GJFJV Dây chuyền sản xuất cáp
Stage 02 panorama · HK-30 tight buffering remains the upstream phase
Đường sản xuất này tạo ra sản phẩm gì? A two-phase reference route for an indoor tight-buffered distribution cable. HK-30 forms the individual tight-buffered fiber elements. The configured GJFJV/HK-50 phase gathers them, applies aramid yarn and extrudes the common outer jacket. Final fiber count, buffer size, jacket material, gathering method and equipment scope follow the approved cable drawing and written proposal.
- Tuyến sản xuất
- HK-30 → configured GJFJV / HK-50 phase
- Phương pháp điều khiển
- Coordinated controls and handoff reviewed for both manufacturing phases
- Các quy trình chính
- Tight buffering · fiber gathering · aramid application · common-jacket extrusion
- Phạm vi cáp phù hợp
- GJFJV indoor tight-buffered distribution cable · final design confirmed per project
Trace the 12-fiber GJFJV reference structure from optical fiber to common outer jacket.
Open the exploded view and select one of four visible structure groups. See whether it is an incoming HK-30 material, formed by HK-30, or integrated in the configured GJFJV/HK-50 phase. The 12-fiber count is a page reference; final construction follows the approved drawing.
01
Assembled / cutaway reference
Two manufacturing phases form the GJFJV reference cable.
Chọn một lớp phía trên để làm nổi bật giai đoạn chuẩn bị, định hình hoặc tích hợp nó.
Review the two production phases behind the GJFJV reference cable.
Carry a structure group from Section 02 into its mapped phase, then compare HK-30 upstream preparation with the configured GJFJV / HK-50 cable-formation phase.
HK-30
Individual tight-buffer formation
Pay off the approved primary-coated optical fiber, prepare it as configured, extrude the specified tight buffer, cool, monitor and take up each identified element.
- Đầu vào
- Approved primary-coated optical fiber + project-specified tight-buffer compound and identification plan
- Đầu ra
- Individually identified tight-buffered fiber elements ready for cable formation
- Vị trí tuyến
- Stage 01 · Upstream element formation
- Interface to confirm
- Finished package, buffer dimensions, identification and Stage 02 feeding interface
Form each project-specified tight-buffered element
Coordinate fiber payoff and handling, buffer extrusion, cooling, dimensional monitoring, traction and take-up.
Fiber handling · compound delivery · dimensional control
HK-30 prepares the individual buffered elements required by the approved GJFJV construction. It does not form the common cable jacket.
Fiber input, buffer system and acceptance criteria
Confirm fiber type, spool, buffer dimensions, compound, colors, tension, output target, reels and inspection criteria.
The Stage 02 panorama explains a configured process phase, not a final machine layout or supply commitment. Final equipment scope, interfaces and acceptance criteria follow the approved cable drawing and written proposal. No default capacity is assumed.
Use video evidence one production phase at a time.
Review the verified upstream HK-30 recording alongside a related HONGKAI breakout / distribution cable machinery video. Each clip keeps its own evidence boundary so related equipment footage is never presented as proof of the complete configured line.
The related equipment video is temporarily unavailable.
The approved drawing and written proposal still control the configured gathering, aramid and common-jacket phase.
Define the GJFJV project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Không có gì ở dưới đây được coi là bao gồm, loại trừ, do người mua cung cấp hoặc HONGKAI- cung cấp cho đến khi được xác nhận bằng văn bản.
Mở một nhóm chỉ hiển thị chi tiết của nó; không xác nhận phạm vi.
01 Người mua chuẩn bị Trách nhiệm của người mua Thông tin dự án, sản phẩm và địa điểm để xem xét kỹ thuật 4 mục
Thông tin HONGKAI phải được xem xét trước khi cố định tuyến sản xuất và cấu hình thiết bị tham chiếu.
- Approved GJFJV cable drawing, target fiber count, tight-buffer dimensions, gathering or stranding method and finished-cable requirements Đang xác nhận
- Primary-coated optical fiber, tight-buffer material and identification plan, aramid-yarn system, common-jacket material, color and marking inputs Đang xác nhận
- Factory space, utilities, material flow, reel sizes, access and installation conditions Đang xác nhận
- Existing equipment and interfaces to Stage 01 tight-buffer formation and the configured Stage 02 phase Đang xác nhận
02 Được xác định trong đề xuất bằng văn bản Trách nhiệm của HONGKAI Cấu hình đề xuất và phạm vi cung cấp báo giá 4 mục
HONGKAI xác định cấu hình đề xuất và phạm vi cung cấp báo giá sau khi xem xét các đầu vào dự án khả dụng.
- Recommended two-stage GJFJV route and reference equipment configuration stated in the written proposal Đang xác nhận
- Quoted equipment list, equipment-source boundary and the proposed Stage 01 to Stage 02 interfaces Đang xác nhận
- Required tooling, tension control, cooling, diameter measurement, haul-off and take-up, including whether the gathering cage is integrated or supplied as a matched unit Đang xác nhận
- Phạm vi tài liệu, vận hành, đào tạo và hậu mãi được nêu trong đề xuất Đang xác nhận
03 Đã xác nhận chung Xác nhận chung Giao diện kỹ thuật, nghiệm thu và phối hợp dự án 4 mục
Giao diện kỹ thuật, nghiệm thu và phối hợp dự án yêu cầu xác nhận bằng văn bản từ cả hai đội dự án.
- Final GJFJV cable structure, process route and equipment configuration Đang xác nhận
- Factory layout, equipment interfaces, utilities and site-readiness conditions Đang xác nhận
- Trial materials, sampling, FAT and acceptance criteria for tight-buffered elements and the finished GJFJV cable Đang xác nhận
- Delivery timing, installation, trial production, change control and final sign-off Đang xác nhận
Prepare the inputs for a complete GJFJV production review.
Chọn các chủ đề lập kế hoạch mà bạn sẵn sàng thảo luận trong buổi đánh giá kỹ thuật đầu tiên. Việc chọn một mục chỉ đánh dấu một chủ đề đánh giá; không đồng ý bất kỳ giá trị kỹ thuật, số lượng thiết bị, cấp độ vật liệu, mục tiêu hiệu suất hay phạm vi cung cấp nào.
Review the available GJFJV production references and the evidence boundaries.
The Stage 01 image and video plus the Stage 02 panorama and related equipment video illustrate the current GJFJV reference route. They are not the approved line layout, FAT record, customer case, performance commitment, confirmed supply scope or acceptance record.
Chưa chọn chủ đề lập kế hoạch nào. Quay lại Mục 05 để thêm các ưu tiên xem xét.
HK-30 tight-buffer formation reference
Reference line for paying off primary-coated optical fiber, forming the identified tight-buffered element, then cooling, measuring, hauling off and taking up. Fiber input, tight-buffer material, dimensions, tooling, tension, identification and reel format remain project-specific.
These production-stage images and the two stage-specific videos illustrate the current GJFJV planning route only. The Stage 02 recording is related equipment footage, not exact configured-line proof. None proves the approved drawing, final layout, equipment quantity, performance, customer result, FAT, supplied scope or acceptance. Those items are defined only by the mutually approved technical and commercial documents.
Customer feedback published with HONGKAI's GJFJV production line.
These five-star reviews are reproduced from HONGKAI's current GJFJV production-line page. The selected comments focus on fiber-optic production-line experience and retain their published wording.
“I highly recommend Hongkai's fiber optic cable production line. It has helped us reduce production time and costs while maintaining the highest standards of quality. The customer service provided by Hongkai has also been exceptional.”
“We've been using the Hongkai fiber optic cable production line for years now and it never fails to impress. It's an essential piece of equipment for our operations in Jakarta.”
“The quality of the fiber optic cable produced by Hongkai's production line is unmatched. It's helped us become a major player in the telecom industry here in São Paulo.”
Source boundary: these review excerpts and five-star displays reproduce what is currently published on HONGKAI's GJFJV page. Customer statements describe their experience; final GJFJV configuration, output, FAT, supplied scope and acceptance remain project-specific.
Clarify the GJFJV route before requesting a proposal.
These answers connect the individually tight-buffered distribution-cable structure to the two reference stages and the inputs needed for engineering review.
Các giai đoạn nào được bao gồm trong tuyến tham chiếu GJFJV?
The reference route has two stages. HK-30 forms each identified tight-buffered optical-fiber element. The configured GJFJV / HK-50 phase gathers or arranges those elements as defined by the drawing, applies the common aramid system, extrudes the common outer jacket, then cools, monitors, hauls off and takes up the finished cable. The final route follows the approved drawing and written project inputs.
Trang này sử dụng cấu trúc cáp nào làm tài liệu tham khảo?
The reference is an indoor distribution construction with multiple individually tight-buffered optical fibers, one common aramid system and one common outer jacket. The product rendering is representative and does not fix fiber count, dimensions, material grades or performance.
Đầu ra của Giai đoạn 01 được chuyển cho Giai đoạn 02 như thế nào?
Reel format, tight-buffer dimensions, identification, tension and handling requirements must match the configured Stage 02 input. If the buyer already has qualified tight-buffered fibers, Stage 01 may become an upstream or existing-equipment interface. That does not automatically place Stage 01 inside the supplied scope.
Người mua cần cung cấp gì để xem xét kỹ thuật?
Provide the approved drawing or sample, target fiber count, optical-fiber and input-reel data, tight-buffer dimensions, material and identification, gathering or stranding method, any applicable lay direction or pitch, aramid and jacket requirements, marking, target output, reel plan, factory utilities, existing equipment, inspection and acceptance needs, and the project schedule.
Những vật liệu và lựa chọn cấu hình nào vẫn mang tính đặc thù của từng dự án?
Fiber count, tight-buffer dimensions, material and identification, parallel gathering or a light lay or defined stranding method, cage integration or a matched unit, aramid package, jacket material, profile and color, tooling, controls, reels and inspection points all require written confirmation. This page does not select a fixed version.
Những hình ảnh và video quy trình chứng minh điều gì?
The structure renders, equipment image and Stage 02 panorama support visual review only. The verified HK-30 recording supports the Stage 01 process shown in that recording. The Stage 02 breakout / distribution cable machinery recording is related equipment footage only and does not verify the exact configured GJFJV / HK-50 route. None proves the approved drawing, complete two-stage supply, final layout, speed, capacity, performance, certification, FAT or customer result, and visible recording values are not page guarantees.
Cần xem xét thiết bị hiện có và điều kiện nhà máy như thế nào?
Confirm whether Stage 01 already exists, whether the gathering cage is integrated or supplied as a matched unit, available space and material flow, power, cooling, air where required, reel handling and inspection interfaces. A catalog image or reference panorama is not a project layout commitment.
Công suất, thử nghiệm tại nhà máy (FAT), lắp đặt và dịch vụ được xác nhận như thế nào?
The written technical and commercial documents define buyer materials, the stable-operation basis, speed or output targets, sampling and instruments, FAT or site acceptance, installation, training, spare parts, service and each party's responsibility. This page assumes no default capacity or service scope.
Final cable construction, equipment, performance, acceptance criteria and supply scope are defined in the signed technical and commercial agreement.
Define the GJFJV construction and two-stage production boundary.
Share the available GJFJV drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding method, cage arrangement, aramid and common-jacket requirements, finished dimensions and marking, output and reel plan, factory conditions, inspection and acceptance basis, and project schedule. HONGKAI will review the open engineering items before preparing a project-specific proposal.
Ai sẽ xem xét HONGKAI
- Cấu trúc cáp
- Drawing or sample, target fiber count, individual tight-buffer arrangement and finished requirements
- Stage 01 interface
- Primary-coated fiber input, tight-buffer dimensions, material, identification and reel handoff
- Gathering & cage
- Parallel gathering or defined stranding method and whether the cage is integrated or matched
- Aramid & jacket
- Common aramid system, jacket material, profile, color, tooling, marking and finished dimensions
- Capacity & reels
- Product mix, shifts, target output, stable-operation basis and input and output reel formats
- Factory & acceptance
- Layout, utilities, existing equipment, inspection, FAT, installation and service boundary
Những gì cần chuẩn bị · các mục 6
- Available GJFJV drawing, reference sample, target fiber count and finished requirements
- Optical-fiber input, tight-buffer dimensions, material, identification and qualified-element status
- Gathering or stranding method, fiber order, applicable lay definition and cage arrangement
- Aramid system, common-jacket material, profile, color, tooling and marking
- Target output, shifts, stable-operation basis and source and delivery reel formats
- Factory conditions, existing interfaces, inspection, FAT, acceptance, installation and schedule
No complete specification yet? Share the known construction and operating conditions. Unknown values can remain open for engineering review.
The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Provide the GJFJV drawing, tight-buffer inputs, gathering method and finished-cable targets.
Add the available drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding and cage arrangement, aramid and common-jacket requirements, target output, factory conditions and acceptance basis.
