Reference line render · Final arrangement pending
PRODUCTION DETAILS BELOW
Review the HK-30 process and equipment modules
HK-30 ടൈറ്റ് ബഫേർഡ് പ്രൊഡക്ഷൻ ലൈൻ
HK-30 reference line · Final arrangement confirmed per project
ഈ ഉൽപ്പാദന ലൈൻ എന്താണ് ചെയ്യുന്നത്? The HK-30 applies a project-approved LSZH, PVC or TPEE tight-buffer layer around bare optical fiber. Its reference route coordinates fiber payoff, preheating, extrusion, controlled cooling, diameter monitoring, traction and take-up in one connected production line. Final material, dimensions, speed and equipment arrangement follow the approved product drawing and project requirements.
- ലൈൻ മോഡൽ
- HK-30
- നിയന്ത്രണ വ്യവസ്ഥ
- IPC + PLC Control
- പ്രധാന പ്രക്രിയ
- Bare-fiber payoff → tight-buffer extrusion → cooling, measuring & take-up
- Reference product
- Single tight-buffered optical fiber · LSZH, PVC or TPEE · project confirmation required
Reference line render · Final arrangement pending
PRODUCTION DETAILS BELOW
Review the HK-30 process and equipment modules
Open the tight-buffered optical fiber and trace each layer to production.
Start with the assembled structure, open the rendered 3D exploded view, then select the fiber core or tight-buffer layer to see the HK-30 process and equipment it affects.
01Complete cross-section
ഒപ്റ്റിക്കൽ ഫൈബർ എക്സ്ട്രൂഷന് നടത്തുന്നതിനായി ഒരുക്കുക
ബഫർ കോമ്പൗണ്ട് പുരട്ടുന്നതിന് മുമ്പ്, നിയന്ത്രിത ടെൻഷനിൽ സ്ഥിരീകരിച്ച ബേർ ഒപ്റ്റിക്കൽ ഫൈബർ അവതരിപ്പിക്കുകയും അതിനെ പ്രീഹീറ്റ് ചെയ്യുകയും വേണം.
Fiber payoff and preheating
The selected layer is mapped to the relevant modules in the reference HK-30 tight-buffered production route.
Review the HK-30 equipment used at each tight-buffered-fiber stage.
One HK-30 line completes the reference tight-buffered optical fiber route. The cable layer selected above opens its primary equipment here, while the remaining modules stay available for route review.
One HK-30 line completes the product.
The full-line image shows the connected route. The explorer below focuses on the individual equipment that handles the selected optical-fiber core or tight-buffer layer.
Reference crop from the complete HK-30 line image; final equipment arrangement follows the approved project.
രണ്ട്-ഹെഡ് ഫൈബർ പേയോഫ് റഫറൻസ് ചെയ്യുക
Presents the project-confirmed bare optical fiber to the HK-30 route under controlled tension before preheating and buffer extrusion.
- Supports process
- Stage 01 · Fiber payoff
- Receives
- വാങ്ങുന്നയാൾ സ്ഥിരീകരിച്ച ബേർ ഒപ്റ്റിക്കൽ ഫൈബർ
- Hands off to
- ഫൈബർ പ്രീഹീറ്ററും എക്സ്ട്രൂഷൻ ക്രോസ്ഹെഡും
- Confirm before proposal
- ഫൈബർ ഫോർമാറ്റ്, റീൽ വലിപ്പം, ടെൻഷൻ ശ്രേണി, കൂടാതെ സജീവ പേയോഫ് പൊസിഷനുകൾ
Reference two-head fiber payoff selected.
See the tight-buffered optical fiber production process in operation.
This official HONGKAI video shows the connected HK-30 reference process, from controlled optical-fiber payoff and preheating through buffer extrusion, cooling, monitoring, traction and take-up. It helps buyers understand how the optical fiber core and tight-buffer layer move through one coordinated production route.
Define the HK-30 tight-buffer project boundary before the line is finalized.
The HK-30 route above is a reference configuration for one tight-buffered optical fiber production line, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
Opening a group only reveals its details; it does not confirm scope.
01 Buyer prepares Buyer responsibility Project, product ഒരുതൊടരിയ്ക്കൽഉപകരണമാണ് ഇത്സ്ഥാപിക്കുന്നത്ഇതിൽഒരുഇന്ഫർമേഷൻ ഉണ്ട്അതിന്റെപ്രവർത്തനമുറയെകുറിപ്പിടുന്നതാങ്കിൽമാറ്റിമോഡിഫൈച്ചേണ്ടഅത്ആണ്എന്നാൽഇത്ഒരുഫോർമുലേഷൻആണ്അതിനാൽഇത് ഒരുഎന്ജിനിയറിംഗപ്രക്രിയയാണ്അതിന്റെപ്രധാനഉദ്ദേശ്യംഎന്നാൽഇത്ഒരുപുനഃക്രമീകരണപ്രക്രിയയാണ്അതിനാൽ ഒരുമാറ്റംനടത്തുന്നുതാങ്കിൽഇത്ഒരുപുതിയതിരിച്ചുള്ളിട്ടു. 4 items
ഉത്പാദന റൂട്ട് നിശ്ചയിക്കുന്നതിനും റഫറൻസ് ഉപകരണ കോൺഫിഗറേഷൻ തയ്യാറാക്കുന്നതിനും മുമ്പ് HONGKAI അവലോകനം ചെയ്യേണ്ട വിവരങ്ങൾ.
- Approved tight-buffered optical fiber specification and target product range സ്ഥിരീകരിക്കേണ്ടത്
- Bare-fiber type, coating diameter, reel format and supply condition സ്ഥിരീകരിക്കേണ്ടത്
- Buffer material family, finished diameter, tolerance and color requirements സ്ഥിരീകരിക്കേണ്ടത്
- Target output, packaging format, utilities and available factory layout സ്ഥിരീകരിക്കേണ്ടത്
02 എഴുത്ത് രൂപത്തിലുള്ള നിർദ്ദേശത്തിൽ നിർവചിച്ചിരിക്കുന്നു HONGKAI ഉത്തരവാദിത്തം Recommended configuration and quoted supply boundary 4 items
ലഭ്യമായ പ്രൊജക്റ്റ് ഇൻപുട്ടുകൾ അവലോകനം ചെയ്ത ശേഷം HONGKAI ശുപാർശ ചെയ്യുന്ന കോൺഫിഗറേഷനും ഉദ്ധരിച്ച സപ്ലൈ അതിർത്തിയും നിർവചിക്കുന്നു.
- Recommended HK-30 route and reference equipment configuration സ്ഥിരീകരിക്കേണ്ടത്
- ഉദ്ധരിച്ച ഉപകരണ ലിസ്റ്റും ഉപകരണ-സ്രോതസ്സ് അതിർത്തിയും സ്ഥിരീകരിക്കേണ്ടത്
- Tooling, process-control and utility-interface proposal സ്ഥിരീകരിക്കേണ്ടത്
- Installation, commissioning, training and after-sales scope stated in writing സ്ഥിരീകരിക്കേണ്ടത്
03 ഒന്നിച്ച് സ്ഥിരീകരിച്ചു ഒരുമിച്ചുള്ള സ്ഥിരീകരണം Technical interfaces, acceptance and project coordination 4 items
തകന്ന ഇന്റർഫേസുകൾ, സ്വീകരണവും പ്രോജക്ട് സമന്വയവും രണ്ട് പ്രോജക്ട് ടീമുകളിൽ നിന്നും എഴുത്തുവടിയുടെ സ്ഥിരീകരണം ആവശ്യമാണ്.
- അന്തിമ പ്രക്രിയാ മാർഗവും ഉപകരണ കോൺഫിഗറേഷനും സ്ഥിരീകരിക്കേണ്ടത്
- Material and tooling compatibility and trial requirements സ്ഥിരീകരിക്കേണ്ടത്
- FAT, acceptance criteria and project documentation സ്ഥിരീകരിക്കേണ്ടത്
- Delivery schedule, site readiness and project coordination സ്ഥിരീകരിക്കേണ്ടത്
Confirm the inputs needed to configure the HK-30 tight-buffered line.
ആദ്യ എഞ്ചിനീയറിംഗ് റിവ്യൂവിൽ ചർച്ച ചെയ്യാൻ തയ്യാറായ പ്ലാനിംഗ് വിഷയങ്ങൾ തിരഞ്ഞെടുക്കുക. ഒരു തിരഞ്ഞെടുപ്പ് ഒരു റിവ്യൂ വിഷയം മാത്രം സൂചിപ്പിക്കുന്നു; ഇത് ഒരു തകന്ന മൂല്യം, ഉപകരണ എണ്ണം, മെറ്റീരിയൽ ഗ്രേഡ്, പ്രകടന ലക്ഷ്യം അല്ലെങ്കിൽ സപ്ലൈ സ്കോപ്പ് അനുമതിക്കുന്നില്ല.
Review the HK-30 evidence — and the decisions that remain open.
Use the tight-buffered optical-fiber structure, complete HK-30 line view and structure-mapped equipment to verify the one-line production route. These references do not represent a final equipment list, layout, performance commitment, FAT result or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
Tight-buffered optical-fiber construction reference
Reference view of the bare optical fiber and applied tight-buffer layer. Final bare-fiber specification, buffer compound, finished diameter and tolerance require the approved product drawing.
These references explain one HK-30 production route from bare-fiber payoff and preheating through buffer extrusion, downstream handling, monitoring and take-up. Final equipment quantity, sequence, dimensions, utilities, supply, performance and acceptance are defined only by the mutually approved technical agreement.
Customer perspectives on the HK-30 Tight Buffered Production Line.
Feedback focuses on the fiber route, buffer material, finished diameter, connected equipment, workshop planning and the information needed to review the production-line scope.
Clarify the HK-30 route before requesting a proposal.
These answers explain what the tight-buffered optical-fiber line produces, which modules may change, and what still requires project confirmation.
HK-30 ലൈൻ എന്ത് ഉൽപ്പന്നമാണ് ഉത്പാദിപ്പിക്കുന്നത്?
The HK-30 reference route converts a confirmed bare optical fiber into tight-buffered optical fiber by applying the approved buffer compound. It is not, by itself, a finished multi-fiber cable production route. Final buffer material, color, outside diameter and tolerance follow the approved product drawing.
ഒരു HK-30 ലൈൻ ടൈറ്റ്-ബഫറഡ് ഓപ്റ്റിക്കൽ ഫൈബർ പൂർത്തിയാക്കാമോ?
The connected reference route coordinates fiber pay-off and conditioning, compound preparation and loading, buffer extrusion, post-extrusion guiding and cooling, in-line monitoring, traction and take-up. Exact module quantities, active positions and arrangement remain project-specific.
ഏത് ബഫർ സാമഗ്രികൾ റഫറൻസ് ലൈൻ പ്രോസസ് ചെയ്യാം?
LSZH, PVC and TPEE are shown as possible reference material families, not as automatically approved compounds. Resin grade, drying and processing window, color masterbatch, adhesion, stripping behaviour and target dimensions must be validated for the selected product.
ഫൈബർ അല്ലെങ്കിൽ ബഫർ സ്പെസിഫിക്കേഷൻ മാറുമ്പോൾ ഏത് ഉപകരണങ്ങൾ മാറും?
Pay-off and tension control, preheating, material feed, crosshead and tooling, guide and cooling route, diameter monitoring, capstan settings, take-up and reel arrangement may require review. The equipment explorer explains these relationships; it is not a universal equipment list.
യന്ത്രത്തിന്റെ ചിത്രങ്ങളും വീഡിയോകളും അന്തിമമായി നൽകുന്ന കോണ്ഫിഗറേഷൻ ആണോ?
No. They are reference evidence used to explain the process and the role of individual modules. Final equipment quantities, arrangement, controls, utilities, safeguards, interfaces and acceptance criteria are confirmed only in the approved project-specific proposal or agreement.
ലൈൻ വേഗതയും കഴിവും ഉറപ്പാക്കാൻ എന്ത് വിവരങ്ങൾ ആവശ്യമാണ്?
Please provide fiber type and coating, input diameter, target buffer outside diameter and tolerance, material and color requirements, target output or stable line speed, reel dimensions, available utilities, factory layout and planned schedule. This page does not assume a guaranteed capacity.
ഒരു പൂർത്തിയാക്കിയ ടൈറ്റ്-ബഫറഡ് ഫൈബർ പിന്നീടുള്ള കേബിൾ പ്രക്രിയയ്ക്ക് പ്രവേശിപ്പിക്കാമോ?
Yes, when the approved finished-cable drawing uses tight-buffered optical fibers. Bundling, strength-member application, jacketing or other downstream cable-making processes are separate project stages and are not included in the HK-30 reference scope unless they are agreed in writing.
FAT, സ്ഥാപനം, കമ്മീഷനുചെയ്യൽ എന്നിവ ഉൾപ്പെടുന്നുവോ?
Inspection points, FAT requirements, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Their exact content must be defined in the approved technical proposal and commercial agreement.
Final product construction, performance, equipment, acceptance criteria and supply scope are defined only in the mutually approved technical and commercial agreement.
Plan your tight-buffered optical fiber production project.
Share the bare-fiber type, buffer material, finished diameter, color, planned output, take-up format and factory conditions. HONGKAI will review the HK-30 process route, equipment scope, system interfaces and open technical items before preparing a project-specific proposal.
What HONGKAI will review
- Target cable plan
- Bare-fiber type, buffer compound, finished diameter, color and tolerances
- പ്രക്രിയാ വഴി
- Fiber payoff, preheating, buffer extrusion, cooling, inspection, traction and take-up
- Capacity target
- Product mix, expected output, stable line speed and take-up format
- ഫാക്ടറി സാഹചര്യങ്ങൾ
- Available space, utilities, existing equipment and testing needs
- Project stage
- ആസൂത്രണം, ബജറ്റ് തയ്യാറാക്കൽ, ഫാക്ടറി തയ്യാറെടുപ്പ് അല്ലെങ്കിൽ ഉൽപ്പാദന വികസനം
- Review status
- Preliminary assessment · Technical confirmation required
What to prepare · 6 items
- Target tight-buffered optical-fiber types, reference samples or available drawings
- Bare-fiber details, coating condition and input-package requirements
- Buffer compound, finished diameter, color, tolerance and test requirements
- Target output, product mix and expected stable line speed
- Take-up reel sizes, winding requirements and packaging format
- Utilities, factory layout, existing equipment, acceptance criteria and timeline
No complete specification yet? Share the available fiber, target diameter and current assumptions. Unconfirmed items can remain “To be confirmed”.
The information submitted here supports a preliminary technical review. Final equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Fiber Optic Cable Production Project Brief
Tell us your planned cable products, target capacity and current investment stage. Partial information is welcome, and you may upload a cable drawing when available.
