خط إنتاج كابل GJFJV
Stage 02 panorama · HK-30 tight buffering remains the upstream phase
ما الذي تنتجه مسار الإنتاج هذا؟ A two-phase reference route for an indoor tight-buffered distribution cable. HK-30 forms the individual tight-buffered fiber elements. The configured GJFJV/HK-50 phase gathers them, applies aramid yarn and extrudes the common outer jacket. Final fiber count, buffer size, jacket material, gathering method and equipment scope follow the approved cable drawing and written proposal.
- مسار الإنتاج
- HK-30 → configured GJFJV / HK-50 phase
- نهج التحكم
- تمت مراجعة ضوابط التنسيق وتسليم المهام لكلا مرحلتي التصنيع
- العمليات الرئيسية
- تبطين محكم · تجميع الألياف · تطبيق الأراميد · بثق الغلاف المشترك
- مدى الكابلات المناسب
- كابل توزيع داخلي GJFJV بطبقة عازلة مشدودة · تم تأكيد التصميم النهائي وفقًا للمشروع
Trace the 12-fiber GJFJV reference structure from optical fiber to common outer jacket.
Open the exploded view and select one of four visible structure groups. See whether it is an incoming HK-30 material, formed by HK-30, or integrated in the configured GJFJV/HK-50 phase. The 12-fiber count is a page reference; final construction follows the approved drawing.
01
Assembled / cutaway reference
Two manufacturing phases form the GJFJV reference cable.
حدد طبقة أعلاه لتسليط الضوء على المرحلة التي تعدّها أو تشكّلها أو تدمجها في الكابل.
Review the two production phases behind the GJFJV reference cable.
Carry a structure group from Section 02 into its mapped phase, then compare HK-30 upstream preparation with the configured GJFJV / HK-50 cable-formation phase.
HK-30
Individual tight-buffer formation
Pay off the approved primary-coated optical fiber, prepare it as configured, extrude the specified tight buffer, cool, monitor and take up each identified element.
- المدخل
- Approved primary-coated optical fiber + project-specified tight-buffer compound and identification plan
- المخرج
- Individually identified tight-buffered fiber elements ready for cable formation
- موقع المسار
- Stage 01 · Upstream element formation
- Interface to confirm
- Finished package, buffer dimensions, identification and Stage 02 feeding interface
شكّل كل عنصر مخزّن بإحكام محدد للمشروع
Coordinate fiber payoff and handling, buffer extrusion, cooling, dimensional monitoring, traction and take-up.
معالجة الألياف · توصيل المركب · التحكم بالأبعاد
HK-30 prepares the individual buffered elements required by the approved GJFJV construction. It does not form the common cable jacket.
مدخل الألياف، نظام العزل ومعايير القبول
تأكيد نوع الألياف، البكرة، أبعاد العازل، المركب، الألوان، الشد، الهدف من الإنتاج، البكرات ومعايير الفحص.
The Stage 02 panorama explains a configured process phase, not a final machine layout or supply commitment. Final equipment scope, interfaces and acceptance criteria follow the approved cable drawing and written proposal. No default capacity is assumed.
استخدم دليل الفيديو مرحلة إنتاج واحدة في كل مرة.
Review the verified upstream HK-30 recording alongside a related HONGKAI breakout / distribution cable machinery video. Each clip keeps its own evidence boundary so related equipment footage is never presented as proof of the complete configured line.
فيديو المعدات ذات الصلة غير متاح مؤقتًا.
لا يزال الرسم المعتمد والمقترح الكتابي يتحكمان في مرحلة التجميع المهيأة، والأراميد، والغلاف المشترك.
عرّف حدود مشروع GJFJV قبل الانتهاء من تحديد المسار.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
فتح مجموعة ما يكشف تفاصيلها فقط؛ ولا يؤكد النطاق.
01 يُعد المشتري مسؤولية المشتري معلومات المشروع والمنتج والموقع للمراجعة الهندسية 4 items
يجب على المعلومات HONGKAI مراجعتها قبل تحديد مسار الإنتاج وتكوين المعدات المرجعية.
- رسم كابل GJFJV المعتمد، عدد الألياف المستهدف، أبعاد الغلاف الضيق، طريقة التجميع أو التفتيش، ومتطلبات الكابل النهائي قيد التأكيد
- الألياف البصرية المغطاة بالطبقة الأولية، مادة الغلاف الضيق وخطة التعريف، نظام خيوط الأراميد، مادة الغلاف المشترك، مدخلات اللون والعلامات قيد التأكيد
- Factory space, utilities, material flow, reel sizes, access and installation conditions قيد التأكيد
- Existing equipment and interfaces to Stage 01 tight-buffer formation and the configured Stage 02 phase قيد التأكيد
02 محدد في العرض المكتوب مسؤولية HONGKAI تكوين موصى به وحدود التوريد المقتبس 4 items
HONGKAI يحدد التكوين الموصى به وحدود التوريد المقتبس بعد مراجعة المدخلات المتاحة للمشروع.
- Recommended two-stage GJFJV route and reference equipment configuration stated in the written proposal قيد التأكيد
- Quoted equipment list, equipment-source boundary and the proposed Stage 01 to Stage 02 interfaces قيد التأكيد
- Required tooling, tension control, cooling, diameter measurement, haul-off and take-up, including whether the gathering cage is integrated or supplied as a matched unit قيد التأكيد
- نطاق الوثائق، والتشغيل، والتدريب، وما بعد البيع المذكور في العرض قيد التأكيد
03 تم التأكيد معًا تأكيد مشترك الواجهات الفنية، القبول، وتنسيق المشروع 4 items
تتطلب الواجهات الفنية، القبول، وتنسيق المشروع تأكيدًا كتابيًا من فريقَي المشروع.
- Final GJFJV cable structure, process route and equipment configuration قيد التأكيد
- Factory layout, equipment interfaces, utilities and site-readiness conditions قيد التأكيد
- Trial materials, sampling, FAT and acceptance criteria for tight-buffered elements and the finished GJFJV cable قيد التأكيد
- Delivery timing, installation, trial production, change control and final sign-off قيد التأكيد
Prepare the inputs for a complete GJFJV production review.
اختر مواضيع التخطيط التي أنت مستعد لمناقشتها خلال المراجعة الهندسية الأولى. الاختيار يُسجّل موضوع المراجعة فقط؛ ولا يوافق على قيمة تقنية أو كمية معدات أو درجة مواد أو هدف أداء أو نطاق توريد.
Review the available GJFJV production references and the evidence boundaries.
The Stage 01 image and video plus the Stage 02 panorama and related equipment video illustrate the current GJFJV reference route. They are not the approved line layout, FAT record, customer case, performance commitment, confirmed supply scope or acceptance record.
لم يتم اختيار أي مواضيع تخطيطية بعد. عد إلى القسم 05 لإضافة أولويات المراجعة.
HK-30 tight-buffer formation reference
Reference line for paying off primary-coated optical fiber, forming the identified tight-buffered element, then cooling, measuring, hauling off and taking up. Fiber input, tight-buffer material, dimensions, tooling, tension, identification and reel format remain project-specific.
These production-stage images and the two stage-specific videos illustrate the current GJFJV planning route only. The Stage 02 recording is related equipment footage, not exact configured-line proof. None proves the approved drawing, final layout, equipment quantity, performance, customer result, FAT, supplied scope or acceptance. Those items are defined only by the mutually approved technical and commercial documents.
Customer feedback published with HONGKAI's GJFJV production line.
These five-star reviews are reproduced from HONGKAI's current GJFJV production-line page. The selected comments focus on fiber-optic production-line experience and retain their published wording.
“I highly recommend Hongkai's fiber optic cable production line. It has helped us reduce production time and costs while maintaining the highest standards of quality. The customer service provided by Hongkai has also been exceptional.”
“We've been using the Hongkai fiber optic cable production line for years now and it never fails to impress. It's an essential piece of equipment for our operations in Jakarta.”
“The quality of the fiber optic cable produced by Hongkai's production line is unmatched. It's helped us become a major player in the telecom industry here in São Paulo.”
Source boundary: these review excerpts and five-star displays reproduce what is currently published on HONGKAI's GJFJV page. Customer statements describe their experience; final GJFJV configuration, output, FAT, supplied scope and acceptance remain project-specific.
Clarify the GJFJV route before requesting a proposal.
These answers connect the individually tight-buffered distribution-cable structure to the two reference stages and the inputs needed for engineering review.
ما المراحل التي يشملها مسار GJFJV المرجعي؟
The reference route has two stages. HK-30 forms each identified tight-buffered optical-fiber element. The configured GJFJV / HK-50 phase gathers or arranges those elements as defined by the drawing, applies the common aramid system, extrudes the common outer jacket, then cools, monitors, hauls off and takes up the finished cable. The final route follows the approved drawing and written project inputs.
ما هي تركيبة الكابل التي يستخدمها هذا الصفحة كمرجع؟
The reference is an indoor distribution construction with multiple individually tight-buffered optical fibers, one common aramid system and one common outer jacket. The product rendering is representative and does not fix fiber count, dimensions, material grades or performance.
كيف يتم تسليم مخرج المرحلة 01 إلى المرحلة 02؟
Reel format, tight-buffer dimensions, identification, tension and handling requirements must match the configured Stage 02 input. If the buyer already has qualified tight-buffered fibers, Stage 01 may become an upstream or existing-equipment interface. That does not automatically place Stage 01 inside the supplied scope.
ما الذي يجب أن يقدّمه المشتري لمراجعة هندسية؟
Provide the approved drawing or sample, target fiber count, optical-fiber and input-reel data, tight-buffer dimensions, material and identification, gathering or stranding method, any applicable lay direction or pitch, aramid and jacket requirements, marking, target output, reel plan, factory utilities, existing equipment, inspection and acceptance needs, and the project schedule.
ما المواد وخيارات التكوين التي تظل خاصة بالمشروع؟
Fiber count, tight-buffer dimensions, material and identification, parallel gathering or a light lay or defined stranding method, cage integration or a matched unit, aramid package, jacket material, profile and color, tooling, controls, reels and inspection points all require written confirmation. This page does not select a fixed version.
ماذا تثبت الصور ومقاطع الفيديو الخاصة بالعملية؟
The structure renders, equipment image and Stage 02 panorama support visual review only. The verified HK-30 recording supports the Stage 01 process shown in that recording. The Stage 02 breakout / distribution cable machinery recording is related equipment footage only and does not verify the exact configured GJFJV / HK-50 route. None proves the approved drawing, complete two-stage supply, final layout, speed, capacity, performance, certification, FAT or customer result, and visible recording values are not page guarantees.
كيف ينبغي مراجعة المعدات الحالية وظروف المصنع؟
Confirm whether Stage 01 already exists, whether the gathering cage is integrated or supplied as a matched unit, available space and material flow, power, cooling, air where required, reel handling and inspection interfaces. A catalog image or reference panorama is not a project layout commitment.
كيف يتم تأكيد السعة، واختبار القبول النهائي (FAT)، والتركيب والخدمة؟
The written technical and commercial documents define buyer materials, the stable-operation basis, speed or output targets, sampling and instruments, FAT or site acceptance, installation, training, spare parts, service and each party's responsibility. This page assumes no default capacity or service scope.
Final cable construction, equipment, performance, acceptance criteria and supply scope are defined in the signed technical and commercial agreement.
Define the GJFJV construction and two-stage production boundary.
Share the available GJFJV drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding method, cage arrangement, aramid and common-jacket requirements, finished dimensions and marking, output and reel plan, factory conditions, inspection and acceptance basis, and project schedule. HONGKAI will review the open engineering items before preparing a project-specific proposal.
ما الذي سيُراجعه HONGKAI
- بناء الكابل
- Drawing or sample, target fiber count, individual tight-buffer arrangement and finished requirements
- Stage 01 interface
- Primary-coated fiber input, tight-buffer dimensions, material, identification and reel handoff
- Gathering & cage
- Parallel gathering or defined stranding method and whether the cage is integrated or matched
- Aramid & jacket
- نظام الأراميد الشائع، مادة الغلاف، المقطع العرضي، اللون، الأدوات، الوسم والأبعاد النهائية
- Capacity & reels
- مزيج المنتجات، والورديات، وناتج الإنتاج المستهدف، وأساس التشغيل المستقر، وتنسيقات بكرات الإدخال والإخراج
- Factory & acceptance
- Layout, utilities, existing equipment, inspection, FAT, installation and service boundary
ما يجب إعداده · عناصر 6
- Available GJFJV drawing, reference sample, target fiber count and finished requirements
- Optical-fiber input, tight-buffer dimensions, material, identification and qualified-element status
- Gathering or stranding method, fiber order, applicable lay definition and cage arrangement
- نظام الأراميد، مادة الغلاف المشترك، المقطع العرضي، اللون، الأدوات والوسم
- Target output, shifts, stable-operation basis and source and delivery reel formats
- Factory conditions, existing interfaces, inspection, FAT, acceptance, installation and schedule
No complete specification yet? Share the known construction and operating conditions. Unknown values can remain open for engineering review.
The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Provide the GJFJV drawing, tight-buffer inputs, gathering method and finished-cable targets.
Add the available drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding and cage arrangement, aramid and common-jacket requirements, target output, factory conditions and acceptance basis.









