Lini Produksi Kabel Patch Cord Simplex / Duplex

Apa yang dihasilkan rute produksi ini? Two linked production lines form the reference cable body for simplex or duplex patch cords. HK-30 turns bare optical fiber into the tight-buffered element. HK-50 feeds one or two tight-buffered elements with aramid yarn, extrudes the project-specified outer jacket, then cools, measures and takes up the finished cable body. Connector termination, end-face polishing and optical testing are separate downstream processes. Final construction follows the approved cable drawing.

Rute produksi
HK-30 → HK-50 Patch Cord Cable Body
Pendekatan kontrol
Kontrol terkoordinasi ditinjau untuk setiap tahap produksi
Proses utama
Ekstrusi buffer ketat · pelapis benang aramid · ekstrusi jaket luar sesuai spesifikasi proyek
Rentang kabel yang sesuai
Badan kabel patch-cord simplex atau duplex · perakitan konektor dan pengujian ditangani secara terpisah
PRODUCTION ROUTE PREVIEW HK-50 final cable-body line
HK-50 cable production line 3D panorama shown completely and centered on a light background Tahap akhir badan kabel · Rangkaian peralatan lengkap ditampilkan tanpa pemotongan TWO-STAGE ROUTE BELOW Review equipment route
WHAT THE CLIENT SELECTED Lini Produksi Kabel Patch Cord Simplex / Duplex HK-30 · HK-50 Patch Cord Cable Body · tight-buffered and aramid-reinforced cable-body route
02 Patch Cord Cable anatomy

Trace the three-part Patch Cord cable body from tight buffer to outer jacket.

Open the exploded view, select one of the three cable-body parts, and see whether HK-30 or HK-50 forms or integrates it into the finished cable body. Bare optical fiber enters HK-30 directly without coloring.

Pelat tampilan terurai teknik Reference tight-buffered Patch Cord cable-body construction
Patch Cord Cable 3D cutaway showing optical fiber, white tight buffer, aramid yarn and purple outer jacket 01 Referensi terpasang
Ikhtisar · beralih tampilan tanpa meninggalkan bagian ini Semua komponen kabel tetap terlihat sementara margin putih berlebih dikurangi.
Rute struktur-ke-proses

Two production stages form the Patch Cord cable body.

Pilih lapisan di atas untuk menyoroti tahap yang menyiapkan, membentuk, atau mengintegrasikannya.

01HK-30 · Tight-buffer extrusionPay off the uncolored bare optical fiber, apply the tight buffer, cool, measure and take up the buffered element.
02HK-50 · Aramid serving + jacketFeed one or two buffered elements, apply aramid yarn, extrude the outer jacket and take up the cable body.
Referensi batas: this render indexes only the three cable-body parts: tight buffer, aramid yarn and outer jacket. Uncolored bare optical fiber feeds HK-30 directly; no fiber-coloring stage is part of this route. A duplex construction repeats the same three-part stack for each leg. Confirm materials, dimensions and connector requirements against the approved drawing.
03 Konfigurasi referensi

Review the production configuration for the selected cable-body part.

The cable-body choice from Section 02 is carried here. Review its mapped HK-30 or HK-50 stage, then inspect the complete two-stage Patch Cord cable-body route.

Carried from cable-body structure No cable-body part selected Start from the cable-body structure above, or review the full two-stage route below.
Choose a cable-body part
Complete production-line image Complete line · Centered reference scale
Selected production stage Tight-buffer extrusion
Awal rute referensi

HK-30

Tight-buffer extrusion

Pay off uncolored bare optical fiber, apply the approved tight-buffer compound, then cool, measure, haul off and take up the buffered element.

Input
Uncolored bare optical fiber + approved tight-buffer compound
Output
Qualified 0.6/0.9 mm tight-buffered fiber
Posisi rute
Stage 01 · Tight-buffer element formation
Tahap produksi referensi
Peran proses

Form the qualified tight-buffered element

Control fiber pay-off, preheating, extrusion, cooling, diameter measurement, haul-off and take-up without a fiber-coloring stage.

Ruang lingkup referensi

Fiber handling · preheating · tight-buffer extrusion

This stage turns the approved uncolored bare optical fiber into the buffered element required by the Patch Cord cable-body drawing.

Konfirmasi sebelum proposal

Fiber specification, buffer OD and compound

Confirm optical-fiber input, target 0.6/0.9 mm buffer diameter, compound, line speed, tension and reel package.

Patch Cord cable-body route only.

Terminasi konektor, pemolesan ujung sambungan, dan pengujian optik merupakan proses hilir yang terpisah. Cakupan peralatan akhir mengikuti gambar kabel yang telah disetujui dan masukan proyek.

03B Video proses produksi

Watch HK-50 complete the Patch Cord cable body.

This HONGKAI video shows the simplex or duplex Patch Cord soft-cable production process. Use it to review aramid-yarn serving, outer-jacket extrusion and finished cable-body take-up alongside the two-stage configuration above.

HONGKAI video · Patch Cord HK-50 process Tonton di YouTube
Reference boundary: this video supports the HK-50 cable-body stage. Confirm the final simplex or duplex construction, aramid package, jacket material, cable diameter, speed, reel format, equipment list, layout and acceptance criteria in the written proposal. If the embedded player is unavailable, use "Watch on YouTube" above.
04 Tanggung jawab proyek

Tentukan batas proyek badan kabel Patch Cord sebelum rute ditetapkan.

The two-stage cable-body route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

Status ruang lingkup Diperlukan tinjauan teknik

Tidak ada yang di bawah ini dianggap termasuk, dikeluarkan, disediakan pembeli, atau disediakan HONGKAI- sampai dikonfirmasi secara tertulis.

Matriks tanggung jawab Tinjau ketiga kelompok tanggung jawab

Membuka grup hanya menampilkan detailnya; tidak mengonfirmasi lingkup.

Pembeli menyiapkan Tanggung jawab pembeli Informasi proyek, produk, dan lokasi untuk tinjauan teknis 4 items

Informasi HONGKAI harus ditinjau sebelum menetapkan rute produksi dan konfigurasi peralatan referensi.

  • Approved simplex or duplex cable-body drawing, fiber specification, element count, target buffer OD, finished OD and performance requirements Untuk dikonfirmasi
  • Uncolored bare optical fiber, tight-buffer compound, aramid-yarn package, jacket material, color and marking inputs Untuk dikonfirmasi
  • Factory space, utilities, access, reel sizes and installation conditions Untuk dikonfirmasi
  • Existing upstream and downstream equipment, including any separate connector-termination and testing processes Untuk dikonfirmasi
Didefinisikan dalam proposal tertulis Tanggung jawab HONGKAI Konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip 4 items

HONGKAI menentukan konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip setelah meninjau input proyek yang tersedia.

  • Recommended two-stage HK-30 to HK-50 cable-body route and reference configuration Untuk dikonfirmasi
  • Quoted equipment list, line interfaces and equipment-source boundary Untuk dikonfirmasi
  • Required HK-30 to HK-50 interfaces, tooling, tension control, cooling, diameter measurement, haul-off and take-up Untuk dikonfirmasi
  • Lingkup dokumentasi, commissioning, pelatihan, dan pascapenjualan yang dinyatakan dalam proposal Untuk dikonfirmasi
Dikonfirmasi bersama Konfirmasi bersama Antarmuka teknis, penerimaan, dan koordinasi proyek 4 items

Antarmuka teknis, penerimaan, dan koordinasi proyek memerlukan konfirmasi tertulis dari kedua tim proyek.

  • Final Patch Cord cable-body route and equipment configuration Untuk dikonfirmasi
  • Tata letak, pembagian antarmuka, dan kondisi kesiapan lokasi Untuk dikonfirmasi
  • Trial materials, sampling and acceptance criteria for the tight-buffered element and finished cable body Untuk dikonfirmasi
  • Jadwal pengiriman, pemasangan, uji coba, perubahan, dan penandatanganan akhir Untuk dikonfirmasi

05 Masukan perencanaan

Prepare the inputs for a complete Patch Cord cable-body production review.

Pilih topik perencanaan yang siap Anda diskusikan selama tinjauan teknis pertama. Pemilihan menandai topik tinjauan saja; tidak mengesahkan nilai teknis, jumlah peralatan, grade bahan, target kinerja, atau lingkup pasokan.

Pilih topik perencanaan jalur produksi yang akan ditinjau
06 Reference & verification

Review the available Patch Cord cable-body production references and what still needs confirmation.

These images and videos illustrate the HK-30 and HK-50 stages mapped to the current Patch Cord cable-body route. They are reference records, not a final equipment list, factory layout, performance commitment or acceptance record.

Section 05 context carried forward HK-30 tight-buffer extrusion → HK-50 aramid-yarn serving and outer-jacket extrusion

No planning topics selected yet. Return to Section 05 to add review priorities.

Reference image of the complete HONGKAI HK-30 tight-buffered optical-fiber production line mapped to the Patch Cord cable-body route
Stage 01 reference
Not final arrangement
Reference available

HK-30 tight-buffer extrusion reference

Reference line for receiving uncolored bare optical fiber, applying the approved tight-buffer compound, then cooling, measuring, hauling off and taking up the buffered element. Fiber specification, target buffer OD, compound, tooling, tension and reel format remain project-specific.

These production-stage images and videos illustrate the current two-stage Patch Cord cable-body planning route only. Connector termination, end-face polishing and optical testing remain separate downstream processes unless quoted separately. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.

Stage 01 reference

HK-30 tight-buffer extrusion reference

1 dari 2
Umpan balik pelanggan Patch Cord

Project feedback on Patch Cord equipment and HONGKAI support.

These project perspectives evaluate the proposed HK-30 and HK-50 equipment route, HONGKAI's engineering communication and the support provided during project review. HK-30 → HK-50

Foto proyek pelanggan HONGKAI yang dipasangkan dengan Sumon Reza
Catatan pelanggan yang dipublikasikan
Rute peralatan
For our Patch Cord cable-body project, the HK-30 tight-buffer line and HK-50 aramid-yarn serving and jacketing line were presented as one connected route. The equipment sequence, material handoff and take-up arrangement gave our production team a clear basis for evaluating the proposal.
Panggil Reza Factory Manager · Southeast Asia
HONGKAI foto proyek pelanggan yang dipasangkan dengan Tariq Abdullah
Catatan pelanggan yang dipublikasikan
Dukungan teknik
HONGKAI's engineers reviewed the simplex or duplex cable drawing with us, including tight-buffer diameter, aramid package, jacket material, tooling and reel format. Their explanation made the proposed HK-30 and HK-50 configuration easier for our engineering team to assess.
Tariq Abdullah Manajer Operasi · Jakarta, Indonesia
Foto proyek pelanggan HONGKAI yang dipasangkan dengan Maria da Silva
Catatan pelanggan yang dipublikasikan
Layanan perusahaan
During project review, HONGKAI clearly separated cable-body production from downstream connector termination, end-face polishing and optical testing, then explained the utilities, layout, inspection points and acceptance conditions. The structured response gave our team a practical checklist for implementation planning.
Maria da Silva WP Officer · São Paulo, Brazil

Names, roles and photos follow existing HONGKAI customer records. The Patch Cord-specific project-evaluation wording addresses the proposed equipment route and HONGKAI's engineering support, and is not presented as a verified verbatim customer quotation.

07 Rute FAQ

Klarifikasi rute badan kabel Patch Cord sebelum meminta proposal.

These answers connect the simplex or duplex cable-body construction to the HK-30 and HK-50 reference stages and the inputs needed for engineering review.

Tahap-tahap apa saja yang termasuk dalam rute referensi badan kabel Patch Cord?

The reference route has two stages. HK-30 forms the qualified tight-buffered element from approved uncolored bare optical fiber. HK-50 receives one or two buffered elements, applies the specified aramid-yarn package, extrudes the outer jacket, then cools, measures, hauls off and takes up the finished cable body. The final configuration follows the approved drawing and written project inputs.

Apakah rute ini memerlukan tahap pewarnaan serat?

No. The current reference route feeds uncolored bare optical fiber directly into HK-30, so a separate coloring stage is not included. The buyer still needs to confirm the optical-fiber specification, input reel condition and handling requirements.

Bagaimana perbedaan rute untuk bodi kabel simplex dan duplex?

A simplex cable body uses one qualified tight-buffered element, while a duplex construction uses two elements or repeated legs. The exact profile, element spacing, aramid distribution, finished dimensions and reel format must be defined by the approved simplex or duplex cable-body drawing.

Apa yang dikontrol oleh HK-30 selama produksi tight-buffer?

HK-30 manages bare-fiber pay-off, preheating, tight-buffer extrusion, cooling, dimensional monitoring, haul-off and take-up. The fiber input, buffer compound, target buffer diameter, tooling, tension range and reel package remain project-specific.

Apa yang dilakukan HK-50 a terhadap elemen berlapis ketat?

HK-50 guides one or two qualified buffered elements, serves the approved aramid-yarn package and extrudes the project-specified outer jacket. It also covers cooling, dimensional monitoring, marking, traction, accumulation and finished cable-body take-up. Yarn type, package, count, tension, jacket material, color, tooling and finished dimensions require confirmation.

Apakah terminasi konektor, pemolesan ujung serat, dan pengujian optik sudah termasuk?

Not by default. The HK-30 to HK-50 route produces the Patch Cord cable body. Connector termination, end-face polishing and optical testing are separate downstream processes unless they are reviewed and quoted as a separate part of the project scope.

Apakah gambar dan video referensi mengonfirmasi kecepatan, kapasitas, atau susunan lini?

No. They illustrate the process stages and reference equipment only. They do not confirm machine quantities, factory layout, speed, capacity, performance, certification, supplied scope or acceptance criteria for a specific project. Those values must be defined in the written technical and commercial agreement.

Informasi apa yang harus disediakan pembeli untuk tinjauan teknis?

Please provide the approved simplex or duplex cable-body drawing; optical-fiber and reel data; element count; target buffer and finished dimensions; tight-buffer, aramid and jacket specifications; color and marking; source and delivery reels; product mix and target output; factory utilities and layout; existing equipment interfaces; inspection and acceptance requirements; and the project schedule. Unknown items can remain identified for joint engineering review.

Konstruksi kabel akhir, peralatan, kinerja, kriteria penerimaan, dan cakupan pasokan ditentukan dalam perjanjian teknis dan komersial yang ditandatangani.

08 Pertanyaan investasi

Plan your Patch Cord cable-body production project.

Share the available simplex or duplex cable-body drawing; uncolored bare optical-fiber specification and input reel format; target tight-buffer diameter and compound; aramid-yarn type, package and count; outer-jacket material, color, profile, finished dimensions and marking; product mix, output and reel plan; factory conditions; downstream-process needs; and project schedule. HONGKAI will review the HK-30 to HK-50 route, equipment interfaces, cable-body boundary and open technical items before preparing a project-specific proposal.

Konteks halaman saat ini Simplex or duplex Patch Cord cable body · HK-30 → HK-50 Konteks ini menyertai permintaan sebagai referensi. Ini tidak mengonfirmasi rute produksi akhir atau konfigurasi peralatan. Masukan perencanaan tetap terbuka · Tahap pendukung tidak dilanjutkan

Apa yang akan ditinjau HONGKAI

Rencana produk target
Simplex or duplex cable-body construction, element count, target dimensions and material requirements
Rute proses
HK-30 tight-buffer extrusion and HK-50 aramid-yarn serving, outer-jacket extrusion, cooling and take-up
Downstream boundary
Connector termination, end-face polishing and optical testing reviewed separately unless included in writing
Capacity & reel plan
Product mix, target output, expected operating conditions and input and output reel formats
Kondisi pabrik
Available space, utilities, existing equipment, material flow and inspection interfaces
Tahap proyek
Planning, budgeting, factory preparation or production expansion · Preliminary technical review
Apa yang perlu disiapkan · item 6
  • Available simplex or duplex cable-body drawing, reference sample or target construction
  • Uncolored bare optical-fiber specification, input reel, target tight-buffer diameter and compound
  • Aramid-yarn type, package and count, plus outer-jacket material, color, profile, dimensions and marking
  • Product mix, target output, expected operating conditions and source and delivery reel formats
  • Existing equipment, available layout, utilities, material flow and reel-handling conditions
  • Downstream connector termination, end-face polishing and optical-testing boundary, inspection and acceptance requirements, and project timeline

No complete specification yet? Share the target cable body and current assumptions. Unknown values can remain open engineering inputs.

The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.

Ringkasan proyek investasi

Ringkasan Proyek Produksi Kabel Serat Optik

Katakan kepada kami produk kabel yang direncanakan, kapasitas target, dan tahap investasi saat ini. Informasi sebagian pun diterima, dan Anda dapat mengunggah gambar kabel bila tersedia.

Seret & Lepaskan File, Pilih File untuk Diunggah
Izinkan pelanggan mengunggah gambar kabel, spesifikasi, atau dokumen referensi yang tersedia. Tampilkan jenis file yang diterima dan batas ukuran file yang dikonfigurasi di WPForms.

Minta penawaran

kami akan membalas Anda dalam waktu 24 jam!!!