01
SELECTED LAN PROCESS LINE
خط عزل الأسلاك الأساسية لشبكة LAN
Prepare insulated cores around the dimensions, colour system and reel format your LAN pair-twisting process actually needs.
02
PROCESS ROUTE
Start with the insulated-core drawing
Prepare colour-identified insulated conductors for LAN pair twisting. Select the extrusion arrangement around the conductor, insulation compound, finished core dimensions and receiving reel.
This stage is relevant when your factory needs to produce its own insulated conductors, add core-wire capacity or replace an existing insulation line. The selection begins with the conductor and finished-core drawing. An extruder size alone leaves the pay-off, insulation layers, cooling, inspection and receiving package unresolved. Review those interfaces together so the resulting core can enter the selected pair-twisting operation without an undefined material or reel-handling step.
Incoming material
Copper conductor and approved insulation compound
Finished output
Insulated core wire ready for pair twisting
Select by
Material, layer arrangement and dimensional control
Line scope
تم التأكيد من الرسم المعتمد للكابل ومدخلات المشروع
The insulated core is the starting point for pair quality
Use the conductor and insulation drawing to define the finished core. Diameter, wall thickness and colour identification become the inputs for the next pair-twisting stage.
اتبع عملية الإنتاج
STAGE 01
Prepare the conductor
Match the pay-off reel, tension, straightening and preheating arrangement to the incoming conductor. Conductor preparation belongs in the line specification alongside the extrusion equipment.
STAGE 02
Apply the insulation
Define solid insulation, colour identification and any stripe or additional layer. The reference LAN arrangement uses main and auxiliary extrusion; the crosshead and tooling follow the approved core drawing.
STAGE 03
Cool, check and collect
Coordinate cooling, diameter monitoring, spark inspection, haul-off and take-up. The collected core must fit the reel and handling requirements of the pair-twisting stage.
What a well-defined line gives your project
A defined core for pairing
Use the finished diameter, insulation wall and colour identification as selection inputs. This gives the pairing stage a clearly specified incoming material rather than an assumed output from the extruder.
A complete extrusion scope
Review conductor handling, extrusion, cooling and collection as one route. The proposal can then identify which tools and online instruments belong in the offered line.
An operating point tied to the product
Assess the production target with the actual compound and insulation section. This makes the working requirement meaningful for the selected core rather than a maximum-speed headline.
03
LINE EQUIPMENT
Equipment duties and configuration
Review each module by its function and the project input it needs. Use the documented arrangement as a configuration reference.
Review the complete extrusion arrangement
Read the line from conductor handling through extrusion, cooling and collection. Confirm the reel interfaces and the online instruments with the equipment scope.
Conductor pay-off, straightening and project-selected preheating
The reference uses a 500 mm shaftless motorized pay-off, a straightening platform and an induction copper-wire preheater. Match the incoming conductor, tension and preheating duty to the approved core.
Main extruder, crosshead and insulation tooling
The documented main extruder has a 60 mm screw with L/D 26:1. Confirm the insulation compound, crosshead and tooling for the required core dimensions; screw size alone does not define finished-wire output.
البثق الملون أو الشريطي عند التحديد
A separate 35 mm stripe extruder with L/D 20:1 provides the documented colour-stripe duty. Confirm the colour system and tooling; this auxiliary unit is not the complete physical-foaming system.
Compound feeding and temperature control
Specify material handling and the temperature-control arrangement for the approved compound. State any preparation requirements and responsibility for compound supply.
Cooling, diameter monitoring and agreed online inspection
The reference includes a 2.5 m warm-water trough, a 10 m fixed cooling trough, laser diameter measurement and a 15 kV high-frequency spark tester. Agree the set points and acceptance records for the actual core.
Haul-off and reel take-up matched to pair preparation
The reference uses double-wheel traction and automatic changeover take-up for 500 mm reels. Confirm the reel drawing, core winding length and interface to the selected pair-twisting pay-offs.
Configuration reference
Documented 60+35 core-wire arrangement
- Main extruder: 60 mm screw, L/D 26:1; confirmed open-head output 60 kg/h. Auxiliary stripe extruder: 35 mm screw, L/D 20:1.
- 500 mm motorized pay-off, conductor straightening and induction preheating.
- 2.5 m warm-water trough plus 10 m fixed cooling; laser diameter gauge and 15 kV high-frequency spark tester.
- Double-wheel capstan and automatic changeover take-up for 500 mm reels; PLC and HMI line control.
These are reference equipment details for the documented CAT5/CAT6 project. Compound, finished-core drawing and working output are confirmed in the selected proposal.
اختر مسار التكوين
Solid insulation
Begin with the conductor and finished insulation section. Confirm the compound, wall, colour identification and tooling before selecting the complete extrusion arrangement.
Additional colour or layer
Where the drawing requires a stripe or another layer, define its material and geometry. The auxiliary extrusion duty should appear explicitly in the proposal.
Physical-foaming route
If the dielectric drawing requires physical foaming, review the separate foaming process and its material and gas-control requirements. The solid-insulation reference does not define that system.
Tandem-insulation operating footage for equipment discussion. It shows a separate tandem arrangement and does not demonstrate the exact 60+35 pay-off-fed reference configuration listed above.
Watch tandem-insulation equipment in operation
Follow the conductor path through the insulation operation. Use the footage to discuss the equipment arrangement for your own core drawing.
- Conductor feeding and material path
- Extrusion and cooling interfaces
- Collection and receiving-reel arrangement
04
FACTORY INPUTS
Define the line before comparing quotations
Use the same cable, material and receiving-package requirements when comparing configurations. Unknown items can remain questions for the review.
Your selection brief
Conductor and core
Provide conductor material, construction, incoming diameter and finished insulated-core dimensions.
Material and layers
State the exact insulation compound, solid or foamed route, colours, stripe requirements and layer arrangement.
Operating target
Supply the required working output, reel dimensions, changeover expectations and inspection plan for that construction.
Inputs to include
Incoming conductor
Material, construction, diameter range and pay-off reel drawing.
Finished core
Insulated outside diameter, wall requirements and dimensional tolerances.
Insulation recipe
Exact compound, colours, stripe or layer drawing and material preparation.
Working target
Required output for the specified core, product mix and changeover pattern.
Receiving package
Take-up reel dimensions and the pair-twisting pay-off interface.
Inspection basis
Online checks, sample measurements and the acceptance records required.
05
SUPPLY SCOPE & QUALITY
Agree supply scope and acceptance
Put the selected equipment, plant interfaces and product-specific checks into the written proposal.
ACCEPTANCE CHECKPOINTS
Checks to agree
- Agree dimensional tolerances and the checks required for the insulated core.
- Match cooling and reel handling to the next pair-twisting operation.
- Define finished-cable electrical acceptance separately from online insulation inspection.
SUPPLY BOUNDARY
النطاق للتأكيد
The proposal should identify the extrusion equipment, conductor handling, cooling, haul-off, take-up, tooling and online instruments. Water, electrical interfaces and consumables belong in the agreed installation and supply scope.
تحديد تسلسل القبول
Trial basis
Agree the conductor, compound, tooling and representative core to use for the trial.
Line and product checks
Review core dimensions, colour or layer construction, cooling and the selected online checks at the agreed operating point.
Records and transfer
Record the sample results and receiving package; define finished-cable electrical acceptance in the complete cable project.
06
RELATED ROUTES
Connect the upstream and downstream stages
Review the material and receiving packages on both sides of this line, then compare the complete LAN cable route.
Incoming operation
Incoming copper conductor is prepared for extrusion; confirm which preparation operations are included.
Next operation
Finished insulated cores are supplied to the selected pair-twisting route.
Interface to confirm
Agree the core drawing and receiving reel with the downstream pairing equipment before closing the line scope.
07
REFERENCE PRICING
Plan your equipment budget
Review the EXW reference price for the named configuration, then request a quotation against your cable drawing, output target and required supply scope.
HK-60+35 core-wire insulation line
USD 43,000
Per reference line
EXW. Taxes excluded.
Confirm your quotation scope
60 mm main extrusion with 35 mm stripe extrusion for the documented core-wire route.
Prices are in USD on an EXW basis and exclude taxes. They apply to the named reference configurations. Final price and validity depend on the agreed equipment, tooling, auxiliaries and project requirements.
Confirm the supply boundary and delivery arrangements in the quotation.
08
CUSTOMER FEEDBACK
Good value, with one project team
Feedback from Devang Shah on HONGKAI’s LAN cable equipment and one-stop project service for Channeltech Systems in India.
Devang Shah
Channeltech Systems
الهند
1 customer review
LAN cable equipment project
Equipment value and project support
HONGKAI’s LAN cable production equipment offers good value for money. The service is good, and the one-stop solution saved time for our project.
English summary of customer feedback.
09
QUESTIONS BEFORE SELECTION
Questions before selecting the line
Clarify configuration choices, material duties and process boundaries before turning a reference arrangement into an equipment order.
This stage insulates individual conductors before pair twisting. The outer-jacket line receives an assembled cable core later in the route.
Select the route from the approved dielectric construction and compound. A physical-foaming line has additional material and gas-control requirements.
Send the conductor and insulated-core drawing, compound specification, colour and layer requirements, target output and reel format.
Use the existing pairing pay-off and reel drawings as inputs. Confirm the insulated-core dimensions, tension and receiving package as part of the interface review.
It identifies the main and auxiliary extruders in the documented arrangement. It does not establish a universal core range, production speed or complete supply scope.
Specify the conductor and compound, representative core, working operating point, measurement method and records. Agree the included online instruments separately from finished-cable testing.
10
PROJECT ENQUIRY
Request a line configuration
خط عزل الأسلاك الأساسية لشبكة LAN
In the requirements field, include the conductor size, finished-core drawing, compound, colour or stripe arrangement, target output and take-up reel. If an item is undecided, identify it as a topic for review.
Use the review to agree
- The equipment arrangement and selected configuration route.
- Incoming material, receiving package and plant interfaces.
- The working target, supplied instruments and acceptance basis.
Send the information you already have. Mark undecided requirements for discussion rather than guessing a specification.





