Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
ഓരോ പ്രക്രിയയും അതിന്റെ ഉപകരണങ്ങളും പരിശോധിക്കുക
ASU Cable Production Line for Central Loose-Tube Aerial Cable
ASU production-line panorama · Complete route remains visible
ഈ ഉത്പാദന റൂട്ട് എന്ത് ഉത്പാദിപ്പിക്കുന്നു? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.
- വ്യവസായ പാതഥം
- HK-50 → HK-90 ASU
- നിയന്ത്രണ സമീപനം
- ഓരോ ഉൽപ്പാദന ഘട്ടത്തിനും സമന്വയിപ്പിച്ച നിയന്ത്രണങ്ങൾ പരിശോധിച്ചു
- പ്രധാന പ്രക്രിയകൾ
- PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
- അനുയോജ്യമായ കേബിൾ പരിധി
- ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
ഓരോ പ്രക്രിയയും അതിന്റെ ഉപകരണങ്ങളും പരിശോധിക്കുക
Read the ASU cable from the inside out.
Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.
01
അസംബ്ലി ചെയ്ത റഫറൻസ്
Two core stages form the reference ASU cable.
തയ്യാറാക്കുന്നതിനോ രൂപീകരിക്കുന്നതിനോ ഇന്റിഗ്രേറ്റ് ചെയ്യുന്നതിനോ സംബന്ധിച്ച ഘട്ടം ഹൈലൈറ്റ് ചെയ്യാൻ മുകളിലെ ഒരു പാളി തെരഞ്ഞെടുക്കുക.
Review the production configuration for the selected cable layer.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.
HK-50
PBT loose-tube production
Combine colored fibers, filling compound and PBT material into the required central loose tube.
- ഇൻപുട്ട്
- Approved colored optical fibers + filling compound + PBT
- ഔട്ട്പുട്ട്
- Jelly-filled PBT loose tube
- Route position
- Stage 01 · Central loose-tube formation
Form the jelly-filled PBT loose tube
Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.
Fiber feeding · jelly filling · PBT extrusion
This stage forms the single loose tube used at the center of the reference ASU construction.
Fiber count, tube geometry and material system
Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.
Machine quantities, dimensions, performance, auxiliary systems and final arrangement are confirmed from the cable construction and project requirements.
See the ASU-specific downstream production line in operation.
This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.
Define the ASU project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
Opening a group only reveals its details; it does not confirm scope.
01 Buyer prepares Buyer responsibility Project, product ഒരുതൊടരിയ്ക്കൽഉപകരണമാണ് ഇത്സ്ഥാപിക്കുന്നത്ഇതിൽഒരുഇന്ഫർമേഷൻ ഉണ്ട്അതിന്റെപ്രവർത്തനമുറയെകുറിപ്പിടുന്നതാങ്കിൽമാറ്റിമോഡിഫൈച്ചേണ്ടഅത്ആണ്എന്നാൽഇത്ഒരുഫോർമുലേഷൻആണ്അതിനാൽഇത് ഒരുഎന്ജിനിയറിംഗപ്രക്രിയയാണ്അതിന്റെപ്രധാനഉദ്ദേശ്യംഎന്നാൽഇത്ഒരുപുനഃക്രമീകരണപ്രക്രിയയാണ്അതിനാൽ ഒരുമാറ്റംനടത്തുന്നുതാങ്കിൽഇത്ഒരുപുതിയതിരിച്ചുള്ളിട്ടു. 4 items
Information HONGKAI must review before fixing the production route and reference equipment configuration.
- Target cable drawing and product requirements for review സ്ഥിരീകരിക്കേണ്ടത്
- Starting materials, grades and supply formats സ്ഥിരീകരിക്കേണ്ടത്
- Factory space, utilities, access and installation conditions സ്ഥിരീകരിക്കേണ്ടത്
- Existing equipment and upstream/downstream interface information സ്ഥിരീകരിക്കേണ്ടത്
02 Defined in the written proposal HONGKAI ഉത്തരവാദിത്തം Recommended configuration and quoted supply boundary 4 items
HONGKAI defines the recommended configuration and quoted supply boundary after reviewing the available project inputs.
- Recommended production route and reference equipment configuration സ്ഥിരീകരിക്കേണ്ടത്
- ഉദ്ധരിച്ച ഉപകരണ ലിസ്റ്റും ഉപകരണ-സ്രോതസ്സ് അതിർത്തിയും സ്ഥിരീകരിക്കേണ്ടത്
- ഉദ്ധരിച്ച ഉപകരണങ്ങൾക്കായുള്ള ആവശ്യമായ ഇന്റർഫേസുകൾ സ്ഥിരീകരിക്കേണ്ടത്
- Documentation, commissioning, training and after-sales scope stated in the proposal സ്ഥിരീകരിക്കേണ്ടത്
03 ഒന്നിച്ച് സ്ഥിരീകരിച്ചു ഒരുമിച്ചുള്ള സ്ഥിരീകരണം Technical interfaces, acceptance and project coordination 4 items
തകന്ന ഇന്റർഫേസുകൾ, സ്വീകരണവും പ്രോജക്ട് സമന്വയവും രണ്ട് പ്രോജക്ട് ടീമുകളിൽ നിന്നും എഴുത്തുവടിയുടെ സ്ഥിരീകരണം ആവശ്യമാണ്.
- അന്തിമ പ്രക്രിയാ മാർഗവും ഉപകരണ കോൺഫിഗറേഷനും സ്ഥിരീകരിക്കേണ്ടത്
- ലേഔട്ട്, ഇന്റർഫേസ് വിഭജനവും സൈറ്റ്-റെഡിനസ് നിബന്ധനകളും സ്ഥിരീകരിക്കേണ്ടത്
- സ്വീകാര്യത മാനദണ്ഡങ്ങൾ, പരീക്ഷണ അവസ്ഥകൾ, സാമ്പിൾ മെത്തോഡ് സ്ഥിരീകരിക്കേണ്ടത്
- ഡെലിവറി, സ്ഥാപനം, പരീക്ഷണ സമയസൂചിക, മാറ്റങ്ങൾ തുടങ്ങിയവയും അന്തിമ സ്വീകരണവും സ്ഥിരീകരിക്കേണ്ടത്
Identify the inputs needed to review the ASU production route.
ആദ്യ എഞ്ചിനീയറിംഗ് റിവ്യൂവിൽ ചർച്ച ചെയ്യാൻ തയ്യാറായ പ്ലാനിംഗ് വിഷയങ്ങൾ തിരഞ്ഞെടുക്കുക. ഒരു തിരഞ്ഞെടുപ്പ് ഒരു റിവ്യൂ വിഷയം മാത്രം സൂചിപ്പിക്കുന്നു; ഇത് ഒരു തകന്ന മൂല്യം, ഉപകരണ എണ്ണം, മെറ്റീരിയൽ ഗ്രേഡ്, പ്രകടന ലക്ഷ്യം അല്ലെങ്കിൽ സപ്ലൈ സ്കോപ്പ് അനുമതിക്കുന്നില്ല.
Review the available ASU references and what still needs confirmation.
These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-50 PBT loose-tube line reference
Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.
These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
What Brazil customers value in an ASU project discussion.
Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU
Clarify the route before requesting a proposal.
These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.
ഈ റഫറൻസ് റൂട്ട് ആധാരമാക്കുന്ന ASU കേബിൾ നിർമ്മാണം എന്താണ്?
The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.
രണ്ട് ഘട്ടങ്ങളുള്ള വഴി മുൻകൂട്ടി നിറമിട്ട ഓപ്റ്റിക്കൽ ഫൈബർ അനുവദിക്കുന്നുവോ?
Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.
എന്തുകൊണ്ടാണ് പേജ് രണ്ട് കോർ ഉത്പാദന ഘട്ടങ്ങൾ കാണിക്കുന്നത്?
HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.
HK-50 ഉം HK-90 ASU ഉം അന്തിമ ഉപകരണ കോണ്ഫിഗറേഷൻ ആണോ?
No. They are reference production-stage models used to explain the process route. Final module quantities, dimensions, controls, utilities, optional systems and equipment interfaces are confirmed only after reviewing the cable drawing, materials, capacity target and factory conditions.
നിലവിലുള്ള ഉപകരണങ്ങൾ അല്ലെങ്കിൽ വാങ്ങുന്നവർ നൽകുന്ന സാമഗ്രികൾ ഏകീകരിക്കാൻ കഴിയുമോ?
Potentially, subject to technical review. HONGKAI must confirm material package sizes, tension ranges, line interfaces, control signals, dimensions, utilities, operating conditions and required tests before existing equipment or buyer-supplied materials are included in the proposed route.
ലൈൻ വേഗതയും ഉത്പാദന കഴിവും സ്ഥിരീകരിക്കാൻ എന്ത് വിവരങ്ങൾ ആവശ്യമാണ്?
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.
യന്ത്രത്തിന്റെ ചിത്രങ്ങളും പ്രക്രിയാ വീഡിയോവും അന്തിമമായി നൽകുന്ന ഉപകരണങ്ങളാണോ?
No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.
പരിശോധന, FAT, സ്ഥാപനവും പരിശീലനവും ഉൾപ്പെടുന്നുവോ?
Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.
Final cable construction, performance, equipment, acceptance criteria and supply scope are defined only in the mutually approved technical and commercial agreement.
Plan your fiber optic cable production investment.
Share your target cable families, planned capacity, factory conditions and current project stage. HONGKAI will review the process route, equipment scope, system interfaces and open technical items before preparing a project-specific proposal.
What HONGKAI will review
- Target product plan
- Cable families, constructions, fiber counts and material requirements
- പ്രക്രിയാ വഴി
- Starting materials, required processes and equipment interfaces
- Capacity target
- Product mix, expected output and target line speed
- ഫാക്ടറി സാഹചര്യങ്ങൾ
- Available space, utilities, existing equipment and testing needs
- Project stage
- Planning, budgeting, factory preparation or production expansion
- Review status
- Preliminary assessment · Technical confirmation required
What to prepare · 6 items
- Target cable types, reference samples or available drawings
- Fiber counts, cable structures and material requirements
- Starting materials and required production processes
- Target output, product mix or expected line speed
- Existing equipment, reel sizes and available factory layout
- Utilities, testing requirements and planned project timeline
No complete specification yet? Share your target products and current assumptions. Unconfirmed items can remain “To be confirmed”.
The information submitted here supports a preliminary technical review. Final equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Fiber Optic Cable Production Project Brief
Tell us your planned cable products, target capacity and current investment stage. Partial information is welcome, and you may upload a cable drawing when available.
