GJFJV Dây chuyền sản xuất cáp

Đường sản xuất này tạo ra sản phẩm gì? A two-phase reference route for an indoor tight-buffered distribution cable. HK-30 forms the individual tight-buffered fiber elements. The configured GJFJV/HK-50 phase gathers them, applies aramid yarn and extrudes the common outer jacket. Final fiber count, buffer size, jacket material, gathering method and equipment scope follow the approved cable drawing and written proposal.

Tuyến sản xuất
HK-30 → configured GJFJV / HK-50 phase
Phương pháp điều khiển
Coordinated controls and handoff reviewed for both manufacturing phases
Các quy trình chính
Tight buffering · fiber gathering · aramid application · common-jacket extrusion
Phạm vi cáp phù hợp
GJFJV indoor tight-buffered distribution cable · final design confirmed per project
PRODUCTION ROUTE PREVIEW HK-30 plus configured GJFJV / HK-50 phase
WHAT THE CLIENT SELECTED GJFJV Dây chuyền sản xuất cáp HK-30 · gathering interface · configured HK-50 · indoor tight-buffered distribution-cable route
02 GJFJV cable anatomy

Trace the 12-fiber GJFJV reference structure from optical fiber to common outer jacket.

Open the exploded view and select one of four visible structure groups. See whether it is an incoming HK-30 material, formed by HK-30, or integrated in the configured GJFJV/HK-50 phase. The 12-fiber count is a page reference; final construction follows the approved drawing.

Bản vẽ chi tiết kỹ thuật Reference 12-fiber tight-buffered distribution-cable construction
Cross-section and cutaway 3D reference of a 12-fiber GJFJV indoor distribution cable with colored tight-buffered fibers, aramid yarn and a blue outer jacket 01 Assembled / cutaway reference
Tổng quan · chuyển đổi chế độ xem mà không rời khỏi phần này Tất cả các thành phần cáp vẫn hiển thị trong khi lề trắng dư thừa được giảm bớt.
Đường dẫn cấu trúc - quy trình

Two manufacturing phases form the GJFJV reference cable.

Chọn một lớp phía trên để làm nổi bật giai đoạn chuẩn bị, định hình hoặc tích hợp nó.

01HK-30 · Individual tight-buffer formationPay off the approved optical fiber, extrude the specified tight buffer, cool, monitor and take up each identified element.
02Configured GJFJV / HK-50 phaseGather the tight-buffered elements per drawing, apply aramid yarn, extrude the common jacket and take up the finished cable.
Giới hạn tham chiếu: the selected 12-fiber render explains four visible structure groups, not a fixed product specification. Confirm fiber count, tight-buffer dimensions and compound, identification plan, gathering method, aramid package, outer-jacket material and every finished dimension against the approved drawing. The written proposal must state whether the gathering cage is integrated with HK-50 or supplied as a matched unit.
03 Cấu hình tham chiếu

Review the two production phases behind the GJFJV reference cable.

Carry a structure group from Section 02 into its mapped phase, then compare HK-30 upstream preparation with the configured GJFJV / HK-50 cable-formation phase.

Carried from GJFJV structure No structure group selected Start from the structure workbench above, or review both production phases below.
Choose a structure group
Reference production-phase image HK-30 reference · Uncropped image
HONGKAI HK-30 tight-buffered optical fiber production line reference
Selected production stage Individual tight-buffer formation
Bắt đầu tuyến tham chiếu

HK-30

Individual tight-buffer formation

Pay off the approved primary-coated optical fiber, prepare it as configured, extrude the specified tight buffer, cool, monitor and take up each identified element.

Đầu vào
Approved primary-coated optical fiber + project-specified tight-buffer compound and identification plan
Đầu ra
Individually identified tight-buffered fiber elements ready for cable formation
Vị trí tuyến
Stage 01 · Upstream element formation
Interface to confirm
Finished package, buffer dimensions, identification and Stage 02 feeding interface
Reference production phase
Vai trò quy trình

Form each project-specified tight-buffered element

Coordinate fiber payoff and handling, buffer extrusion, cooling, dimensional monitoring, traction and take-up.

Key production controls

Fiber handling · compound delivery · dimensional control

HK-30 prepares the individual buffered elements required by the approved GJFJV construction. It does not form the common cable jacket.

Xác nhận trước khi đề xuất

Fiber input, buffer system and acceptance criteria

Confirm fiber type, spool, buffer dimensions, compound, colors, tension, output target, reels and inspection criteria.

Reference configuration only.

The Stage 02 panorama explains a configured process phase, not a final machine layout or supply commitment. Final equipment scope, interfaces and acceptance criteria follow the approved cable drawing and written proposal. No default capacity is assumed.

03B Video quy trình liên quan

Use video evidence one production phase at a time.

Review the verified upstream HK-30 recording alongside a related HONGKAI breakout / distribution cable machinery video. Each clip keeps its own evidence boundary so related equipment footage is never presented as proof of the complete configured line.

Stage 01 · HK-30 tight-buffer formation Xem trên YouTube
This official HONGKAI recording supports fiber payoff, preheating, tight-buffer extrusion, cooling, diameter monitoring, haul-off and take-up for Stage 01 only. Any operating values visible in the recording belong to that recording and are not page ratings or guarantees.
04 Trách nhiệm dự án

Define the GJFJV project boundary before the route is finalized.

The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

Trạng thái phạm vi Cần đánh giá kỹ thuật

Không có gì ở dưới đây được coi là bao gồm, loại trừ, do người mua cung cấp hoặc HONGKAI- cung cấp cho đến khi được xác nhận bằng văn bản.

Ma trận trách nhiệm Xem xét cả ba nhóm trách nhiệm

Mở một nhóm chỉ hiển thị chi tiết của nó; không xác nhận phạm vi.

Người mua chuẩn bị Trách nhiệm của người mua Thông tin dự án, sản phẩm và địa điểm để xem xét kỹ thuật 4 mục

Thông tin HONGKAI phải được xem xét trước khi cố định tuyến sản xuất và cấu hình thiết bị tham chiếu.

  • Approved GJFJV cable drawing, target fiber count, tight-buffer dimensions, gathering or stranding method and finished-cable requirements Đang xác nhận
  • Primary-coated optical fiber, tight-buffer material and identification plan, aramid-yarn system, common-jacket material, color and marking inputs Đang xác nhận
  • Factory space, utilities, material flow, reel sizes, access and installation conditions Đang xác nhận
  • Existing equipment and interfaces to Stage 01 tight-buffer formation and the configured Stage 02 phase Đang xác nhận
Được xác định trong đề xuất bằng văn bản Trách nhiệm của HONGKAI Cấu hình đề xuất và phạm vi cung cấp báo giá 4 mục

HONGKAI xác định cấu hình đề xuất và phạm vi cung cấp báo giá sau khi xem xét các đầu vào dự án khả dụng.

  • Recommended two-stage GJFJV route and reference equipment configuration stated in the written proposal Đang xác nhận
  • Quoted equipment list, equipment-source boundary and the proposed Stage 01 to Stage 02 interfaces Đang xác nhận
  • Required tooling, tension control, cooling, diameter measurement, haul-off and take-up, including whether the gathering cage is integrated or supplied as a matched unit Đang xác nhận
  • Phạm vi tài liệu, vận hành, đào tạo và hậu mãi được nêu trong đề xuất Đang xác nhận
Đã xác nhận chung Xác nhận chung Giao diện kỹ thuật, nghiệm thu và phối hợp dự án 4 mục

Giao diện kỹ thuật, nghiệm thu và phối hợp dự án yêu cầu xác nhận bằng văn bản từ cả hai đội dự án.

  • Final GJFJV cable structure, process route and equipment configuration Đang xác nhận
  • Factory layout, equipment interfaces, utilities and site-readiness conditions Đang xác nhận
  • Trial materials, sampling, FAT and acceptance criteria for tight-buffered elements and the finished GJFJV cable Đang xác nhận
  • Delivery timing, installation, trial production, change control and final sign-off Đang xác nhận

05 Đầu vào lập kế hoạch

Prepare the inputs for a complete GJFJV production review.

Chọn các chủ đề lập kế hoạch mà bạn sẵn sàng thảo luận trong buổi đánh giá kỹ thuật đầu tiên. Việc chọn một mục chỉ đánh dấu một chủ đề đánh giá; không đồng ý bất kỳ giá trị kỹ thuật, số lượng thiết bị, cấp độ vật liệu, mục tiêu hiệu suất hay phạm vi cung cấp nào.

Chọn các chủ đề lập kế hoạch dây chuyền sản xuất để xem xét
06 Tham chiếu & xác minh

Review the available GJFJV production references and the evidence boundaries.

The Stage 01 image and video plus the Stage 02 panorama and related equipment video illustrate the current GJFJV reference route. They are not the approved line layout, FAT record, customer case, performance commitment, confirmed supply scope or acceptance record.

Bối cảnh Mục 05 được giữ lại HK-30 tight-buffer formation → configured GJFJV / HK-50 phase for gathering, aramid application and common-jacket extrusion

Chưa chọn chủ đề lập kế hoạch nào. Quay lại Mục 05 để thêm các ưu tiên xem xét.

Reference image of the complete HONGKAI HK-30 tight-buffer formation process line mapped to the GJFJV route
Tham chiếu giai đoạn 01
Bố trí chưa cuối cùng
Có sẵn tài liệu tham khảo

HK-30 tight-buffer formation reference

Reference line for paying off primary-coated optical fiber, forming the identified tight-buffered element, then cooling, measuring, hauling off and taking up. Fiber input, tight-buffer material, dimensions, tooling, tension, identification and reel format remain project-specific.

These production-stage images and the two stage-specific videos illustrate the current GJFJV planning route only. The Stage 02 recording is related equipment footage, not exact configured-line proof. None proves the approved drawing, final layout, equipment quantity, performance, customer result, FAT, supplied scope or acceptance. Those items are defined only by the mutually approved technical and commercial documents.

Tham chiếu giai đoạn 01

HK-30 tight-buffer formation reference

1 của 2
06B GJFJV line feedback

Customer feedback published with HONGKAI's GJFJV production line.

These five-star reviews are reproduced from HONGKAI's current GJFJV production-line page. The selected comments focus on fiber-optic production-line experience and retain their published wording.

Customer photo published with Ahmed Mohamed's feedback on the HONGKAI GJFJV page
Published HONGKAI record
GJFJV page review

“I highly recommend Hongkai's fiber optic cable production line. It has helped us reduce production time and costs while maintaining the highest standards of quality. The customer service provided by Hongkai has also been exceptional.”

Ahmed MohamedGiám đốc
Customer photo published with Tariq Abdullah's feedback on the HONGKAI GJFJV page
Published HONGKAI record
GJFJV page review

“We've been using the Hongkai fiber optic cable production line for years now and it never fails to impress. It's an essential piece of equipment for our operations in Jakarta.”

Tariq AbdullahGiám đốc điều hành
Customer photo published with Maria da Silva's feedback on the HONGKAI GJFJV page
Published HONGKAI record
GJFJV page review

“The quality of the fiber optic cable produced by Hongkai's production line is unmatched. It's helped us become a major player in the telecom industry here in São Paulo.”

Maria da SilvaCán bộ WP

Source boundary: these review excerpts and five-star displays reproduce what is currently published on HONGKAI's GJFJV page. Customer statements describe their experience; final GJFJV configuration, output, FAT, supplied scope and acceptance remain project-specific.

07 Đường đi FAQ

Clarify the GJFJV route before requesting a proposal.

These answers connect the individually tight-buffered distribution-cable structure to the two reference stages and the inputs needed for engineering review.

Các giai đoạn nào được bao gồm trong tuyến tham chiếu GJFJV?

The reference route has two stages. HK-30 forms each identified tight-buffered optical-fiber element. The configured GJFJV / HK-50 phase gathers or arranges those elements as defined by the drawing, applies the common aramid system, extrudes the common outer jacket, then cools, monitors, hauls off and takes up the finished cable. The final route follows the approved drawing and written project inputs.

Trang này sử dụng cấu trúc cáp nào làm tài liệu tham khảo?

The reference is an indoor distribution construction with multiple individually tight-buffered optical fibers, one common aramid system and one common outer jacket. The product rendering is representative and does not fix fiber count, dimensions, material grades or performance.

Đầu ra của Giai đoạn 01 được chuyển cho Giai đoạn 02 như thế nào?

Reel format, tight-buffer dimensions, identification, tension and handling requirements must match the configured Stage 02 input. If the buyer already has qualified tight-buffered fibers, Stage 01 may become an upstream or existing-equipment interface. That does not automatically place Stage 01 inside the supplied scope.

Người mua cần cung cấp gì để xem xét kỹ thuật?

Provide the approved drawing or sample, target fiber count, optical-fiber and input-reel data, tight-buffer dimensions, material and identification, gathering or stranding method, any applicable lay direction or pitch, aramid and jacket requirements, marking, target output, reel plan, factory utilities, existing equipment, inspection and acceptance needs, and the project schedule.

Những vật liệu và lựa chọn cấu hình nào vẫn mang tính đặc thù của từng dự án?

Fiber count, tight-buffer dimensions, material and identification, parallel gathering or a light lay or defined stranding method, cage integration or a matched unit, aramid package, jacket material, profile and color, tooling, controls, reels and inspection points all require written confirmation. This page does not select a fixed version.

Những hình ảnh và video quy trình chứng minh điều gì?

The structure renders, equipment image and Stage 02 panorama support visual review only. The verified HK-30 recording supports the Stage 01 process shown in that recording. The Stage 02 breakout / distribution cable machinery recording is related equipment footage only and does not verify the exact configured GJFJV / HK-50 route. None proves the approved drawing, complete two-stage supply, final layout, speed, capacity, performance, certification, FAT or customer result, and visible recording values are not page guarantees.

Cần xem xét thiết bị hiện có và điều kiện nhà máy như thế nào?

Confirm whether Stage 01 already exists, whether the gathering cage is integrated or supplied as a matched unit, available space and material flow, power, cooling, air where required, reel handling and inspection interfaces. A catalog image or reference panorama is not a project layout commitment.

Công suất, thử nghiệm tại nhà máy (FAT), lắp đặt và dịch vụ được xác nhận như thế nào?

The written technical and commercial documents define buyer materials, the stable-operation basis, speed or output targets, sampling and instruments, FAT or site acceptance, installation, training, spare parts, service and each party's responsibility. This page assumes no default capacity or service scope.

Final cable construction, equipment, performance, acceptance criteria and supply scope are defined in the signed technical and commercial agreement.

08 Hỏi về đầu tư

Define the GJFJV construction and two-stage production boundary.

Share the available GJFJV drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding method, cage arrangement, aramid and common-jacket requirements, finished dimensions and marking, output and reel plan, factory conditions, inspection and acceptance basis, and project schedule. HONGKAI will review the open engineering items before preparing a project-specific proposal.

Bối cảnh trang hiện tại GJFJV · HK-30 to configured GJFJV / HK-50 phase Browser context accompanies the enquiry for routing only. It does not approve the cable construction, material, equipment, operating result or supplied scope. Planning inputs remain open · No supporting process stage carried forward

Ai sẽ xem xét HONGKAI

Cấu trúc cáp
Drawing or sample, target fiber count, individual tight-buffer arrangement and finished requirements
Stage 01 interface
Primary-coated fiber input, tight-buffer dimensions, material, identification and reel handoff
Gathering & cage
Parallel gathering or defined stranding method and whether the cage is integrated or matched
Aramid & jacket
Common aramid system, jacket material, profile, color, tooling, marking and finished dimensions
Capacity & reels
Product mix, shifts, target output, stable-operation basis and input and output reel formats
Factory & acceptance
Layout, utilities, existing equipment, inspection, FAT, installation and service boundary
Những gì cần chuẩn bị · các mục 6
  • Available GJFJV drawing, reference sample, target fiber count and finished requirements
  • Optical-fiber input, tight-buffer dimensions, material, identification and qualified-element status
  • Gathering or stranding method, fiber order, applicable lay definition and cage arrangement
  • Aramid system, common-jacket material, profile, color, tooling and marking
  • Target output, shifts, stable-operation basis and source and delivery reel formats
  • Factory conditions, existing interfaces, inspection, FAT, acceptance, installation and schedule

No complete specification yet? Share the known construction and operating conditions. Unknown values can remain open for engineering review.

The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.

GJFJV production project brief

Provide the GJFJV drawing, tight-buffer inputs, gathering method and finished-cable targets.

Add the available drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding and cage arrangement, aramid and common-jacket requirements, target output, factory conditions and acceptance basis.

Drag & Drop Files, Choose Files to Upload
Cho phép khách hàng tải lên bản vẽ cáp, thông số kỹ thuật hoặc tài liệu tham khảo hiện có. Hiển thị các loại tệp được chấp nhận và giới hạn kích thước tệp được cấu hình trong WPForms.

Yêu cầu báo giá

chúng tôi sẽ trả lời bạn trong vòng 24 giờ!!!