01

SELECTED LAN PROCESS LINE

LAN കോർ-വയർ ഇൻസുലേഷൻ എക്സ്ട്രൂഷൻ ലൈൻ

Prepare insulated cores around the dimensions, colour system and reel format your LAN pair-twisting process actually needs.

HONGKAI core-wire extruder with a stainless-steel hopper, horizontal heating barrel and white cabinet base
LAN Core-Wire Insulation Extrusion Line. Final configuration follows the approved project. Select the image to view equipment details.

02

PROCESS ROUTE

Start with the insulated-core drawing

Prepare colour-identified insulated conductors for LAN pair twisting. Select the extrusion arrangement around the conductor, insulation compound, finished core dimensions and receiving reel.

This stage is relevant when your factory needs to produce its own insulated conductors, add core-wire capacity or replace an existing insulation line. The selection begins with the conductor and finished-core drawing. An extruder size alone leaves the pay-off, insulation layers, cooling, inspection and receiving package unresolved. Review those interfaces together so the resulting core can enter the selected pair-twisting operation without an undefined material or reel-handling step.

Incoming material

Copper conductor and approved insulation compound

Finished output

Insulated core wire ready for pair twisting

Select by

Material, layer arrangement and dimensional control

Line scope

Confirmed from the approved cable drawing and project inputs

Insulated copper conductor reference for LAN cable core-wire production
Insulated-conductor structure. The material and dimensions follow the approved core drawing.

The insulated core is the starting point for pair quality

Use the conductor and insulation drawing to define the finished core. Diameter, wall thickness and colour identification become the inputs for the next pair-twisting stage.

Follow the production process

STAGE 01

Prepare the conductor

Match the pay-off reel, tension, straightening and preheating arrangement to the incoming conductor. Conductor preparation belongs in the line specification alongside the extrusion equipment.

STAGE 02

Apply the insulation

Define solid insulation, colour identification and any stripe or additional layer. The reference LAN arrangement uses main and auxiliary extrusion; the crosshead and tooling follow the approved core drawing.

STAGE 03

Cool, check and collect

Coordinate cooling, diameter monitoring, spark inspection, haul-off and take-up. The collected core must fit the reel and handling requirements of the pair-twisting stage.

What a well-defined line gives your project

A defined core for pairing

Use the finished diameter, insulation wall and colour identification as selection inputs. This gives the pairing stage a clearly specified incoming material rather than an assumed output from the extruder.

A complete extrusion scope

Review conductor handling, extrusion, cooling and collection as one route. The proposal can then identify which tools and online instruments belong in the offered line.

An operating point tied to the product

Assess the production target with the actual compound and insulation section. This makes the working requirement meaningful for the selected core rather than a maximum-speed headline.

03

LINE EQUIPMENT

Equipment duties and configuration

Review each module by its function and the project input it needs. Use the documented arrangement as a configuration reference.

LAN cable conductor insulation line with payoff, extruder and take-up equipment
Extrusion-line arrangement. Final modules and layout are project specific.

Review the complete extrusion arrangement

Read the line from conductor handling through extrusion, cooling and collection. Confirm the reel interfaces and the online instruments with the equipment scope.

Conductor pay-off, straightening and project-selected preheating

The reference uses a 500 mm shaftless motorized pay-off, a straightening platform and an induction copper-wire preheater. Match the incoming conductor, tension and preheating duty to the approved core.

Main extruder, crosshead and insulation tooling

The documented main extruder has a 60 mm screw with L/D 26:1. Confirm the insulation compound, crosshead and tooling for the required core dimensions; screw size alone does not define finished-wire output.

Colour or stripe extrusion where specified

A separate 35 mm stripe extruder with L/D 20:1 provides the documented colour-stripe duty. Confirm the colour system and tooling; this auxiliary unit is not the complete physical-foaming system.

Compound feeding and temperature control

Specify material handling and the temperature-control arrangement for the approved compound. State any preparation requirements and responsibility for compound supply.

Cooling, diameter monitoring and agreed online inspection

The reference includes a 2.5 m warm-water trough, a 10 m fixed cooling trough, laser diameter measurement and a 15 kV high-frequency spark tester. Agree the set points and acceptance records for the actual core.

Haul-off and reel take-up matched to pair preparation

The reference uses double-wheel traction and automatic changeover take-up for 500 mm reels. Confirm the reel drawing, core winding length and interface to the selected pair-twisting pay-offs.

Configuration reference

Documented 60+35 core-wire arrangement

  • Main extruder: 60 mm screw, L/D 26:1; confirmed open-head output 60 kg/h. Auxiliary stripe extruder: 35 mm screw, L/D 20:1.
  • 500 mm motorized pay-off, conductor straightening and induction preheating.
  • 2.5 m warm-water trough plus 10 m fixed cooling; laser diameter gauge and 15 kV high-frequency spark tester.
  • Double-wheel capstan and automatic changeover take-up for 500 mm reels; PLC and HMI line control.

These are reference equipment details for the documented CAT5/CAT6 project. Compound, finished-core drawing and working output are confirmed in the selected proposal.

Choose the configuration route

Solid insulation
Begin with the conductor and finished insulation section. Confirm the compound, wall, colour identification and tooling before selecting the complete extrusion arrangement.

Additional colour or layer
Where the drawing requires a stripe or another layer, define its material and geometry. The auxiliary extrusion duty should appear explicitly in the proposal.

Physical-foaming route
If the dielectric drawing requires physical foaming, review the separate foaming process and its material and gas-control requirements. The solid-insulation reference does not define that system.

Tandem-insulation operating footage for equipment discussion. It shows a separate tandem arrangement and does not demonstrate the exact 60+35 pay-off-fed reference configuration listed above.

Watch tandem-insulation equipment in operation

Follow the conductor path through the insulation operation. Use the footage to discuss the equipment arrangement for your own core drawing.

  • Conductor feeding and material path
  • Extrusion and cooling interfaces
  • Collection and receiving-reel arrangement

04

FACTORY INPUTS

Define the line before comparing quotations

Use the same cable, material and receiving-package requirements when comparing configurations. Unknown items can remain questions for the review.

Your selection brief

Conductor and core
Provide conductor material, construction, incoming diameter and finished insulated-core dimensions.

Material and layers
State the exact insulation compound, solid or foamed route, colours, stripe requirements and layer arrangement.

Operating target
Supply the required working output, reel dimensions, changeover expectations and inspection plan for that construction.

Inputs to include

Incoming conductor

Material, construction, diameter range and pay-off reel drawing.

Finished core

Insulated outside diameter, wall requirements and dimensional tolerances.

Insulation recipe

Exact compound, colours, stripe or layer drawing and material preparation.

Working target

Required output for the specified core, product mix and changeover pattern.

Receiving package

Take-up reel dimensions and the pair-twisting pay-off interface.

Inspection basis

Online checks, sample measurements and the acceptance records required.

05

SUPPLY SCOPE & QUALITY

Agree supply scope and acceptance

Put the selected equipment, plant interfaces and product-specific checks into the written proposal.

ACCEPTANCE CHECKPOINTS

Checks to agree

  • Agree dimensional tolerances and the checks required for the insulated core.
  • Match cooling and reel handling to the next pair-twisting operation.
  • Define finished-cable electrical acceptance separately from online insulation inspection.

SUPPLY BOUNDARY

സ്ഥിരീകരിക്കുന്നതിനുള്ള പരിധി

The proposal should identify the extrusion equipment, conductor handling, cooling, haul-off, take-up, tooling and online instruments. Water, electrical interfaces and consumables belong in the agreed installation and supply scope.

Define the acceptance sequence

Trial basis

Agree the conductor, compound, tooling and representative core to use for the trial.

Line and product checks

Review core dimensions, colour or layer construction, cooling and the selected online checks at the agreed operating point.

Records and transfer

Record the sample results and receiving package; define finished-cable electrical acceptance in the complete cable project.

07

REFERENCE PRICING

Plan your equipment budget

Review the EXW reference price for the named configuration, then request a quotation against your cable drawing, output target and required supply scope.

HK-60+35 core-wire insulation line

USD 43,000

Per reference line

EXW. Taxes excluded.

Confirm your quotation scope

60 mm main extrusion with 35 mm stripe extrusion for the documented core-wire route.

Prices are in USD on an EXW basis and exclude taxes. They apply to the named reference configurations. Final price and validity depend on the agreed equipment, tooling, auxiliaries and project requirements.

Confirm the supply boundary and delivery arrangements in the quotation.

08

CUSTOMER FEEDBACK

Good value, with one project team

Feedback from Devang Shah on HONGKAI’s LAN cable equipment and one-stop project service for Channeltech Systems in India.

5 / 5
امتیاز 5 از 5

Devang Shah

Channeltech Systems
ഇന്ത്യ

1 customer review
LAN cable equipment project

Equipment value and project support

HONGKAI’s LAN cable production equipment offers good value for money. The service is good, and the one-stop solution saved time for our project.

English summary of customer feedback.

09

QUESTIONS BEFORE SELECTION

Questions before selecting the line

Clarify configuration choices, material duties and process boundaries before turning a reference arrangement into an equipment order.

This stage insulates individual conductors before pair twisting. The outer-jacket line receives an assembled cable core later in the route.

Select the route from the approved dielectric construction and compound. A physical-foaming line has additional material and gas-control requirements.

Send the conductor and insulated-core drawing, compound specification, colour and layer requirements, target output and reel format.

Use the existing pairing pay-off and reel drawings as inputs. Confirm the insulated-core dimensions, tension and receiving package as part of the interface review.

It identifies the main and auxiliary extruders in the documented arrangement. It does not establish a universal core range, production speed or complete supply scope.

Specify the conductor and compound, representative core, working operating point, measurement method and records. Agree the included online instruments separately from finished-cable testing.

10

PROJECT ENQUIRY

Request a line configuration

LAN കോർ-വയർ ഇൻസുലേഷൻ എക്സ്ട്രൂഷൻ ലൈൻ

In the requirements field, include the conductor size, finished-core drawing, compound, colour or stripe arrangement, target output and take-up reel. If an item is undecided, identify it as a topic for review.

Use the review to agree

  • The equipment arrangement and selected configuration route.
  • Incoming material, receiving package and plant interfaces.
  • The working target, supplied instruments and acceptance basis.

Send the information you already have. Mark undecided requirements for discussion rather than guessing a specification.

Send your project requirements

ഉദ്ധരണി ചോദിക്കുക

24 മണിക്കൂറിനുള്ളിൽ ഞങ്ങൾ നിങ്ങൾക്ക് മറുപടി നൽകും!!!

WhatsApp