Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
Xem xét từng quy trình và thiết bị của nó
ASU Cable Production Line for Central Loose-Tube Aerial Cable
ASU production-line panorama · Complete route remains visible
Đường sản xuất này tạo ra sản phẩm gì? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.
- Tuyến sản xuất
- HK-50 → HK-90 ASU
- Phương pháp điều khiển
- Các hệ thống điều khiển được rà soát cho từng giai đoạn sản xuất
- Các quy trình chính
- PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
- Phạm vi cáp phù hợp
- ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
Xem xét từng quy trình và thiết bị của nó
Read the ASU cable from the inside out.
Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.
01
Bản lắp ráp tham chiếu
Two core stages form the reference ASU cable.
Chọn một lớp phía trên để làm nổi bật giai đoạn chuẩn bị, định hình hoặc tích hợp nó.
Xem xét cấu hình sản xuất cho lớp cáp đã chọn.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.
HK-50
PBT loose-tube production
Combine colored fibers, filling compound and PBT material into the required central loose tube.
- Đầu vào
- Approved colored optical fibers + filling compound + PBT
- Đầu ra
- Jelly-filled PBT loose tube
- Vị trí tuyến
- Stage 01 · Central loose-tube formation
Form the jelly-filled PBT loose tube
Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.
Fiber feeding · jelly filling · PBT extrusion
This stage forms the single loose tube used at the center of the reference ASU construction.
Fiber count, tube geometry and material system
Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.
Số lượng máy, kích thước, hiệu suất, hệ thống phụ trợ và bố trí cuối cùng được xác nhận dựa trên cấu trúc cáp và yêu cầu dự án.
See the ASU-specific downstream production line in operation.
This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.
Define the ASU project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Không có gì ở dưới đây được coi là bao gồm, loại trừ, do người mua cung cấp hoặc HONGKAI- cung cấp cho đến khi được xác nhận bằng văn bản.
Mở một nhóm chỉ hiển thị chi tiết của nó; không xác nhận phạm vi.
01 Người mua chuẩn bị Trách nhiệm của người mua Thông tin dự án, sản phẩm và địa điểm để xem xét kỹ thuật 4 mục
Thông tin HONGKAI phải được xem xét trước khi cố định tuyến sản xuất và cấu hình thiết bị tham chiếu.
- Bản vẽ cáp mục tiêu và yêu cầu sản phẩm để xem xét Đang xác nhận
- Vật liệu đầu vào, cấp độ và định dạng cung cấp Đang xác nhận
- Không gian nhà máy, tiện nghi, điều kiện tiếp cận và lắp đặt Đang xác nhận
- Thông tin thiết bị hiện có và giao diện đầu vào/đầu ra Đang xác nhận
02 Được xác định trong đề xuất bằng văn bản Trách nhiệm của HONGKAI Cấu hình đề xuất và phạm vi cung cấp báo giá 4 mục
HONGKAI xác định cấu hình đề xuất và phạm vi cung cấp báo giá sau khi xem xét các đầu vào dự án khả dụng.
- Đường dẫn sản xuất được đề xuất và cấu hình thiết bị tham chiếu Đang xác nhận
- Danh sách thiết bị được báo giá và ranh giới nguồn thiết bị Đang xác nhận
- Các giao diện yêu cầu cho thiết bị được báo giá Đang xác nhận
- Phạm vi tài liệu, vận hành, đào tạo và hậu mãi được nêu trong đề xuất Đang xác nhận
03 Đã xác nhận chung Xác nhận chung Giao diện kỹ thuật, nghiệm thu và phối hợp dự án 4 mục
Giao diện kỹ thuật, nghiệm thu và phối hợp dự án yêu cầu xác nhận bằng văn bản từ cả hai đội dự án.
- Đường dẫn quy trình và cấu hình thiết bị cuối cùng Đang xác nhận
- Bố trí, phân chia giao diện và điều kiện sẵn sàng tại hiện trường Đang xác nhận
- Tiêu chí chấp nhận, điều kiện kiểm tra và phương pháp lấy mẫu Đang xác nhận
- Lịch giao hàng, lắp đặt, chạy thử, thay đổi và ký xác nhận cuối cùng Đang xác nhận
Identify the inputs needed to review the ASU production route.
Chọn các chủ đề lập kế hoạch mà bạn sẵn sàng thảo luận trong buổi đánh giá kỹ thuật đầu tiên. Việc chọn một mục chỉ đánh dấu một chủ đề đánh giá; không đồng ý bất kỳ giá trị kỹ thuật, số lượng thiết bị, cấp độ vật liệu, mục tiêu hiệu suất hay phạm vi cung cấp nào.
Review the available ASU references and what still needs confirmation.
These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
Chưa chọn chủ đề lập kế hoạch nào. Quay lại Mục 05 để thêm các ưu tiên xem xét.
HK-50 PBT loose-tube line reference
Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.
These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
What Brazil customers value in an ASU project discussion.
Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU
Clarify the route before requesting a proposal.
These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.
Cấu trúc dây cáp ASU này dựa trên tuyến tham chiếu nào?
The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.
Con đường hai giai đoạn có giả định sợi quang đã được nhuộm màu trước không?
Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.
Tại sao trang hiển thị hai giai đoạn sản xuất lõi?
HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.
HK-50 và HK-90 ASU có phải là cấu hình thiết bị cuối cùng không?
No. They are reference production-stage models used to explain the process route. Final module quantities, dimensions, controls, utilities, optional systems and equipment interfaces are confirmed only after reviewing the cable drawing, materials, capacity target and factory conditions.
Có thể tích hợp thiết bị hiện có hoặc vật liệu do người mua cung cấp không?
Potentially, subject to technical review. HONGKAI must confirm material package sizes, tension ranges, line interfaces, control signals, dimensions, utilities, operating conditions and required tests before existing equipment or buyer-supplied materials are included in the proposed route.
Cần thông tin gì để xác nhận tốc độ dây chuyền và năng lực sản xuất?
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.
Hình ảnh máy móc và video quy trình có phải là thiết bị cuối cùng được cung cấp không?
No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.
Việc kiểm tra, FAT, lắp đặt và đào tạo có được bao gồm không?
Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.
Final cable construction, performance, equipment, acceptance criteria and supply scope are defined only in the mutually approved technical and commercial agreement.
Plan your fiber optic cable production investment.
Share your target cable families, planned capacity, factory conditions and current project stage. HONGKAI will review the process route, equipment scope, system interfaces and open technical items before preparing a project-specific proposal.
Ai sẽ xem xét HONGKAI
- Kế hoạch sản phẩm mục tiêu
- Họ cáp, cấu trúc, số lượng sợi quang và yêu cầu vật liệu
- Lộ trình quy trình
- Vật liệu đầu vào, quy trình và giao diện thiết bị cần thiết
- Mục tiêu công suất
- Cơ cấu sản phẩm, sản lượng dự kiến và tốc độ dây chuyền mục tiêu
- Điều kiện nhà máy
- Không gian khả dụng, tiện ích, thiết bị hiện có và nhu cầu kiểm tra
- Giai đoạn dự án
- Lập kế hoạch, lập ngân sách, chuẩn bị nhà máy hoặc mở rộng sản xuất
- Trạng thái xem xét
- Đánh giá sơ bộ · Cần xác nhận kỹ thuật
Những gì cần chuẩn bị · các mục 6
- Các loại cáp mục tiêu, mẫu tham chiếu hoặc bản vẽ khả dụng
- Số sợi quang, cấu trúc cáp và yêu cầu vật liệu
- Vật liệu đầu vào và quy trình sản xuất yêu cầu
- Sản lượng mục tiêu, hỗn hợp sản phẩm hoặc tốc độ dây chuyền dự kiến
- Thiết bị hiện có, kích thước cuộn và bố trí nhà xưởng khả dụng
- Các tiện ích, yêu cầu kiểm tra và lịch trình dự án dự kiến
Chưa có thông số kỹ thuật đầy đủ? Chia sẻ sản phẩm mục tiêu và các giả định hiện tại của bạn. Các mục chưa xác nhận có thể để ở trạng thái “Chưa xác nhận”.
Thông tin bạn cung cấp ở đây hỗ trợ đánh giá kỹ thuật sơ bộ. Cấu hình thiết bị cuối cùng, hiệu suất, giá cả, lịch giao hàng và phạm vi cung cấp chỉ được xác nhận trong đề xuất hoặc thỏa thuận đã được phê duyệt.
Tóm tắt dự án sản xuất cáp quang
Cho chúng tôi biết các sản phẩm cáp bạn dự định sản xuất, công suất mục tiêu và giai đoạn đầu tư hiện tại. Thông tin không đầy đủ vẫn được hoan nghênh, và bạn có thể tải lên bản vẽ cáp khi có sẵn.
