitas produksi?
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.
Apakah gambar mesin dan video proses adalah peralatan yang akhirnya disuplai?
No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.
Apakah inspeksi, FAT, instalasi, dan pelatihan termasuk?
Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.
Konstruksi kabel akhir, kinerja, peralatan, kriteria penerimaan, dan cakupan pasokan hanya ditentukan dalam perjanjian teknis dan komersial yang disetujui bersama.
Rencanakan investasi produksi kabel serat optik Anda.
Bagikan keluarga kabel target, kapasitas yang direncanakan, kondisi pabrik, dan tahap proyek saat ini. HONGKAI akan meninjau rute proses, lingkup peralatan, antarmuka sistem, dan item teknis terbuka sebelum menyiapkan proposal khusus proyek.
Apa yang akan ditinjau HONGKAI
- Rencana produk target
- Kelompok kabel, konstruksi, jumlah serat, dan persyaratan material
- Rute proses
- Bahan awal, proses yang diperlukan, dan antarmuka peralatan
- Target kapasitas
- Campuran produk, output yang diharapkan, dan kecepatan garis target
- Kondisi pabrik
- Ruang tersedia, utilitas, peralatan yang ada, dan kebutuhan pengujian
- Tahap proyek
- Perencanaan, penganggaran, persiapan pabrik, atau ekspansi produksi
- Status tinjauan
- Penilaian awal · Diperlukan konfirmasi teknis
Apa yang perlu disiapkan · item 6
- Jenis kabel target, sampel referensi, atau gambar yang tersedia
- Jumlah serat, struktur kabel, dan persyaratan material
- Bahan awal dan proses produksi yang diperlukan
- Target output, product mix atau kecepatan lini yang diharapkan
- Peralatan yang ada, ukuran reel, dan tata letak pabrik yang tersedia
- Utilitas, persyaratan pengujian, dan jadwal proyek yang direncanakan
Belum ada spesifikasi lengkap? Bagikan produk target dan asumsi saat ini Anda. Item yang belum dikonfirmasi dapat tetap berstatus “Untuk dikonfirmasi”.
Informasi yang diserahkan di sini mendukung tinjauan teknis awal. Konfigurasi peralatan akhir, kinerja, harga, jadwal pengiriman, dan cakupan pasokan hanya dikonfirmasi dalam proposal atau perjanjian yang disetujui.
Ringkasan Proyek Produksi Kabel Serat Optik
Katakan kepada kami produk kabel yang direncanakan, kapasitas target, dan tahap investasi saat ini. Informasi sebagian pun diterima, dan Anda dapat mengunggah gambar kabel bila tersedia.
