ASU Cable Production Line for Central Loose-Tube Aerial Cable

इस उत्पादन मार्ग से क्या उत्पादित होता है? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.

उत्पादन मार्ग
HK-50 → HK-90 ASU
नियंत्रण दृष्टिकोण
प्रत्येक उत्पादन चरण के लिए समन्वित नियंत्रण समीक्षित किए गए
मुख्य प्रक्रियाएँ
PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
उपयुक्त केबल रेंज
ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
02 ASU cable anatomy

Read the ASU cable from the inside out.

Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.

इंजीनियरिंग विस्फोटित-दृश्य प्लेट Reference central loose-tube ASU construction
ASU fiber optic cable 3D structure showing the central loose tube and two parallel FRP strength members 01 संगठित संदर्भ
Overview · इस अनुभाग को छोड़े बिना दृश्य बदलें All cable components remain visible while excess white margin is reduced.
स्ट्रक्चर-टू-प्रोसेस रूट

Two core stages form the reference ASU cable.

ऊपर की परत चुनें ताकि उस चरण को हाइलाइट किया जा सके जो इसे तैयार, फॉर्म या एकीकृत करता है।.

01HK-50 · ढीली ट्यूब एक्सट्रूजनForm the jelly-filled PBT loose tube around colored fibers.
02HK-90 ASU · SZ forming + sheathPosition two FRP rods and the ripcord, then extrude the PE jacket.
संदर्भ सीमा: this generated exploded render explains the layer relationship, not a final manufacturing drawing. The generated image is a structure explainer; confirm fiber count, jelly system, FRP diameter and spacing, ripcord position, jacket material and all dimensions against the approved cable drawing.
03 संदर्भ विन्यास

चयनित केबल लेयर के लिए उत्पादन कॉन्फ़िगरेशन की समीक्षा करें।.

The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.

केबल स्ट्रक्चर से लाया गया कोई केबल लेयर चुना नहीं गया उपरोक्त केबल स्ट्रक्चर से शुरू करें, या नीचे दिए गए पूर्ण संदर्भ मार्ग की समीक्षा करें।.
एक केबल लेयर चुनें
संदर्भ उत्पादन लाइन छवि संदर्भ चित्र · परियोजना-विशिष्ट व्यवस्था
HONGKAI HK-50 PBT loose-tube production line used as the first core ASU production stage
चयनित चरण चित्र PBT loose-tube production
संदर्भ मार्ग शुरू

HK-50

PBT loose-tube production

Combine colored fibers, filling compound and PBT material into the required central loose tube.

इनपुट
Approved colored optical fibers + filling compound + PBT
आउटपुट
Jelly-filled PBT loose tube
मार्ग स्थिति
Stage 01 · Central loose-tube formation
संदर्भ उत्पादन स्टेज
प्रक्रिया भूमिका

Form the jelly-filled PBT loose tube

Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.

संदर्भ दायरा

Fiber feeding · jelly filling · PBT extrusion

This stage forms the single loose tube used at the center of the reference ASU construction.

प्रस्ताव से पहले पुष्टि करें

Fiber count, tube geometry and material system

Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.

Reference route only. Final equipment scope follows the approved cable drawing.

मशीन की मात्रा, आयाम, प्रदर्शन, सहायक प्रणालियाँ और अंतिम व्यवस्था केबल निर्माण और परियोजना आवश्यकताओं से पुष्टि की जाती है।.

03B Stage 02 process video

See the ASU-specific downstream production line in operation.

This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.

HONGKAI video · ASU Stage 02 process reference Watch on YouTube
Reference boundary: the video shows an ASU HK-90-specific forming and sheathing process, but it does not confirm the final machine quantities, arrangement, capacity, interfaces, supplied scope, acceptance result or project performance. If the embedded player is unavailable, use "Watch on YouTube" above.
04 प्रोजेक्ट जिम्मेदारी

Define the ASU project boundary before the route is finalized.

The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

क्षेत्र स्थिति इंजीनियरिंग समीक्षा आवश्यक

नीचे कुछ भी शामिल, बाहर, खरीददार-आपूर्ति या HONGKAI-आपूर्ति के रूप में नहीं माना जाता जब तक कि इसे लिखित रूप में पुष्टि न किया जाए।.

जिम्मेदारी मैट्रिक्स सभी तीन जिम्मेदारी समूहों की समीक्षा करें

एक समूह खोलने से केवल उसके विवरण प्रकट होते हैं; इससे क्षेत्र की पुष्टि नहीं होती है।.

खरीददार तैयार करता है खरीददार की जिम्मेदारी इंजीनियरिंग समीक्षा के लिए प्रोजेक्ट, उत्पाद और साइट जानकारी 4 आइटम

जानकारी HONGKAI को उत्पादन रूट और संदर्भ उपकरण कॉन्फ़िगरेशन निर्धारित करने से पहले समीक्षा करनी चाहिए।.

  • समीक्षा के लिए लक्ष्य केबल ड्राइंग और उत्पाद आवश्यकताएं अभी पुष्टि के लिए
  • शुरुआती सामग्री, ग्रेड और आपूर्ति फॉर्मेट अभी पुष्टि के लिए
  • कारखाने की जगह, सुविधाएँ, पहुँच और स्थापना की स्थितियाँ अभी पुष्टि के लिए
  • मौजूदा उपकरण और अपस्ट्रीम/डाउनस्ट्रीम इंटरफेस जानकारी अभी पुष्टि के लिए
लिखित प्रस्ताव में परिभाषित HONGKAI की जिम्मेदारी अनुशंसित कॉन्फ़िगरेशन और उद्धृत आपूर्ति सीमा 4 आइटम

HONGKAI उपलब्ध प्रोजेक्ट इनपुट की समीक्षा के बाद अनुशंसित कॉन्फ़िगरेशन और उद्धृत आपूर्ति सीमा को परिभाषित करता है।.

  • अनुशंसित उत्पादन रूट और संदर्भ उपकरण कॉन्फ़िगरेशन अभी पुष्टि के लिए
  • उद्धृत उपकरण सूची और उपकरण-स्रोत सीमा अभी पुष्टि के लिए
  • उद्धृत उपकरण के लिए आवश्यक इंटरफेस अभी पुष्टि के लिए
  • प्रस्ताव में उल्लिखित दस्तावेजीकरण, कमीशनिंग, प्रशिक्षण और बिक्री के बाद का दायरा अभी पुष्टि के लिए
एक साथ पुष्टि किया गया संयोजन की पुष्टि तकनीकी इंटरफेस, स्वीकृति और परियोजना समन्वय 4 आइटम

तकनीकी इंटरफेस, स्वीकृति और परियोजना समन्वय के लिए दोनों परियोजना टीमों से लिखित पुष्टि की आवश्यकता होती है।.

  • अंतिम प्रक्रिया मार्ग और उपकरण विन्यास अभी पुष्टि के लिए
  • विन्यास, इंटरफेस विभाजन और स्थल-तैयारी की शर्तें अभी पुष्टि के लिए
  • स्वीकृति मापदंड, परीक्षण परिस्थितियाँ और नमूना विधि अभी पुष्टि के लिए
  • वितरण, स्थापना, परीक्षण का अनुसूची, परिवर्तन और अंतिम स्वीकृति अभी पुष्टि के लिए

05 योजना इनपुट

Identify the inputs needed to review the ASU production route.

Select the planning topics you are ready to discuss during the first engineering review. A selection marks a review topic only; it does not approve a technical value, equipment quantity, material grade, performance target or supply scope.

Select the production-line planning topics to review
06 संदर्भ और पुष्टि

Review the available ASU references and what still needs confirmation.

These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.

अनुभाग 05 का संदर्भ आगे ले जाया गया है HK-50 loose-tube extrusion → HK-90 ASU dual-FRP positioning, SZ forming and PE sheathing

अभी तक कोई योजनाबद्ध विषय नहीं चुना गया है। समीक्षा प्राथमिकताएँ जोड़ने के लिए अनुभाग 05 पर लौटें।.

Reference image of the HK-50 PBT loose-tube production line used for the first ASU production stage
चरण 01 संदर्भ
अंतिम व्यवस्था नहीं
संदर्भ उपलब्ध

HK-50 PBT loose-tube line reference

Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.

These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.

Selected ASU production-stage reference image
चरण 01 संदर्भ

HK-50 PBT loose-tube line reference

1 of 2
Brazil ASU customer feedback

What Brazil customers value in an ASU project discussion.

Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU

07 Route FAQ

Clarify the route before requesting a proposal.

These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.

यह संदर्भ मार्ग ASU केबल निर्माण पर किस आधार पर है?

The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.

क्या दो-चरणीय मार्ग अग्रिम रंगित प्रकाशीय फाइबर को मानता है?

Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.

पृष्ठ पर दो मुख्य उत्पादन चरण क्यों दिखाई देते हैं?

HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.

क्या HK-50 और HK-90 ASU अंतिम उपकरण विन्यास हैं?

No. They are reference production-stage models used to explain the process route. Final module quantities, dimensions, controls, utilities, optional systems and equipment interfaces are confirmed only after reviewing the cable drawing, materials, capacity target and factory conditions.

क्या मौजूदा उपकरण या खरीदार द्वारा प्रदान किए गए सामग्री को एकीकृत किया जा सकता है?

Potentially, subject to technical review. HONGKAI must confirm material package sizes, tension ranges, line interfaces, control signals, dimensions, utilities, operating conditions and required tests before existing equipment or buyer-supplied materials are included in the proposed route.

लाइन स्पीड और उत्पादन क्षमता की पुष्टि के लिए किन जानकारियों की आवश्यकता होती है?

Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.

क्या मशीन की तस्वीरें और प्रक्रिया वीडियो अंतिम आपूर्ति किए गए उपकरण हैं?

No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.

निरीक्षण, FAT, स्थापना और प्रशिक्षण शामिल हैं?

Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.

Final cable construction, performance, equipment, acceptance criteria and supply scope are defined only in the mutually approved technical and commercial agreement.

08 Investment enquiry

Plan your fiber optic cable production investment.

Share your target cable families, planned capacity, factory conditions and current project stage. HONGKAI will review the process route, equipment scope, system interfaces and open technical items before preparing a project-specific proposal.

Current page context ASU central loose-tube aerial cable · HK-50 → HK-90 ASU reference route This context accompanies the enquiry as a reference. It does not confirm the final production route or equipment configuration. Planning inputs remain open · No supporting stage carried forward

HONGKAI क्या समीक्षा करेगा

लक्ष्य उत्पाद योजना
केबल परिवार, निर्माण, फाइबर गिनती और सामग्री की आवश्यकताएँ
प्रक्रिया मार्ग
प्रारंभिक सामग्री, आवश्यक प्रक्रियाएँ और उपकरण इंटरफेस
क्षमता लक्ष्य
उत्पाद मिश्रण, अपेक्षित आउटपुट और लक्ष्य लाइन स्पीड
कारखाने की स्थितियाँ
उपलब्ध स्थान, सुविधाएँ, मौजूदा उपकरण और परीक्षण की आवश्यकताएँ
प्रोजेक्ट चरण
योजना बनाना, बजट निर्धारण, कारखाना तैयारी या उत्पादन विस्तार
समीक्षा स्थिति
प्रारंभिक मूल्यांकन · तकनीकी पुष्टि आवश्यक
तैयारी करें · 6 आइटम
  • लक्ष्य केबल प्रकार, संदर्भ नमूने या उपलब्ध ड्राइंग
  • फाइबर गिनती, केबल संरचनाएँ और सामग्री की आवश्यकताएँ
  • प्रारंभिक सामग्री और आवश्यक उत्पादन प्रक्रियाएँ
  • लक्ष्य आउटपुट, उत्पाद मिश्रण या अपेक्षित लाइन स्पीड
  • मौजूदा उपकरण, रील आकार और उपलब्ध कारखाना लेआउट
  • सुविधाएँ, परीक्षण आवश्यकताएँ और योजनाबद्ध प्रोजेक्ट टाइमलाइन

क्या पूर्ण विनिर्देश अभी तक नहीं है? अपने लक्ष्य उत्पाद और वर्तमान मान्यताएँ साझा करें। अपुष्ट आइटम “पुष्टि के लिए लंबित” रह सकते हैं।.

यहाँ जमा की गई जानकारी एक प्रारंभिक तकनीकी समीक्षा का समर्थन करती है। अंतिम उपकरण कॉन्फ़िगरेशन, प्रदर्शन, मूल्य, डिलीवरी अनुसूची और आपूर्ति क्षेत्र केवल एक अनुमोदित प्रस्ताव या समझौते में पुष्टि किए जाते हैं।.

निवेश प्रोजेक्ट सारांश

फाइबर ऑप्टिक केबल उत्पादन परियोजना संक्षिप्त विवरण

हमें अपनी योजनाबद्ध केबल उत्पादों, लक्ष्य क्षमता और वर्तमान निवेश चरण के बारे में बताएं। आंशिक जानकारी का स्वागत है, और उपलब्ध होने पर आप केबल ड्राइंग अपलोड कर सकते हैं।.

Contact context

Cable & application

प्रोजेक्ट की दायरा

फ़ाइलें ड्रैग एंड ड्रॉप करें, अपलोड के लिए फ़ाइलें चुनें
Upload a cable drawing, product sample image or technical specification if available.

उद्धरण के लिए पूछें

हम आपको चौबीस घंटे के भीतर जवाब देंगे!!!