Final cable-body stage · Complete equipment train shown without cropping
TWO-STAGE ROUTE BELOW
Review equipment route
Linha de Produção de Cabos Patch Cord Simplex / Duplex
HK-50 production-line panorama · Complete equipment train remains visible
O que esta rota de produção produz? Two linked production lines form the reference cable body for simplex or duplex patch cords. HK-30 turns bare optical fiber into the tight-buffered element. HK-50 feeds one or two tight-buffered elements with aramid yarn, extrudes the project-specified outer jacket, then cools, measures and takes up the finished cable body. Connector termination, end-face polishing and optical testing are separate downstream processes. Final construction follows the approved cable drawing.
- Rota de produção
- HK-30 → HK-50 Patch Cord Cable Body
- Abordagem de controle
- Controles coordenados revisados para cada etapa de produção
- Processos principais
- Tight-buffer extrusion · aramid-yarn serving · project-specified outer-jacket extrusion
- Faixa de cabos adequada
- Simplex or duplex patch-cord cable body · connector assembly and testing handled separately
Final cable-body stage · Complete equipment train shown without cropping
TWO-STAGE ROUTE BELOW
Review equipment route
Trace the three-part Patch Cord cable body from tight buffer to outer jacket.
Open the exploded view, select one of the three cable-body parts, and see whether HK-30 or HK-50 forms or integrates it into the finished cable body. Bare optical fiber enters HK-30 directly without coloring.
01
Referência montada
Two production stages form the Patch Cord cable body.
Selecione uma camada acima para destacar o estágio que prepara, forma ou integra ela.
Review the production configuration for the selected cable-body part.
The cable-body choice from Section 02 is carried here. Review its mapped HK-30 or HK-50 stage, then inspect the complete two-stage Patch Cord cable-body route.
HK-30
Tight-buffer extrusion
Pay off uncolored bare optical fiber, apply the approved tight-buffer compound, then cool, measure, haul off and take up the buffered element.
- Entrada
- Uncolored bare optical fiber + approved tight-buffer compound
- Saída
- Qualified 0.6/0.9 mm tight-buffered fiber
- Posição da rota
- Stage 01 · Tight-buffer element formation
Form the qualified tight-buffered element
Control fiber pay-off, preheating, extrusion, cooling, diameter measurement, haul-off and take-up without a fiber-coloring stage.
Fiber handling · preheating · tight-buffer extrusion
This stage turns the approved uncolored bare optical fiber into the buffered element required by the Patch Cord cable-body drawing.
Fiber specification, buffer OD and compound
Confirm optical-fiber input, target 0.6/0.9 mm buffer diameter, compound, line speed, tension and reel package.
Connector termination, end-face polishing and optical testing are separate downstream processes. Final equipment scope follows the approved cable drawing and project inputs.
Watch HK-50 complete the Patch Cord cable body.
This HONGKAI video shows the simplex or duplex Patch Cord soft-cable production process. Use it to review aramid-yarn serving, outer-jacket extrusion and finished cable-body take-up alongside the two-stage configuration above.
Define the Patch Cord cable-body project boundary before the route is finalized.
The two-stage cable-body route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nada abaixo é considerado incluído, excluído, fornecido pelo comprador ou HONGKAI-fornecido até que seja confirmado por escrito.
Abrir um grupo apenas revela seus detalhes; não confirma o escopo.
01 Preparado pelo comprador Responsabilidade do comprador Informações do projeto, produto e local para revisão de engenharia 4 itens
Informação HONGKAI deve ser revisada antes de fixar a rota de produção e a configuração de equipamentos de referência.
- Approved simplex or duplex cable-body drawing, fiber specification, element count, target buffer OD, finished OD and performance requirements A ser confirmado
- Uncolored bare optical fiber, tight-buffer compound, aramid-yarn package, jacket material, color and marking inputs A ser confirmado
- Factory space, utilities, access, reel sizes and installation conditions A ser confirmado
- Existing upstream and downstream equipment, including any separate connector-termination and testing processes A ser confirmado
02 Definido na proposta escrita Responsabilidade HONGKAI Configuração recomendada e limite de fornecimento cotado 4 itens
HONGKAI define a configuração recomendada e o limite de fornecimento cotado após revisar as entradas disponíveis do projeto.
- Recommended two-stage HK-30 to HK-50 cable-body route and reference configuration A ser confirmado
- Quoted equipment list, line interfaces and equipment-source boundary A ser confirmado
- Required HK-30 to HK-50 interfaces, tooling, tension control, cooling, diameter measurement, haul-off and take-up A ser confirmado
- Escopo de documentação, comissionamento, treinamento e pós-venda mencionado na proposta A ser confirmado
03 Confirmado conjuntamente Confirmação conjunta Interfaces técnicas, aceitação e coordenação do projeto 4 itens
As interfaces técnicas, aceitação e coordenação do projeto exigem confirmação por escrito de ambas as equipes do projeto.
- Final Patch Cord cable-body route and equipment configuration A ser confirmado
- Layout, divisão de interfaces e condições de prontidão do local A ser confirmado
- Trial materials, sampling and acceptance criteria for the tight-buffered element and finished cable body A ser confirmado
- Programa de entrega, instalação, ensaio, alterações e assinatura final A ser confirmado
Prepare the inputs for a complete Patch Cord cable-body production review.
Selecione os tópicos de planejamento nos quais você está pronto para discutir durante a primeira revisão de engenharia. Uma seleção marca apenas um tópico de revisão; não aprova valor técnico, quantidade de equipamentos, grau de material, meta de desempenho ou escopo de fornecimento.
Review the available Patch Cord cable-body production references and what still needs confirmation.
These images and videos illustrate the HK-30 and HK-50 stages mapped to the current Patch Cord cable-body route. They are reference records, not a final equipment list, factory layout, performance commitment or acceptance record.
Nenhum tópico de planejamento selecionado ainda. Retorne à seção 05 para adicionar prioridades de revisão.
HK-30 tight-buffer extrusion reference
Reference line for receiving uncolored bare optical fiber, applying the approved tight-buffer compound, then cooling, measuring, hauling off and taking up the buffered element. Fiber specification, target buffer OD, compound, tooling, tension and reel format remain project-specific.
These production-stage images and videos illustrate the current two-stage Patch Cord cable-body planning route only. Connector termination, end-face polishing and optical testing remain separate downstream processes unless quoted separately. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
Project feedback on Patch Cord equipment and HONGKAI support.
These project perspectives evaluate the proposed HK-30 and HK-50 equipment route, HONGKAI's engineering communication and the support provided during project review. HK-30 → HK-50
For our Patch Cord cable-body project, the HK-30 tight-buffer line and HK-50 aramid-yarn serving and jacketing line were presented as one connected route. The equipment sequence, material handoff and take-up arrangement gave our production team a clear basis for evaluating the proposal.
HONGKAI's engineers reviewed the simplex or duplex cable drawing with us, including tight-buffer diameter, aramid package, jacket material, tooling and reel format. Their explanation made the proposed HK-30 and HK-50 configuration easier for our engineering team to assess.
During project review, HONGKAI clearly separated cable-body production from downstream connector termination, end-face polishing and optical testing, then explained the utilities, layout, inspection points and acceptance conditions. The structured response gave our team a practical checklist for implementation planning.
Names, roles and photos follow existing HONGKAI customer records. The Patch Cord-specific project-evaluation wording addresses the proposed equipment route and HONGKAI's engineering support, and is not presented as a verified verbatim customer quotation.
Clarify the Patch Cord cable-body route before requesting a proposal.
These answers connect the simplex or duplex cable-body construction to the HK-30 and HK-50 reference stages and the inputs needed for engineering review.
Quais etapas estão incluídas na rota de referência do corpo do cabo Patch Cord?
The reference route has two stages. HK-30 forms the qualified tight-buffered element from approved uncolored bare optical fiber. HK-50 receives one or two buffered elements, applies the specified aramid-yarn package, extrudes the outer jacket, then cools, measures, hauls off and takes up the finished cable body. The final configuration follows the approved drawing and written project inputs.
Esta rota requer uma etapa de coloração da fibra?
No. The current reference route feeds uncolored bare optical fiber directly into HK-30, so a separate coloring stage is not included. The buyer still needs to confirm the optical-fiber specification, input reel condition and handling requirements.
Como a rota difere para corpos de cabo simplex e duplex?
A simplex cable body uses one qualified tight-buffered element, while a duplex construction uses two elements or repeated legs. The exact profile, element spacing, aramid distribution, finished dimensions and reel format must be defined by the approved simplex or duplex cable-body drawing.
O que o HK-30 controla durante a produção de revestimento apertado?
HK-30 manages bare-fiber pay-off, preheating, tight-buffer extrusion, cooling, dimensional monitoring, haul-off and take-up. The fiber input, buffer compound, target buffer diameter, tooling, tension range and reel package remain project-specific.
O que HK-50 a adiciona ao elemento com revestimento apertado?
HK-50 guides one or two qualified buffered elements, serves the approved aramid-yarn package and extrudes the project-specified outer jacket. It also covers cooling, dimensional monitoring, marking, traction, accumulation and finished cable-body take-up. Yarn type, package, count, tension, jacket material, color, tooling and finished dimensions require confirmation.
A terminação do conector, o polimento da face final e os testes ópticos estão incluídos?
Not by default. The HK-30 to HK-50 route produces the Patch Cord cable body. Connector termination, end-face polishing and optical testing are separate downstream processes unless they are reviewed and quoted as a separate part of the project scope.
As imagens e vídeos de referência confirmam a velocidade, a capacidade ou o arranjo da linha?
No. They illustrate the process stages and reference equipment only. They do not confirm machine quantities, factory layout, speed, capacity, performance, certification, supplied scope or acceptance criteria for a specific project. Those values must be defined in the written technical and commercial agreement.
What information should the buyer provide for engineering review?
Please provide the approved simplex or duplex cable-body drawing; optical-fiber and reel data; element count; target buffer and finished dimensions; tight-buffer, aramid and jacket specifications; color and marking; source and delivery reels; product mix and target output; factory utilities and layout; existing equipment interfaces; inspection and acceptance requirements; and the project schedule. Unknown items can remain identified for joint engineering review.
A construção final do cabo, equipamentos, desempenho, critérios de aceitação e escopo de fornecimento são definidos no acordo técnico e comercial assinado.
Plan your Patch Cord cable-body production project.
Share the available simplex or duplex cable-body drawing; uncolored bare optical-fiber specification and input reel format; target tight-buffer diameter and compound; aramid-yarn type, package and count; outer-jacket material, color, profile, finished dimensions and marking; product mix, output and reel plan; factory conditions; downstream-process needs; and project schedule. HONGKAI will review the HK-30 to HK-50 route, equipment interfaces, cable-body boundary and open technical items before preparing a project-specific proposal.
O que HONGKAI analisará
- Plano de produto alvo
- Simplex or duplex cable-body construction, element count, target dimensions and material requirements
- Rota do processo
- HK-30 tight-buffer extrusion and HK-50 aramid-yarn serving, outer-jacket extrusion, cooling and take-up
- Downstream boundary
- Connector termination, end-face polishing and optical testing reviewed separately unless included in writing
- Capacity & reel plan
- Product mix, target output, expected operating conditions and input and output reel formats
- Condições da fábrica
- Available space, utilities, existing equipment, material flow and inspection interfaces
- Estágio do projeto
- Planning, budgeting, factory preparation or production expansion · Preliminary technical review
O que preparar · itens 6
- Available simplex or duplex cable-body drawing, reference sample or target construction
- Uncolored bare optical-fiber specification, input reel, target tight-buffer diameter and compound
- Aramid-yarn type, package and count, plus outer-jacket material, color, profile, dimensions and marking
- Product mix, target output, expected operating conditions and source and delivery reel formats
- Existing equipment, available layout, utilities, material flow and reel-handling conditions
- Downstream connector termination, end-face polishing and optical-testing boundary, inspection and acceptance requirements, and project timeline
No complete specification yet? Share the target cable body and current assumptions. Unknown values can remain open engineering inputs.
The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Resumo do Projeto de Produção de Cabo de Fibra Óptica
Informe-nos seus produtos de cabo planejados, capacidade-alvo e estágio atual do investimento. Informações parciais são bem-vindas, e você pode fazer o upload de um desenho de cabo quando disponível.
