Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
راجع كل عملية ومعداتها
ASU Cable Production Line for Central Loose-Tube Aerial Cable
ASU production-line panorama · Complete route remains visible
ما الذي تنتجه مسار الإنتاج هذا؟ This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.
- مسار الإنتاج
- HK-50 → HK-90 ASU
- نهج التحكم
- تم مراجعة أنظمة التحكم المنسقة لكل مرحلة إنتاج
- العمليات الرئيسية
- PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
- مدى الكابلات المناسب
- ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
راجع كل عملية ومعداتها
Read the ASU cable from the inside out.
Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.
01
مرجع مُجمَّع
Two core stages form the reference ASU cable.
حدد طبقة أعلاه لتسليط الضوء على المرحلة التي تعدّها أو تشكّلها أو تدمجها في الكابل.
Review the production configuration for the selected cable layer.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.
HK-50
PBT loose-tube production
Combine colored fibers, filling compound and PBT material into the required central loose tube.
- المدخل
- Approved colored optical fibers + filling compound + PBT
- المخرج
- Jelly-filled PBT loose tube
- موقع المسار
- Stage 01 · Central loose-tube formation
Form the jelly-filled PBT loose tube
Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.
Fiber feeding · jelly filling · PBT extrusion
This stage forms the single loose tube used at the center of the reference ASU construction.
Fiber count, tube geometry and material system
Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.
كميات الآلات والأبعاد والأداء وأنظمة المساعدة والترتيب النهائي مُؤكدة وفقًا لبناء الكابل ومتطلبات المشروع.
See the ASU-specific downstream production line in operation.
This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.
Define the ASU project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
فتح مجموعة ما يكشف تفاصيلها فقط؛ ولا يؤكد النطاق.
01 يُعد المشتري مسؤولية المشتري معلومات المشروع والمنتج والموقع للمراجعة الهندسية 4 items
يجب على المعلومات HONGKAI مراجعتها قبل تحديد مسار الإنتاج وتكوين المعدات المرجعية.
- رسم الكابل المستهدف ومتطلبات المنتج للمراجعة قيد التأكيد
- المواد الأولية، والدرجات، وتنسيقات التوريد قيد التأكيد
- مساحة المصنع، والمرافق، وظروف الوصول والتثبيت قيد التأكيد
- معلومات المعدات الحالية وواجهات الطرف العلوي/السفلي قيد التأكيد
02 محدد في العرض المكتوب مسؤولية HONGKAI تكوين موصى به وحدود التوريد المقتبس 4 items
HONGKAI يحدد التكوين الموصى به وحدود التوريد المقتبس بعد مراجعة المدخلات المتاحة للمشروع.
- مسار إنتاج موصى به وتكوين المعدات المرجعية قيد التأكيد
- قائمة المعدات المقتبسة وحدود مصدر المعدات قيد التأكيد
- الواجهات المطلوبة للمعدات المقتبسة قيد التأكيد
- نطاق الوثائق، والتشغيل، والتدريب، وما بعد البيع المذكور في العرض قيد التأكيد
03 تم التأكيد معًا تأكيد مشترك الواجهات الفنية، القبول، وتنسيق المشروع 4 items
تتطلب الواجهات الفنية، القبول، وتنسيق المشروع تأكيدًا كتابيًا من فريقَي المشروع.
- مسار العملية النهائي وتكوين المعدات قيد التأكيد
- الترتيب، تقسيم الواجهات، وشروط جاهزية الموقع قيد التأكيد
- معايير القبول، شروط الاختبار وأسلوب أخذ العينات قيد التأكيد
- التسليم، التركيب، جدول الاختبار، التغييرات، والتوقيع النهائي قيد التأكيد
Identify the inputs needed to review the ASU production route.
اختر مواضيع التخطيط التي أنت مستعد لمناقشتها خلال المراجعة الهندسية الأولى. الاختيار يُسجّل موضوع المراجعة فقط؛ ولا يوافق على قيمة تقنية أو كمية معدات أو درجة مواد أو هدف أداء أو نطاق توريد.
Review the available ASU references and what still needs confirmation.
These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
لم يتم اختيار أي مواضيع تخطيطية بعد. عد إلى القسم 05 لإضافة أولويات المراجعة.
HK-50 PBT loose-tube line reference
Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.
These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
What Brazil customers value in an ASU project discussion.
Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU
وضح المسار قبل طلب عرض سعر.
These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.
ما هي بنية الكابل ASU التي تستند إليها هذه المسار المرجعي؟
The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.
هل يفترض مسار المرحلتين وجود الألياف البصرية مسبقة الصبغ؟
Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.
لماذا تُظهر الصفحة مرحلتين إنتاجيتين أساسيتين؟
HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.
هل تكون HK-50 و HK-90 ASU هي التكوين النهائي للمعدات؟
لا. إنها نماذج مرجعية من مرحلة الإنتاج تُستخدم لشرح مسار العملية. يتم تأكيد الكميات النهائية للوحدة، والأبعاد، والتحكم، والمرافق، والأنظمة الاختيارية، وواجهات المعدات فقط بعد مراجعة رسم الكابل، والمواد، وهدف السعة، وظروف المصنع.
هل يمكن دمج المعدات الحالية أو المواد الموردة من المشتري؟
بشكل محتمل، رهناً بمراجعة تقنية. يجب على HONGKAI تأكيد أحجام حزم المواد، ونطاقات الشد، وواجهات الخط، وإشارات التحكم، والأبعاد، والمرافق، وظروف التشغيل، والاختبارات المطلوبة قبل تضمين المعدات القائمة أو المواد الموردة من المشتري في مسار المقترح.
ما المعلومات المطلوبة لتأكيد سرعة الخط والقدرة الإنتاجية؟
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.
هل صور الآلة وفيديو العملية هما المعدات النهائية الموردة؟
No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.
هل تتضمن الفحص، FAT، التثبيت والتدريب؟
Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.
يتم تحديد بنية الكابل النهائية، والأداء، والمعدات، ومعايير القبول، ونطاق التوريد فقط في الاتفاقية التقنية والتجارية المعتمدة متبادلاً.
خطط لاستثمارك في إنتاج كابلات الألياف البصرية.
شارك عائلات الكابلات المستهدفة، والسعة المخطط لها، وظروف المصنع، ومرحلة المشروع الحالية. سيقوم HONGKAI بمراجعة مسار العملية، ونطاق المعدات، وواجهات النظام، والبنود الفنية المفتوحة قبل إعداد اقتراح مخصص للمشروع.
ما الذي سيُراجعه HONGKAI
- خطة المنتج المستهدفة
- عائلات الكابلات، والتصاميم، وعدد الألياف، ومتطلبات المواد
- مسار العملية
- المواد الأولية، والعمليات المطلوبة، وواجهات المعدات
- الهدف الإنتاجي
- مزيج المنتجات، والإنتاج المتوقع، وسرعة الخط المستهدفة
- ظروف المصنع
- المساحة المتاحة، المرافق، المعدات الحالية واحتياجات الاختبار
- مرحلة المشروع
- التخطيط، الميزنة، إعداد المصنع أو توسيع الإنتاج
- حالة المراجعة
- التقييم الأولي · مطلوب تأكيد فني
ما يجب إعداده · عناصر 6
- أنواع الكابلات المستهدفة، عينات مرجعية أو رسومات متاحة
- عدد الألياف، هياكل الكابلات ومتطلبات المواد
- المواد الأولية وعمليات الإنتاج المطلوبة
- الإنتاج المستهدف، مزيج المنتجات أو السرعة المتوقعة للخط
- المعدات الحالية، أحجام البكرات وتصميم المصنع المتاح
- المرافق، متطلبات الاختبار وجدول المشروع المخطط
لا توجد مواصفات كاملة بعد؟ شارك منتجاتك المستهدفة وافتراضاتك الحالية. يمكن ترك العناصر غير المؤكدة كـ “قيد التأكيد”.
المعلومات المقدمة هنا تدعم مراجعة تقنية أولية. يتم تأكيد التكوين النهائي للمعدات والأداء والسعر وجداول التسليم ونطاق التوريد فقط في اقتراح أو اتفاقية معتمدة.
ملخص مشروع إنتاج كابلات الألياف البصرية
أخبرنا عن منتجات الكابلات المخطط لها، والقدرة المستهدفة ومرحلة الاستثمار الحالية. المعلومات الجزئية مقبولة، ويمكنك رفع رسم كابل عند توفره.
