GJFJV Cable Production Line

이 생산 경로는 무엇을 생산합니까? A two-phase reference route for an indoor tight-buffered distribution cable. HK-30 forms the individual tight-buffered fiber elements. The configured GJFJV/HK-50 phase gathers them, applies aramid yarn and extrudes the common outer jacket. Final fiber count, buffer size, jacket material, gathering method and equipment scope follow the approved cable drawing and written proposal.

생산 루트
HK-30 → configured GJFJV / HK-50 phase
제어 방식
Coordinated controls and handoff reviewed for both manufacturing phases
주요 공정
Tight buffering · fiber gathering · aramid application · common-jacket extrusion
적합한 케이블 범위
GJFJV indoor tight-buffered distribution cable · final design confirmed per project
PRODUCTION ROUTE PREVIEW HK-30 plus configured GJFJV / HK-50 phase
WHAT THE CLIENT SELECTED GJFJV Cable Production Line HK-30 · gathering interface · configured HK-50 · indoor tight-buffered distribution-cable route
02 GJFJV cable anatomy

Trace the 12-fiber GJFJV reference structure from optical fiber to common outer jacket.

Open the exploded view and select one of four visible structure groups. See whether it is an incoming HK-30 material, formed by HK-30, or integrated in the configured GJFJV/HK-50 phase. The 12-fiber count is a page reference; final construction follows the approved drawing.

공학 폭발도 판 Reference 12-fiber tight-buffered distribution-cable construction
Cross-section and cutaway 3D reference of a 12-fiber GJFJV indoor distribution cable with colored tight-buffered fibers, aramid yarn and a blue outer jacket 01 Assembled / cutaway reference
개요 · 이 섹션을 떠나지 않고 보기 전환 All cable components remain visible while excess white margin is reduced.
구조-공정 경로

Two manufacturing phases form the GJFJV reference cable.

위쪽 레이어를 선택하여 준비, 형성 또는 통합하는 단계를 강조 표시하세요.

01HK-30 · Individual tight-buffer formationPay off the approved optical fiber, extrude the specified tight buffer, cool, monitor and take up each identified element.
02Configured GJFJV / HK-50 phaseGather the tight-buffered elements per drawing, apply aramid yarn, extrude the common jacket and take up the finished cable.
참조 경계: the selected 12-fiber render explains four visible structure groups, not a fixed product specification. Confirm fiber count, tight-buffer dimensions and compound, identification plan, gathering method, aramid package, outer-jacket material and every finished dimension against the approved drawing. The written proposal must state whether the gathering cage is integrated with HK-50 or supplied as a matched unit.
03 참조 구성

Review the two production phases behind the GJFJV reference cable.

Carry a structure group from Section 02 into its mapped phase, then compare HK-30 upstream preparation with the configured GJFJV / HK-50 cable-formation phase.

Carried from GJFJV structure No structure group selected Start from the structure workbench above, or review both production phases below.
Choose a structure group
Reference production-phase image HK-30 reference · Uncropped image
HONGKAI HK-30 tight-buffered optical fiber production line reference
Selected production stage Individual tight-buffer formation
참조 경로 시작

HK-30

Individual tight-buffer formation

Pay off the approved primary-coated optical fiber, prepare it as configured, extrude the specified tight buffer, cool, monitor and take up each identified element.

입력
Approved primary-coated optical fiber + project-specified tight-buffer compound and identification plan
출력
Individually identified tight-buffered fiber elements ready for cable formation
경로 위치
Stage 01 · Upstream element formation
Interface to confirm
Finished package, buffer dimensions, identification and Stage 02 feeding interface
Reference production phase
공정 역할

Form each project-specified tight-buffered element

Coordinate fiber payoff and handling, buffer extrusion, cooling, dimensional monitoring, traction and take-up.

주요 생산 컨트롤

Fiber handling · compound delivery · dimensional control

HK-30 prepares the individual buffered elements required by the approved GJFJV construction. It does not form the common cable jacket.

제안 전 확인

Fiber input, buffer system and acceptance criteria

Confirm fiber type, spool, buffer dimensions, compound, colors, tension, output target, reels and inspection criteria.

Reference configuration only.

The Stage 02 panorama explains a configured process phase, not a final machine layout or supply commitment. Final equipment scope, interfaces and acceptance criteria follow the approved cable drawing and written proposal. No default capacity is assumed.

03B 관련 공정 동영상

Use video evidence one production phase at a time.

Review the verified upstream HK-30 recording alongside a related HONGKAI breakout / distribution cable machinery video. Each clip keeps its own evidence boundary so related equipment footage is never presented as proof of the complete configured line.

Stage 01 · HK-30 tight-buffer formation YouTube에서 시청
This official HONGKAI recording supports fiber payoff, preheating, tight-buffer extrusion, cooling, diameter monitoring, haul-off and take-up for Stage 01 only. Any operating values visible in the recording belong to that recording and are not page ratings or guarantees.
04 프로젝트 책임

Define the GJFJV project boundary before the route is finalized.

The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

범위 상태 공학 검토 필요

아래의 모든 항목은 서면으로 확인될 때까지 포함, 제외, 구매자 공급 또는 HONGKAI- 공급으로 간주되지 않습니다.

책임 매트릭스 세 가지 책임 그룹 모두 검토

그룹을 열면 세부 정보만 표시되며, 범위가 확인되는 것은 아닙니다.

구매자 준비 구매자 책임 공학 검토를 위한 프로젝트, 제품 및 사이트 정보 4 항목

생산 라인 및 참조 장비 구성 확정 전에 HONGKAI을 검토해야 합니다.

  • Approved GJFJV cable drawing, target fiber count, tight-buffer dimensions, gathering or stranding method and finished-cable requirements 확인 예정
  • Primary-coated optical fiber, tight-buffer material and identification plan, aramid-yarn system, common-jacket material, color and marking inputs 확인 예정
  • Factory space, utilities, material flow, reel sizes, access and installation conditions 확인 예정
  • Existing equipment and interfaces to Stage 01 tight-buffer formation and the configured Stage 02 phase 확인 예정
서면 제안서에 정의됨 HONGKAI 책임 권장 구성 및 견적 공급 범위 4 항목

HONGKAI은 사용 가능한 프로젝트 입력을 검토한 후 권장 구성 및 견적 공급 범위를 정의합니다.

  • Recommended two-stage GJFJV route and reference equipment configuration stated in the written proposal 확인 예정
  • Quoted equipment list, equipment-source boundary and the proposed Stage 01 to Stage 02 interfaces 확인 예정
  • Required tooling, tension control, cooling, diameter measurement, haul-off and take-up, including whether the gathering cage is integrated or supplied as a matched unit 확인 예정
  • 제안서에 명시된 문서화, 시운전, 교육 및 사후 서비스 범위 확인 예정
함께 확인됨 공동 확인 기술 인터페이스, 수락 및 프로젝트 조정 4 항목

기술 인터페이스, 수락 및 프로젝트 조정은 양측 프로젝트 팀의 서면 확인이 필요합니다.

  • Final GJFJV cable structure, process route and equipment configuration 확인 예정
  • Factory layout, equipment interfaces, utilities and site-readiness conditions 확인 예정
  • Trial materials, sampling, FAT and acceptance criteria for tight-buffered elements and the finished GJFJV cable 확인 예정
  • Delivery timing, installation, trial production, change control and final sign-off 확인 예정

05 계획 입력

Prepare the inputs for a complete GJFJV production review.

첫 번째 공학 검토 시 논의할 계획 주제를 선택하세요. 선택은 검토 주제를 표시할 뿐, 기술적 값, 장비 수량, 재료 등급, 성능 목표 또는 공급 범위를 승인하는 것이 아닙니다.

검토할 생산 라인 계획 주제를 선택하세요
06 참조 및 검증

Review the available GJFJV production references and the evidence boundaries.

The Stage 01 image and video plus the Stage 02 panorama and related equipment video illustrate the current GJFJV reference route. They are not the approved line layout, FAT record, customer case, performance commitment, confirmed supply scope or acceptance record.

섹션 05 컨텍스트 이어짐 HK-30 tight-buffer formation → configured GJFJV / HK-50 phase for gathering, aramid application and common-jacket extrusion

아직 계획 주제가 선택되지 않았습니다. 검토 우선순위를 추가하려면 섹션 05로 돌아가세요.

Reference image of the complete HONGKAI HK-30 tight-buffer formation process line mapped to the GJFJV route
단계 01 참조
최종 배열 아님
참조 가능

HK-30 tight-buffer formation reference

Reference line for paying off primary-coated optical fiber, forming the identified tight-buffered element, then cooling, measuring, hauling off and taking up. Fiber input, tight-buffer material, dimensions, tooling, tension, identification and reel format remain project-specific.

These production-stage images and the two stage-specific videos illustrate the current GJFJV planning route only. The Stage 02 recording is related equipment footage, not exact configured-line proof. None proves the approved drawing, final layout, equipment quantity, performance, customer result, FAT, supplied scope or acceptance. Those items are defined only by the mutually approved technical and commercial documents.

단계 01 참조

HK-30 tight-buffer formation reference

1 of 2
06B GJFJV line feedback

Customer feedback published with HONGKAI's GJFJV production line.

These five-star reviews are reproduced from HONGKAI's current GJFJV production-line page. The selected comments focus on fiber-optic production-line experience and retain their published wording.

Customer photo published with Ahmed Mohamed's feedback on the HONGKAI GJFJV page
Published HONGKAI record
GJFJV page review

“I highly recommend Hongkai's fiber optic cable production line. It has helped us reduce production time and costs while maintaining the highest standards of quality. The customer service provided by Hongkai has also been exceptional.”

아메드 모하메드관리자
Customer photo published with Tariq Abdullah's feedback on the HONGKAI GJFJV page
Published HONGKAI record
GJFJV page review

“We've been using the Hongkai fiber optic cable production line for years now and it never fails to impress. It's an essential piece of equipment for our operations in Jakarta.”

타리크 압둘라작업 관리자
Customer photo published with Maria da Silva's feedback on the HONGKAI GJFJV page
Published HONGKAI record
GJFJV page review

“The quality of the fiber optic cable produced by Hongkai's production line is unmatched. It's helped us become a major player in the telecom industry here in São Paulo.”

마리아 다 실바WP 임원

Source boundary: these review excerpts and five-star displays reproduce what is currently published on HONGKAI's GJFJV page. Customer statements describe their experience; final GJFJV configuration, output, FAT, supplied scope and acceptance remain project-specific.

07 Route FAQ

Clarify the GJFJV route before requesting a proposal.

These answers connect the individually tight-buffered distribution-cable structure to the two reference stages and the inputs needed for engineering review.

GJFJV 기준 경로에는 어떤 단계가 포함되어 있습니까?

The reference route has two stages. HK-30 forms each identified tight-buffered optical-fiber element. The configured GJFJV / HK-50 phase gathers or arranges those elements as defined by the drawing, applies the common aramid system, extrudes the common outer jacket, then cools, monitors, hauls off and takes up the finished cable. The final route follows the approved drawing and written project inputs.

이 페이지는 어떤 케이블 구조를 참조로 사용합니까?

The reference is an indoor distribution construction with multiple individually tight-buffered optical fibers, one common aramid system and one common outer jacket. The product rendering is representative and does not fix fiber count, dimensions, material grades or performance.

스테이지 01의 출력은 어떻게 스테이지 02에 전달됩니까?

Reel format, tight-buffer dimensions, identification, tension and handling requirements must match the configured Stage 02 input. If the buyer already has qualified tight-buffered fibers, Stage 01 may become an upstream or existing-equipment interface. That does not automatically place Stage 01 inside the supplied scope.

구매자는 엔지니어링 검토를 위해 무엇을 제공해야 합니까?

Provide the approved drawing or sample, target fiber count, optical-fiber and input-reel data, tight-buffer dimensions, material and identification, gathering or stranding method, any applicable lay direction or pitch, aramid and jacket requirements, marking, target output, reel plan, factory utilities, existing equipment, inspection and acceptance needs, and the project schedule.

어떤 재료 및 구성 선택 사항이 프로젝트별로 달라지나요?

Fiber count, tight-buffer dimensions, material and identification, parallel gathering or a light lay or defined stranding method, cage integration or a matched unit, aramid package, jacket material, profile and color, tooling, controls, reels and inspection points all require written confirmation. This page does not select a fixed version.

What do the images and process videos prove?

The structure renders, equipment image and Stage 02 panorama support visual review only. The verified HK-30 recording supports the Stage 01 process shown in that recording. The Stage 02 breakout / distribution cable machinery recording is related equipment footage only and does not verify the exact configured GJFJV / HK-50 route. None proves the approved drawing, complete two-stage supply, final layout, speed, capacity, performance, certification, FAT or customer result, and visible recording values are not page guarantees.

How should existing equipment and factory conditions be reviewed?

Confirm whether Stage 01 already exists, whether the gathering cage is integrated or supplied as a matched unit, available space and material flow, power, cooling, air where required, reel handling and inspection interfaces. A catalog image or reference panorama is not a project layout commitment.

How are capacity, FAT, installation and service confirmed?

The written technical and commercial documents define buyer materials, the stable-operation basis, speed or output targets, sampling and instruments, FAT or site acceptance, installation, training, spare parts, service and each party's responsibility. This page assumes no default capacity or service scope.

Final cable construction, equipment, performance, acceptance criteria and supply scope are defined in the signed technical and commercial agreement.

08 투자 문의

Define the GJFJV construction and two-stage production boundary.

Share the available GJFJV drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding method, cage arrangement, aramid and common-jacket requirements, finished dimensions and marking, output and reel plan, factory conditions, inspection and acceptance basis, and project schedule. HONGKAI will review the open engineering items before preparing a project-specific proposal.

현재 페이지 컨텍스트 GJFJV · HK-30 to configured GJFJV / HK-50 phase Browser context accompanies the enquiry for routing only. It does not approve the cable construction, material, equipment, operating result or supplied scope. Planning inputs remain open · No supporting process stage carried forward

HONGKAI이 검토하는 내용

케이블 구조
Drawing or sample, target fiber count, individual tight-buffer arrangement and finished requirements
Stage 01 interface
Primary-coated fiber input, tight-buffer dimensions, material, identification and reel handoff
Gathering & cage
Parallel gathering or defined stranding method and whether the cage is integrated or matched
Aramid & jacket
Common aramid system, jacket material, profile, color, tooling, marking and finished dimensions
Capacity & reels
Product mix, shifts, target output, stable-operation basis and input and output reel formats
Factory & acceptance
Layout, utilities, existing equipment, inspection, FAT, installation and service boundary
준비할 사항 · 6 항목
  • Available GJFJV drawing, reference sample, target fiber count and finished requirements
  • Optical-fiber input, tight-buffer dimensions, material, identification and qualified-element status
  • Gathering or stranding method, fiber order, applicable lay definition and cage arrangement
  • Aramid system, common-jacket material, profile, color, tooling and marking
  • Target output, shifts, stable-operation basis and source and delivery reel formats
  • Factory conditions, existing interfaces, inspection, FAT, acceptance, installation and schedule

No complete specification yet? Share the known construction and operating conditions. Unknown values can remain open for engineering review.

The information submitted here supports a preliminary technical review. Final cable construction, equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.

GJFJV production project brief

Provide the GJFJV drawing, tight-buffer inputs, gathering method and finished-cable targets.

Add the available drawing or sample, target fiber count, optical-fiber and reel inputs, tight-buffer dimensions, material and identification, gathering or stranding and cage arrangement, aramid and common-jacket requirements, target output, factory conditions and acceptance basis.

파일을 드래그 앤 드롭하거나, 업로드할 파일 선택
고객이 사용 가능한 케이블 도면, 사양 또는 참조 문서를 업로드할 수 있도록 합니다. WPForms에서 구성된 허용 파일 유형 및 파일 크기 제한을 표시합니다.

견적을 요청하세요

우리는 24시간 이내에 당신에게 대답할 것입니다!!!