Coordinate melt delivery, tooling, cooling and traction around the cable design.
خط روکش کابل نوری HK-90
اکستروژن Φ90 میلیمتر · از پرداخت هسته تا دریافت کابل نهایی
Apply the specified outer sheath around your prepared optical cable core. Configure material feeding, aramid yarn stranding or metal-tape protection as required, extrusion, cooling and take-up as one coordinated production stage.
- INPUT
- Prepared cable core or loose tube, with the specified protection materials
- OUTPUT
- Sheathed optical cable on the agreed finished-cable drum
- CORE PROCESS
- Pay off → prepare → extrude → cool / inspect → take up
- CONFIGURATION BASIS
- Cable construction, sheath compound, diameter, output and reel format
Scope boundary: this page covers the sheathing stage. Upstream coloring, loose-tube extrusion and SZ core stranding are separate processes. Reinforcement and armoring modules are selected for the approved cable construction.
From prepared core to finished outer sheath.
Build the process around the cable layers. Optional protection modules are selected before the extrusion and downstream handling requirements are finalized.
Feed the specified construction.
Start with the prepared core or loose tube. Match the core, wire and protection-material pay-offs to the incoming package.
Prepare the layers before extrusion.
Apply the selected water blocking and ripcord. ADSS routes add aramid yarn stranding before the outer sheath; armored routes use the specified metal-tape preparation and forming modules.
Form the outer jacket.
Feed the approved compound to the Φ90 mm extruder and crosshead. Coordinate melt delivery, cable centering, temperature and line speed.
Cool, inspect and collect.
Cool and dry the sheath, monitor diameter, apply the specified marking and tests, then coordinate caterpillar traction with finished-cable take-up.
Choose the protection route for your cable.
The same extrusion stage can sit within different process routes. Compare the incoming core, reinforcement and tape requirements before defining the equipment package.
Follow the line, one machine at a time.
Select a number or equipment card to see its equipment area, image and process role. Dashed regions identify process interfaces whose final position must be confirmed. The reference includes optional preparation and testing modules; the final equipment list follows your cable construction.
13 · Φ90 mm sheath extruderEquipment area in the reference arrangement
Equipment-family reference from the supplied project document. Final construction and quantity follow the approved equipment list.
Φ90 mm sheath extruder
Plasticizes the approved sheath compound and supplies the adjustable crosshead. The reference uses a Φ90 mm screw with a 25:1 L/D ratio.
Compound grade, screw and crosshead, tooling, temperature profile, output and required jacket dimensions.
Selected equipment 13: Φ90 mm sheath extruder
مرز مرجع: the panorama illustrates equipment order, not the final machine count, footprint or construction. Images from the project document show equipment families; the approved layout and equipment list define the supplied arrangement.
شرایط عملیاتی پشت مشخصات را تعریف کنید.
Use the reference below to begin the technical review. Confirm the complete cable construction, material grade and trial conditions before agreeing production performance.
| Review area | Reference / requirement | Condition to confirm |
|---|---|---|
| Extruder reference | Φ90 mm screw · 25:1 L/D · 75 kW main drive. | Reference equipment configuration; screw, crosshead and tooling must suit the compound and cable. |
| Aramid stranding reference | 24 heads · independent tension · adjustable pitch · S or Z lay. | Selected for the cable construction. Confirm yarn grade, quantity, tension and stranding pitch together with extrusion speed. The reference 120 rpm rotation is not a cable line speed. |
| Sheath materials | PE / PVC in the supplied extruder reference. | Confirm the compound grade and process settings. Other compounds require a separate suitability review. |
| سرعت تولید | Reference: up to 80 m/min for PE cable below Φ10 mm. | Conditional source value; confirm the complete construction, jacket thickness, cooling, reel changes and quality targets. |
| Extrusion output | Reference: up to 250 kg/h PE, with the crosshead open in the source specification. | An extruder-output reference is not guaranteed finished-cable throughput. Verify it with the agreed tooling and compound. |
| Cable & tooling range | Specify incoming core, finished diameter and jacket thickness. | Review every module. A metal-tape forming tool may have a narrower range than the extruder or capstan. |
| Reels, tension & utilities | Agree supply/output drums, winding tension, layout and utility loads. | Use one approved schedule for the chosen configuration; do not infer these values from the HK-90 name. |
| Controls & acceptance | PLC / IPC coordination, recipes, alarms and agreed inspection records. | Define instruments, interfaces, safety functions, trial duration and acceptance criteria. |
Confirm the technical schedule for your cable.
Review output together with the sheath cross-section, compound, tooling and cooling capacity. Reel capacity, line footprint, tension settings and utility loads are finalized for the selected configuration.
Connect the sheathing stage to your finished cable.
Compare the complete cable route, then define the sheathing equipment and construction-specific preparation modules.
کابل GYXTW
Review the loose-tube input, parallel strength members, metal-tape protection and outer-sheath requirements.
Open cable solutionکابل ADSS
Coordinate aramid yarn stranding with outer-sheath extrusion; confirm whether the incoming cable is a prepared core or an inner-sheathed cable.
Open cable solutionGYXTC8S Figure-8 Cable
Review the published construction, armoring, messenger positioning and figure-8 crosshead tooling together.
Open cable solutionConstruction matters: armored, all-dielectric and figure-8 cables require different preparation, reinforcement and tooling. One illustrated arrangement does not establish compatibility with every cable.
For tube extrusion, review the خط تولید لوله شل. برای یک هستهٔ رشتهای، خط تولید رشتهبندی SZ.
فرآیند روکشکاری را مشاهده کنید. آزمون پذیرش را برنامهریزی کنید.
The HONGKAI HK-90 video shows a sheathing reference for an ADSS cable route. Use it to discuss equipment and operating sequence, then agree the trial for your construction.
Trial the specified construction.
Use the approved core, sheath compound, protection materials and output drum.
Check coordinated behavior.
Observe extrusion, cooling, diameter monitoring, traction and take-up during starts, steady running and stops.
Agree the inspection record.
Check finished diameter, sheath thickness and appearance, marking, winding and the agreed optical and jacket tests.
Connect equipment supply with factory start-up.
The written proposal should connect equipment selection, integration and start-up responsibilities. Confirm the scope with HONGKAI for your project.
دامنه تجهیزات
- ماژولها و تعدادهای تأمینشده را مشخص کنید
- Identify retained and buyer-supplied equipment
- ثبت مسئولیتهای مربوط به تجهیزات و منابع
Line integration
- بررسی چیدمان و رابطهای جریان مواد
- Define controls, utilities and safety boundaries
- محدوده نصب و راهاندازی را توافق کنید
Start-up & support
- Define trial products and acceptance records
- تأیید آموزش اپراتور و مستندات
- Agree spare-parts and after-sales scope
Tell us about the cable you need to sheath.
Start with your drawing, product requirements or existing equipment. Technical details can be confirmed during the first review.
Nine inputs for your sheathing line.
- 01
Cable drawing and finished dimensions
- 02
Incoming core or loose-tube details
- 03
Sheath compound and jacket thickness
- 04
Reinforcement, tape and ripcord requirements
- 05
Input and output drum sizes / weights
- 06
Target output and operating plan
- 07
Marking, testing and acceptance criteria
- 08
Factory layout and retained equipment
- 09
Utilities, installation and project timing
Questions before specifying an HK-90 sheathing line.
Review the cable construction, equipment boundary and information needed for a proposal.
01خط روکش HK-90 چه محصولی تولید میکند؟
این فرآیند، روکش بیرونی مشخصشده را بر روی هسته کابل نوری آمادهشده یا بسته حفاظتی و لوله خاص ساختار اعمال میکند، سپس کابل را خنک، بازرسی و جمعآوری مینماید. رنگآمیزی فیبر در بالادست، اکسترود لوله شل و رشتهبندی SZ مراحل جداگانهای هستند مگر اینکه در محدوده پروژه گنجانده شده باشند.
02آیا یک خط میتواند کابلهای GYXTW، ADSS و 8 را تولید کند؟
این خانوادههای کابل ممکن است شامل مرحله روکش HK-90 باشند، اما از یک بسته تجهیزات یکسان استفاده نمیکنند. مدیریت هسته، تقویت، زرهپوشی، موقعیتدهی پیامرس، ابزارهای کراسهد و آزمونهای پاییندستی باید برای هر نقشه کابل بررسی شوند.
03آیا هر پیکربندی شامل تجهیزات نوار فلزی است؟
خیر. پرداخت نوار فلزی، اتصال، انباشت، موجدار کردن و شکلدهی طولی برای ساختار زرهبندی یا روکش مرکب مشخصشده انتخاب میشوند. یک مسیر تمامدیالکتریک نیازمندیهای تقویتکننده متفاوتی دارد.
04سرعت و خروجی ذکر شده به چه معناست؟
منبع تا 80 m/min برای کابل PE زیر 10 mm و یک مرجع خروجی اکستروژن تا 250 kg/h PE با هد عرضی باز ارائه میدهد. این مقادیر شرایط مرجع اعلامشده را توصیف میکنند. خروجی واقعی پذیرفتهشده کابل باید برای کابل، ترکیب، ابزارآلات، سیستم خنککاری و طرح عملیاتی توافق شود.
05از چه ترکیبات روکشی میتوان استفاده کرد؟
مرجع اکسترودر ارائهشده، PE و PVC را توصیف میکند. درجه دقیق و پیچ، قالبگیری، خشککردن و تنظیمات دمای مورد نیاز را تأیید کنید. فرض نکنید که LSZH یا ترکیب دیگری بدون بررسی مهندسی جداگانه پوشش داده شده است.
06آیا یک انباشتگر کابل ساختهشده گنجانده شده است؟
مرجع تجهیزات شامل یک انباشتگر نوار فلزی است که نوار را برای دنبالهی اتصال آن ذخیره میکند. یک انباشتگر کابل ساختهشده وظیفهی متفاوتی را انجام میدهد و نیازمند پیکربندی، کشش، طول ذخیرهسازی و بازنگری تعویض قرقرهی اختصاصی خود است.
07آیا میتوان از دستگاه تست جرقه روکش برای ADSS استفاده کرد؟
قابلیت اعمال آزمون به ساختار کابل و وجود یک مسیر بازگشت الکتریکی مناسب بستگی دارد. یک کابل تمامدیالکتریک نباید بهصورت خودکار همان ترتیب آزمون جرقهای را که برای یک کابل حاوی فلز در نظر گرفته شده است، به خود اختصاص دهد. روش آزمون و معیارهای پذیرش را برای محصول واقعی تأیید کنید.
08برای دریافت پیشفاکتور چه چیزی باید ارسال کنم؟
نقشه کابل، هسته ورودی، ترکیب روکش، مواد محافظ، اندازههای مورد نیاز درام و هدف تولید را ارسال کنید. در صورت امکان، چیدمان کارخانه و دستگاههای موجود خود را نیز اضافه نمایید. جزئیات فنی را میتوان در طی بررسی اولیه تکمیل کرد.