ASU Cable Production Line for Central Loose-Tube Aerial Cable

Что производит этот производственный маршрут? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.

Производственный маршрут
HK-50 → HK-90 ASU
Подход к управлению
Согласованные системы управления, проверенные для каждого производственного этапа
Основные процессы
PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
Подходящий диапазон кабелей
ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
02 ASU cable anatomy

Read the ASU cable from the inside out.

Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.

Инженерная плита взрывного вида Reference central loose-tube ASU construction
ASU fiber optic cable 3D structure showing the central loose tube and two parallel FRP strength members 01 Собранный справочник
Обзор · переключайте представления, не покидая этот раздел Все компоненты кабеля остаются видимыми, при этом избыточная белая поля уменьшена.
Маршрут от структуры к процессу

Two core stages form the reference ASU cable.

Выберите слой выше, чтобы выделить этап, который готовит, формирует или интегрирует его.

01HK-50 · Экструзия свободных трубокForm the jelly-filled PBT loose tube around colored fibers.
02HK-90 ASU · SZ forming + sheathPosition two FRP rods and the ripcord, then extrude the PE jacket.
Эталонная граница: this generated exploded render explains the layer relationship, not a final manufacturing drawing. The generated image is a structure explainer; confirm fiber count, jelly system, FRP diameter and spacing, ripcord position, jacket material and all dimensions against the approved cable drawing.
03 Референсная конфигурация

Проверьте конфигурацию производства для выбранного слоя кабеля.

The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.

Переносится из конструкции кабеля Слой кабеля не выбран Начните с конструкции кабеля выше или просмотрите полный маршрут ссылки ниже.
Выберите слой кабеля
Изображение производственной линии ссылки Эталонное изображение · Спецификация проекта
HONGKAI HK-50 PBT loose-tube production line used as the first core ASU production stage
Выбранное изображение этапа PBT loose-tube production
Начало маршрута ссылки

HK-50

PBT loose-tube production

Combine colored fibers, filling compound and PBT material into the required central loose tube.

Вход
Approved colored optical fibers + filling compound + PBT
Выход
Jelly-filled PBT loose tube
Позиция маршрута
Stage 01 · Central loose-tube formation
Ссылочный производственный этап
Роль процесса

Form the jelly-filled PBT loose tube

Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.

Область ссылки

Fiber feeding · jelly filling · PBT extrusion

This stage forms the single loose tube used at the center of the reference ASU construction.

Подтвердить перед предложением

Fiber count, tube geometry and material system

Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.

Reference route only. Final equipment scope follows the approved cable drawing.

Количество машин, размеры, производительность, вспомогательные системы и окончательная компоновка утверждаются в соответствии с конструкцией кабеля и требованиями проекта.

03B Stage 02 process video

See the ASU-specific downstream production line in operation.

This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.

HONGKAI video · ASU Stage 02 process reference Смотреть на YouTube
Reference boundary: the video shows an ASU HK-90-specific forming and sheathing process, but it does not confirm the final machine quantities, arrangement, capacity, interfaces, supplied scope, acceptance result or project performance. If the embedded player is unavailable, use "Watch on YouTube" above.
04 Ответственность за проект

Define the ASU project boundary before the route is finalized.

The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

Статус объема работ Требуется инженерный обзор

Ничто из нижеперечисленного не считается включенным, исключенным, поставляемым покупателем или HONGKAI-поставляемым, пока это не подтверждено в письменной форме.

Матрица ответственности Проверьте все три группы ответственности

Раскрытие группы показывает только ее детали; это не подтверждает объем работ.

Подготавливает покупатель Ответственность покупателя Информация о проекте, продукте и объекте для инженерного анализа Элементы 4

Информация HONGKAI должна быть рассмотрена до фиксации производственного маршрута и конфигурации эталонного оборудования.

  • Целевая схема кабеля и требования к продукту для проверки Требует подтверждения
  • Исходные материалы, марки и форматы поставки Требует подтверждения
  • Производственные площади, коммунальные услуги, условия доступа и монтажа Требует подтверждения
  • Существующее оборудование и информация о взаимосвязях с предшествующими и последующими процессами Требует подтверждения
Определено в письменном предложении Ответственность HONGKAI Рекомендуемая конфигурация и границы поставки, указанные в ценовом предложении Элементы 4

HONGKAI определяет рекомендуемую конфигурацию и границы поставки после анализа доступных данных проекта.

  • Рекомендуемый производственный маршрут и эталонная конфигурация оборудования Требует подтверждения
  • Перечень оборудования с расценками и граница источника оборудования Требует подтверждения
  • Необходимые интерфейсы для оборудования с расценками Требует подтверждения
  • Объем документации, пуско-наладки, обучения и послепродажного обслуживания, указанный в предложении Требует подтверждения
Подтверждено совместно Совместное подтверждение Технические интерфейсы, приемка и координация проекта Элементы 4

Технические интерфейсы, приемка и координация проекта требуют письменного подтверждения от обеих команд проекта.

  • Финальный производственный маршрут и конфигурация оборудования Требует подтверждения
  • Размещение, разделение интерфейсов и условия готовности площадки Требует подтверждения
  • Критерии приемки, условия испытаний и метод отбора проб Требует подтверждения
  • График поставки, монтажа, испытаний, изменений и окончательного согласования Требует подтверждения

05 Входные данные для планирования

Identify the inputs needed to review the ASU production route.

Выберите темы планирования, которые вы готовы обсудить на первом инженерном обзоре. Выбор обозначает тему для обзора, но не подтверждает технические параметры, количество оборудования, марку материала, целевые показатели производительности или объем поставки.

Select the production-line planning topics to review
06 Ссылки и верификация

Review the available ASU references and what still needs confirmation.

These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.

Контекст раздела 05, перенесенный далее HK-50 loose-tube extrusion → HK-90 ASU dual-FRP positioning, SZ forming and PE sheathing

Пока не выбрано ни одной темы планирования. Вернитесь в раздел 05, чтобы добавить приоритеты проверки.

Reference image of the HK-50 PBT loose-tube production line used for the first ASU production stage
Справочный этап 01
Не окончательная компоновка
Справка доступна

HK-50 PBT loose-tube line reference

Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.

These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.

Selected ASU production-stage reference image
Справочный этап 01

HK-50 PBT loose-tube line reference

1 of 2
Brazil ASU customer feedback

What Brazil customers value in an ASU project discussion.

Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU

07 Маршрут FAQ

Уточните маршрут до запроса коммерческого предложения.

These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.

Какая конструкция кабеля ASU используется в этомreferенционном маршруте?

The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.

Предполагает ли двухэтапный маршрут предварительно окрашенный оптический волокно?

Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.

Почему на странице показаны две основные производственные стадии?

HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.

Являются ли HK-50 и HK-90 ASU окончательной конфигурацией оборудования?

Нет. Это справочные модели производственных этапов, используемые для объяснения маршрута процесса. Окончательное количество модулей, габариты, системы управления, коммунальные услуги, опциональные системы и интерфейсы оборудования подтверждаются только после рассмотрения чертежа кабеля, материалов, целевой производительности и условий завода.

Можно ли интегрировать существующее оборудование или материалы, предоставленные покупателем?

Потенциально, при условии технического обзора. HONGKAI должен подтвердить размеры пакетов материалов, диапазоны натяжения, интерфейсы линии, управляющие сигналы, габариты, коммунальные услуги, рабочие условия и требуемые испытания до включения существующего оборудования или материалов, поставляемых покупателем, в предложенный маршрут.

Какая информация необходима для подтверждения линейной скорости и производственной мощности?

Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.

Являются ли изображения машины и видео процесса окончательно поставляемым оборудованием?

No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.

Включены ли осмотр, FAT, установка и обучение?

Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.

Окончательная конструкция кабеля, его характеристики, оборудование, критерии приемки и объем поставки определяются исключительно взаимно утвержденным техническим и коммерческим соглашением.

08 Запрос на инвестиции

Спланируйте инвестиции в производство волоконно-оптических кабелей.

Укажите целевые семейства кабелей, запланированную мощность, условия на заводе и текущую стадию проекта. HONGKAI проанализирует маршрут процесса, объем оборудования, системные интерфейсы и открытые технические вопросы перед подготовкой специфического для проекта предложения.

Контекст текущей страницы ASU central loose-tube aerial cable · HK-50 → HK-90 ASU reference route Этот контекст приведен в качестве справки к запросу. Он не подтверждает финальный производственный маршрут или конфигурацию оборудования. Планируемые входные данные остаются открытыми · Этапы поддержки не переданы вперед

Что будет анализировать HONGKAI

План целевого продукта
Семейства кабелей, конструкции, количество волокон и требования к материалам
Маршрут процесса
Исходные материалы, требуемые процессы и интерфейсы оборудования
Целевая мощность
Смесь продукции, ожидаемый объем и целевая скорость линии
Условия на заводе
Доступное пространство, коммунальные услуги, существующее оборудование и потребности в тестировании
Стадия проекта
Планирование, бюджетирование, подготовка завода или расширение производства
Статус обзора
Предварительная оценка · Требуется техническое подтверждение
Что подготовить · 6 элементы
  • Целевые типы кабелей, справочные образцы или доступные чертежи
  • Количество волокон, конструкции кабелей и требования к материалам
  • Исходные материалы и требуемые производственные процессы
  • Целевой выход, ассортимент продукции или ожидаемая скорость линии
  • Существующее оборудование, размеры катушек и доступная планировка завода
  • Коммуникации, требования к испытаниям и запланированный срок реализации проекта

Еще нет полной спецификации? Укажите целевые продукты и текущие предположения. Неподтвержденные пункты могут остаться как “Требуется подтверждение”.

Информация, представленная здесь, служит основой для предварительного технического обзора. Окончательная конфигурация оборудования, производительность, цена, график поставки и объем поставки подтверждаются только в утвержденном предложении или соглашении.

Краткое описание инвестиционного проекта

Fiber Optic Cable Production Project Brief

Tell us your planned cable products, target capacity and current investment stage. Partial information is welcome, and you may upload a cable drawing when available.

Контекст контакта

Кабель и применение

Объем проекта

Перетащите файлы, Выберите файлы для загрузки
Загрузите чертеж кабеля, изображение образца продукта или техническую спецификацию, если они доступны.

Спросить цену

мы ответим вам в течение 24 часов!!!