مرحلة جسم الكابل النهائية · قطار المعدات الكامل معروض دون اقتصاص
TWO-STAGE ROUTE BELOW
Review equipment route
سيمبلةس / دوبلةس بـاتـكـهـ قـوـرـدـ قـاـبـلـة بـرـوـدـوـكـتـيـوـنـ لـيـنـة
HK-50 production-line panorama · Complete equipment train remains visible
ما الذي تنتجه مسار الإنتاج هذا؟ Two linked production lines form the reference cable body for simplex or duplex patch cords. HK-30 turns bare optical fiber into the tight-buffered element. HK-50 feeds one or two tight-buffered elements with aramid yarn, extrudes the project-specified outer jacket, then cools, measures and takes up the finished cable body. Connector termination, end-face polishing and optical testing are separate downstream processes. Final construction follows the approved cable drawing.
- مسار الإنتاج
- HK-30 → HK-50 Patch Cord Cable Body
- نهج التحكم
- تم مراجعة أنظمة التحكم المنسقة لكل مرحلة إنتاج
- العمليات الرئيسية
- بثق الغلاف الضيق · خدمة خيوط الأراميد · بثق غلاف خارجي محدد حسب المشروع
- مدى الكابلات المناسب
- جسم كابل التوصيل البسيط أو المزدوج · يتم التعامل مع تجميع الموصل والاختبار بشكل منفصل
مرحلة جسم الكابل النهائية · قطار المعدات الكامل معروض دون اقتصاص
TWO-STAGE ROUTE BELOW
Review equipment route
Trace the three-part Patch Cord cable body from tight buffer to outer jacket.
Open the exploded view, select one of the three cable-body parts, and see whether HK-30 or HK-50 forms or integrates it into the finished cable body. Bare optical fiber enters HK-30 directly without coloring.
01
مرجع مُجمَّع
Two production stages form the Patch Cord cable body.
حدد طبقة أعلاه لتسليط الضوء على المرحلة التي تعدّها أو تشكّلها أو تدمجها في الكابل.
Review the production configuration for the selected cable-body part.
The cable-body choice from Section 02 is carried here. Review its mapped HK-30 or HK-50 stage, then inspect the complete two-stage Patch Cord cable-body route.
HK-30
Tight-buffer extrusion
Pay off uncolored bare optical fiber, apply the approved tight-buffer compound, then cool, measure, haul off and take up the buffered element.
- المدخل
- Uncolored bare optical fiber + approved tight-buffer compound
- المخرج
- Qualified 0.6/0.9 mm tight-buffered fiber
- موقع المسار
- Stage 01 · Tight-buffer element formation
Form the qualified tight-buffered element
Control fiber pay-off, preheating, extrusion, cooling, diameter measurement, haul-off and take-up without a fiber-coloring stage.
Fiber handling · preheating · tight-buffer extrusion
This stage turns the approved uncolored bare optical fiber into the buffered element required by the Patch Cord cable-body drawing.
Fiber specification, buffer OD and compound
Confirm optical-fiber input, target 0.6/0.9 mm buffer diameter, compound, line speed, tension and reel package.
تُعد عمليات إنهاء الموصل، وتلميع الوجه النهائي، والاختبار البصري عمليات منفصلة في المراحل اللاحقة. ويتبع نطاق المعدات النهائية الرسم المعتمد للكابل ومدخلات المشروع.
Watch HK-50 complete the Patch Cord cable body.
This HONGKAI video shows the simplex or duplex Patch Cord soft-cable production process. Use it to review aramid-yarn serving, outer-jacket extrusion and finished cable-body take-up alongside the two-stage configuration above.
عرّف حدود مشروع جسم كابل الحبل التصحيحي قبل الانتهاء من تحديد المسار.
The two-stage cable-body route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
فتح مجموعة ما يكشف تفاصيلها فقط؛ ولا يؤكد النطاق.
01 يُعد المشتري مسؤولية المشتري معلومات المشروع والمنتج والموقع للمراجعة الهندسية 4 items
يجب على المعلومات HONGKAI مراجعتها قبل تحديد مسار الإنتاج وتكوين المعدات المرجعية.
- Approved simplex or duplex cable-body drawing, fiber specification, element count, target buffer OD, finished OD and performance requirements قيد التأكيد
- Uncolored bare optical fiber, tight-buffer compound, aramid-yarn package, jacket material, color and marking inputs قيد التأكيد
- Factory space, utilities, access, reel sizes and installation conditions قيد التأكيد
- Existing upstream and downstream equipment, including any separate connector-termination and testing processes قيد التأكيد
02 محدد في العرض المكتوب مسؤولية HONGKAI تكوين موصى به وحدود التوريد المقتبس 4 items
HONGKAI يحدد التكوين الموصى به وحدود التوريد المقتبس بعد مراجعة المدخلات المتاحة للمشروع.
- Recommended two-stage HK-30 to HK-50 cable-body route and reference configuration قيد التأكيد
- Quoted equipment list, line interfaces and equipment-source boundary قيد التأكيد
- Required HK-30 to HK-50 interfaces, tooling, tension control, cooling, diameter measurement, haul-off and take-up قيد التأكيد
- نطاق الوثائق، والتشغيل، والتدريب، وما بعد البيع المذكور في العرض قيد التأكيد
03 تم التأكيد معًا تأكيد مشترك الواجهات الفنية، القبول، وتنسيق المشروع 4 items
تتطلب الواجهات الفنية، القبول، وتنسيق المشروع تأكيدًا كتابيًا من فريقَي المشروع.
- Final Patch Cord cable-body route and equipment configuration قيد التأكيد
- الترتيب، تقسيم الواجهات، وشروط جاهزية الموقع قيد التأكيد
- Trial materials, sampling and acceptance criteria for the tight-buffered element and finished cable body قيد التأكيد
- التسليم، التركيب، جدول الاختبار، التغييرات، والتوقيع النهائي قيد التأكيد
Prepare the inputs for a complete Patch Cord cable-body production review.
اختر مواضيع التخطيط التي أنت مستعد لمناقشتها خلال المراجعة الهندسية الأولى. الاختيار يُسجّل موضوع المراجعة فقط؛ ولا يوافق على قيمة تقنية أو كمية معدات أو درجة مواد أو هدف أداء أو نطاق توريد.
Review the available Patch Cord cable-body production references and what still needs confirmation.
These images and videos illustrate the HK-30 and HK-50 stages mapped to the current Patch Cord cable-body route. They are reference records, not a final equipment list, factory layout, performance commitment or acceptance record.
لم يتم اختيار أي مواضيع تخطيطية بعد. عد إلى القسم 05 لإضافة أولويات المراجعة.
HK-30 tight-buffer extrusion reference
Reference line for receiving uncolored bare optical fiber, applying the approved tight-buffer compound, then cooling, measuring, hauling off and taking up the buffered element. Fiber specification, target buffer OD, compound, tooling, tension and reel format remain project-specific.
These production-stage images and videos illustrate the current two-stage Patch Cord cable-body planning route only. Connector termination, end-face polishing and optical testing remain separate downstream processes unless quoted separately. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
ملاحظات المشروع حول معدات الكابلات التصحيحية ودعم HONGKAI.
These project perspectives evaluate the proposed HK-30 and HK-50 equipment route, HONGKAI's engineering communication and the support provided during project review. HK-30 → HK-50
For our Patch Cord cable-body project, the HK-30 tight-buffer line and HK-50 aramid-yarn serving and jacketing line were presented as one connected route. The equipment sequence, material handoff and take-up arrangement gave our production team a clear basis for evaluating the proposal.
HONGKAI's engineers reviewed the simplex or duplex cable drawing with us, including tight-buffer diameter, aramid package, jacket material, tooling and reel format. Their explanation made the proposed HK-30 and HK-50 configuration easier for our engineering team to assess.
During project review, HONGKAI clearly separated cable-body production from downstream connector termination, end-face polishing and optical testing, then explained the utilities, layout, inspection points and acceptance conditions. The structured response gave our team a practical checklist for implementation planning.
Names, roles and photos follow existing HONGKAI customer records. The Patch Cord-specific project-evaluation wording addresses the proposed equipment route and HONGKAI's engineering support, and is not presented as a verified verbatim customer quotation.
وضّح مسار جسم كابل الحبل التصحيحي قبل طلب عرض سعر.
These answers connect the simplex or duplex cable-body construction to the HK-30 and HK-50 reference stages and the inputs needed for engineering review.
ما المراحل التي تتضمنها مسار مرجع جسم كابل الحبل التصحيحي؟
The reference route has two stages. HK-30 forms the qualified tight-buffered element from approved uncolored bare optical fiber. HK-50 receives one or two buffered elements, applies the specified aramid-yarn package, extrudes the outer jacket, then cools, measures, hauls off and takes up the finished cable body. The final configuration follows the approved drawing and written project inputs.
هل يتطلب هذا المسار مرحلة تلوين الألياف؟
No. The current reference route feeds uncolored bare optical fiber directly into HK-30, so a separate coloring stage is not included. The buyer still needs to confirm the optical-fiber specification, input reel condition and handling requirements.
كيف يختلف المسار بالنسبة لهياكل الكابلات ذات النواة الواحدة والكابلات المزدوجة؟
A simplex cable body uses one qualified tight-buffered element, while a duplex construction uses two elements or repeated legs. The exact profile, element spacing, aramid distribution, finished dimensions and reel format must be defined by the approved simplex or duplex cable-body drawing.
ما الذي يتحكم فيه HK-30 أثناء إنتاج الغلاف الضيق؟
HK-30 manages bare-fiber pay-off, preheating, tight-buffer extrusion, cooling, dimensional monitoring, haul-off and take-up. The fiber input, buffer compound, target buffer diameter, tooling, tension range and reel package remain project-specific.
ما الذي يفعله HK-50 a بالعنصر المغلف بإحكام؟
HK-50 guides one or two qualified buffered elements, serves the approved aramid-yarn package and extrudes the project-specified outer jacket. It also covers cooling, dimensional monitoring, marking, traction, accumulation and finished cable-body take-up. Yarn type, package, count, tension, jacket material, color, tooling and finished dimensions require confirmation.
هل يشمل ذلك إنهاء الموصل، وتلميع الوجه النهائي، والاختبار البصري؟
Not by default. The HK-30 to HK-50 route produces the Patch Cord cable body. Connector termination, end-face polishing and optical testing are separate downstream processes unless they are reviewed and quoted as a separate part of the project scope.
هل تؤكد صور ومقاطع الفيديو المرجعية السرعة أو السعة أو ترتيب الخط؟
No. They illustrate the process stages and reference equipment only. They do not confirm machine quantities, factory layout, speed, capacity, performance, certification, supplied scope or acceptance criteria for a specific project. Those values must be defined in the written technical and commercial agreement.
ما المعلومات التي يجب أن يقدّمها المشتري لمراجعة الهندسة؟
Please provide the approved simplex or duplex cable-body drawing; optical-fiber and reel data; element count; target buffer and finished dimensions; tight-buffer, aramid and jacket specifications; color and marking; source and delivery reels; product mix and target output; factory utilities and layout; existing equipment interfaces; inspection and acceptance requirements; and the project schedule. Unknown items can remain identified for joint engineering review.
يتم تحديد بنية الكابل النهائية، والمعدات، والأداء، ومعايير القبول، ونطاق التوريد في الاتفاق الفني والتجاري الموقع.
خطّط لمشروع إنتاج جسم كابلات التوصيل الخاصة بك.
Share the available simplex or duplex cable-body drawing; uncolored bare optical-fiber specification and input reel format; target tight-buffer diameter and compound; aramid-yarn type, package and count; outer-jacket material, color, profile, finished dimensions and marking; product mix, output and reel plan; factory conditions; downstream-process needs; and project schedule. HONGKAI will review the HK-30 to HK-50 route, equipment interfaces, cable-body boundary and open technical items before preparing a project-specific proposal.
ما الذي سيُراجعه HONGKAI
- خطة المنتج المستهدفة
- بناء جسم الكابل بسيط أو مزدوج، عدد العناصر، الأبعاد المستهدفة ومتطلبات المواد
- مسار العملية
- HK-30 tight-buffer extrusion and HK-50 aramid-yarn serving, outer-jacket extrusion, cooling and take-up
- Downstream boundary
- تمت مراجعة إنهاء الموصل، وتلميع الوجه النهائي، والاختبار البصري بشكل منفصل ما لم يُذكر خلاف ذلك كتابةً
- السعة وخطة البكرة
- مزيج المنتج، ناتج الهدف، ظروف التشغيل المتوقعة وتنسيقات بكرات الإدخال والإخراج
- ظروف المصنع
- المساحة المتاحة، والمرافق، والمعدات الحالية، وتدفق المواد، وواجهات الفحص
- مرحلة المشروع
- التخطيط، الميزنة، إعداد المصنع أو توسيع الإنتاج · المراجعة الفنية الأولية
ما يجب إعداده · عناصر 6
- رسم جسم كابل متوفر بسيط أو مزدوج، عينة مرجعية أو بنية مستهدفة
- مواصفات الألياف البصرية العارية غير الملونة، بكرة الإدخال، قطر الغلاف الضيق المستهدف والمركب
- نوع خيط الأراميد، والعبوة والعدد، بالإضافة إلى مادة الغلاف الخارجي، واللون، والملف الشخصي، والأبعاد والعلامة
- مزيج المنتج، الإنتاج المستهدف، ظروف التشغيل المتوقعة، وتنسيقات بكرات المصدر والتسليم
- المعدات الحالية، والتخطيط المتاح، والمرافق، وتدفق المواد، وظروف التعامل مع البكرات
- نهاية التوصيل المنحدرة، وتلميع الوجه النهائي، وحدود الاختبار البصري، ومتطلبات الفحص والقبول، والجدول الزمني للمشروع
لا توجد مواصفات كاملة بعد؟ شارك جسم الكابل المستهدف والافتراضات الحالية. يمكن أن تظل القيم غير المعروفة كمدخلات هندسية مفتوحة.
The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
ملخص مشروع إنتاج كابلات الألياف البصرية
أخبرنا عن منتجات الكابلات المخطط لها، والقدرة المستهدفة ومرحلة الاستثمار الحالية. المعلومات الجزئية مقبولة، ويمكنك رفع رسم كابل عند توفره.
