Support and unwind the donor package
The double-head motorized pay-off is the left equipment assembly. Final shaft, spool fit and unwinding direction follow the approved donor interface.
01തിരഞ്ഞെടുത്ത റീസ്പൂളിംഗ് ഉപകരണങ്ങൾ
Rewind natural-color coated optical fiber from an approved donor spool onto a removable small target spool, with automatic traverse, length metering, fiber-break detection, tension recording and winding-pitch control.
The machine prepares the wound small spool. Installation into a payout canister or housing is a separate downstream process.
Real HONGKAI equipment
02Fiber and spool interfaces
Select an interface to connect the real material or package role with the corresponding respooler function. Final dimensions, tooling and downstream fit remain project-specific.
Complete respooler
The respooler produces a removable wound spool. Complete payout-housing manufacture, outlet design, system integration and final canister assembly are separate downstream responsibilities unless expressly included in the written proposal.
03റഫറൻസ് കോൺഫിഗറേഷൻ
The supplied reference configuration lists three equipment assemblies working across five functional zones. Review the equipment list, then select a zone to check its input, output and project interface.
The reference configuration lists one set of each assembly below. These component codes identify the equipment units, not a fixed model number for the complete respooler.
2GQZDFX-00 · Quantity: 1 set
300LSQY-00 · Quantity: 1 set
ഡാൻസർ ഉപകരണം ഉൾപ്പെടെ
236DZSX-00 · Quantity: 1 set
Spool dimensions are reproduced in the source document's order. The 25 km and 50 km figures describe its reference donor packages, not guaranteed target winding lengths. Final spool fit, component selection, qualified operating speed and supply scope follow the approved drawings, written proposal and FAT agreement. The five zones below explain the functions distributed across these three assemblies.
The double-head motorized pay-off is the left equipment assembly. Final shaft, spool fit and unwinding direction follow the approved donor interface.
The listed pay-off tension-frame and PID controls regulate fiber entry and include a fiber-break alarm. Confirm the alarm response in FAT; its sensor location is not established by this photograph.
ഫൈബർ ഡാറ്റാഷീറ്റും ദാതാ-സ്പൂൾ ഡ്രോയിംഗോ ഭൗതിക സാമ്പിളോ നൽകുക.
03Bസംബന്ധിച്ച പ്രോസസ് വീഡിയോ
Watch product video on YouTube ↗
Natural coated optical fiber passes through the visible pay-off, guiding, traverse and take-up path. This process reference connects the five functional zones in Section 03, but it is not a substitute for the written configuration or project FAT record.
Equipment and motion: the machine, fiber route, guide movement and small-spool rewinding process.
Final configuration, length error, tension acceptance, winding-pitch acceptance, optical attenuation or complete canister assembly.
Use the buyer's agreed fiber and spool interfaces, then record length, tension, break response, pitch and package appearance.
The five functional zones above explain how a respooling project can be planned; they are not a contractual supply scope. Responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing. Published spool sizes and the 500 m/min value are references, not universal project compatibility or qualified operating-speed guarantees.
Opening a group only reveals its details; it does not confirm scope.
Information HONGKAI must review before fixing the respooling route, tooling and reference equipment configuration.
ലഭ്യമായ പ്രൊജക്റ്റ് ഇൻപുട്ടുകൾ അവലോകനം ചെയ്ത ശേഷം HONGKAI ശുപാർശ ചെയ്യുന്ന കോൺഫിഗറേഷനും ഉദ്ധരിച്ച സപ്ലൈ അതിർത്തിയും നിർവചിക്കുന്നു.
തകന്ന ഇന്റർഫേസുകൾ, സ്വീകരണവും പ്രോജക്ട് സമന്വയവും രണ്ട് പ്രോജക്ട് ടീമുകളിൽ നിന്നും എഴുത്തുവടിയുടെ സ്ഥിരീകരണം ആവശ്യമാണ്.
05Planning inputs
Select only the topics available now. A selection asks HONGKAI to review that topic; it does not approve a value, tooling interface, operating condition, acceptance result or supply scope.
06Reference evidence
Use the tabs to review what the published HONGKAI media actually shows at each functional stage. These views are references only, not the project FAT, final supplied configuration or an acceptance record.
No planning topics are selected yet. The media below remains a visible reference, not an approved project definition.
iThe images and official product video establish only what can be seen in the published media. Performance values, final tooling, supplied scope and acceptance results belong in the mutually approved technical agreement and FAT record.
07വാങ്ങുന്നയാളുടെ ചോദ്യങ്ങൾ
These answers define the published product boundary. Final tooling, interfaces, operating condition and acceptance criteria remain part of the written project scope.
The reference route uses five connected handling stages inside one respooling system: donor-spool pay-off, tension control, length metering and break detection, traverse and pitch control, and removable small-spool take-up. These are process stages, not five independently supplied production machines.
The confirmed input is natural-color coated optical fiber on an approved donor spool. The machine output is a removable small wound spool prepared for a separate downstream payout housing or canister operation. It does not manufacture the complete housing, outlet or UAV assembly.
The fiber leaves the donor spool, passes through the agreed tension and guide path, is metered and monitored for a break condition, then follows the coordinated traverse path onto the small target spool. Shaft, guide, fixture and package interfaces must be confirmed from drawings or physical samples.
Provide the fiber datasheet or sample, donor-spool drawing or sample, target-spool drawing or sample, target length and error method, requested tension and recording basis, winding-pitch and appearance criteria, and the intended downstream housing interface.
Final tooling, shaft and fixture interfaces, qualified operating speed, metering method, tension criteria, break response, winding pitch, package appearance and any optional control or data functions remain subject to the written proposal and FAT method. Published reference formats are not universal compatibility guarantees.
They can show the visible machine, fiber path, guide movement, spool arrangement and rewinding action. They do not prove the final project configuration, length error, tension acceptance, optical attenuation, production result or complete downstream housing assembly.
Share the usable footprint, operator and maintenance access, material flow, voltage, frequency, earthing and any retained upstream or downstream equipment. Final utility demand, installation interface and connection responsibility must be confirmed in the written project scope.
FAT should use agreed fiber and spool inputs and record the approved length, tension, break-response, pitch and package-appearance checks. Optical attenuation comparison requires separate OTDR equipment and an agreed method. Installation, training, documents, schedule and service boundaries are confirmed in the signed technical and commercial scope.
Final tooling, equipment configuration, qualified operation, acceptance criteria and supply scope are defined only in the approved written agreement.
08Investment enquiry
Send the natural coated fiber specification, donor-spool information and small target-spool drawing or sample. HONGKAI will review the handling path, tooling, winding controls and FAT boundary before defining the project configuration.
What HONGKAI will review
The shared form carries project context for review only. Final capability, tooling, commercial scope and acceptance criteria remain subject to the written HONGKAI proposal.
Provide the natural coated fiber data, donor-spool and target-spool drawings or samples, target length, winding-pitch criteria and the FAT checks you want HONGKAI to review.