Panorama tahap akhir · Seluruh rangkaian peralatan ditampilkan tanpa pemotongan
FOUR-STAGE ROUTE BELOW
Tinjau setiap proses dan peralatannya
Lintasan Produksi Kabel Mikro
HK-90 jalur pelindung kabel optik · Seluruh rangkaian peralatan tetap terlihat
Apa yang dihasilkan rute produksi ini? This reference solution follows a four-stage route for compact Micro Cable used in microduct and dense-access projects. HK-235 prepares the colored fibers, HK-50 forms the jelly-filled PBT loose tubes, HK-800/12 strands the specified tubes around the central member, and HK-90 integrates the confirmed water-blocking package before extruding the PE sheath. Final construction follows the approved cable drawing.
- Rute produksi
- HK-235 → HK-50 → HK-800/12 SZ → HK-90 Micro Cable
- Pendekatan kontrol
- Kontrol terkoordinasi ditinjau untuk setiap tahap produksi
- Proses utama
- Fiber preparation · jelly-filled PBT loose-tube extrusion · SZ stranding · water-blocking integration · PE sheathing
- Rentang kabel yang sesuai
- Compact stranded loose-tube Micro Cable · microduct and dense-access applications · final design confirmed per project
Panorama tahap akhir · Seluruh rangkaian peralatan ditampilkan tanpa pemotongan
FOUR-STAGE ROUTE BELOW
Tinjau setiap proses dan peralatannya
Read the compact stranded loose-tube cable from the inside out.
Open the exploded view, select a visible component, and see which of the four production stages prepares, forms or integrates it into the finished Micro Cable.
01
Referensi terpasang
Four stages form the reference Micro Cable.
Pilih lapisan di atas untuk menyoroti tahap yang menyiapkan, membentuk, atau mengintegrasikannya.
Tinjau konfigurasi produksi untuk lapisan kabel yang dipilih.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete four-stage Micro Cable reference route.
HK-235
Pewarnaan dan penggulungan ulang serat optik
Terapkan warna identifikasi yang disetujui, sembuhkan lapisan, dan gulung kembali setiap serat di bawah ketegangan terkendali sebelum ekstrusi tabung longgar.
- Input
- Serat optik alami + urutan warna yang disetujui
- Output
- Serat berwarna yang diidentifikasi dan digulung kembali
- Posisi rute
- Tahap 01 · Identifikasi dan persiapan serat
Warna, penyembuhan, dan rewind setiap serat
Create identifiable, tension-controlled fiber packages for the HK-50 loose-tube stage.
Urutan warna, kualitas lapisan, dan ketegangan winding
Kendalikan urutan identifikasi, keseragaman lapisan, penyembuhan, kecepatan garis, ketegangan, dan pembentukan gulungan.
Jenis serat, rencana warna, dan paket gulungan
Konfirmasi spesifikasi serat, jumlah, urutan warna, gulungan pasokan, dan paket jadi yang diperlukan.
Machine quantity, performance, auxiliary systems and final arrangement are configured from the approved Micro Cable drawing, production target and plant conditions.
Watch SZ stranding build the compact Micro Cable core.
This HONGKAI process video provides a practical reference for the HK-800/12 SZ cable-core stranding stage. It connects qualified loose tubes from HK-50 with the bound stranded core required before final PE outer sheathing on HK-90.
Define the Micro Cable project boundary before the route is finalized.
Rute empat tahap di atas adalah konfigurasi referensi, bukan cakupan pasokan kontraktual. Tanggung jawab pembeli, HONGKAI, dan bersama menjadi final hanya dalam proposal teknis atau perjanjian yang disetujui.
Tidak ada yang di bawah ini dianggap termasuk, dikeluarkan, disediakan pembeli, atau disediakan HONGKAI- sampai dikonfirmasi secara tertulis.
Membuka grup hanya menampilkan detailnya; tidak mengonfirmasi lingkup.
01 Pembeli menyiapkan Tanggung jawab pembeli Informasi proyek, produk, dan lokasi untuk tinjauan teknis 4 items
Informasi HONGKAI harus ditinjau sebelum menetapkan rute produksi dan konfigurasi peralatan referensi.
- Micro Cable drawing, fiber count and finished-cable requirements Untuk dikonfirmasi
- Fiber, PBT, filling compound, central member, water-blocking and PE material inputs Untuk dikonfirmasi
- Ruang pabrik, utilitas, akses, dan kondisi pemasangan Untuk dikonfirmasi
- Peralatan dan antarmuka yang ada di seluruh tahap pewarnaan, tabung longgar, SZ, dan pelapisan Untuk dikonfirmasi
02 Didefinisikan dalam proposal tertulis Tanggung jawab HONGKAI Konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip 4 items
HONGKAI menentukan konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip setelah meninjau input proyek yang tersedia.
- Rute empat tahap yang direkomendasikan dan konfigurasi peralatan referensi Untuk dikonfirmasi
- Daftar peralatan yang dikutip dan batasan sumber peralatan Untuk dikonfirmasi
- Antarmuka yang diperlukan antara HK-235, HK-50, HK-800/12, SZ, dan HK-90 Untuk dikonfirmasi
- Lingkup dokumentasi, commissioning, pelatihan, dan pascapenjualan yang dinyatakan dalam proposal Untuk dikonfirmasi
03 Dikonfirmasi bersama Konfirmasi bersama Antarmuka teknis, penerimaan, dan koordinasi proyek 4 items
Antarmuka teknis, penerimaan, dan koordinasi proyek memerlukan konfirmasi tertulis dari kedua tim proyek.
- Final Micro Cable process route and equipment configuration Untuk dikonfirmasi
- Tata letak, pembagian antarmuka, dan kondisi kesiapan lokasi Untuk dikonfirmasi
- Acceptance criteria for each stage and finished Micro Cable Untuk dikonfirmasi
- Jadwal pengiriman, pemasangan, uji coba, perubahan, dan penandatanganan akhir Untuk dikonfirmasi
Prepare the inputs for a complete Micro Cable production review.
Pilih topik perencanaan yang siap Anda diskusikan selama tinjauan teknis pertama. Pemilihan menandai topik tinjauan saja; tidak mengesahkan nilai teknis, jumlah peralatan, grade bahan, target kinerja, atau lingkup pasokan.
Review the available Micro Cable production references and what still needs confirmation.
These images illustrate the HK-235, HK-50, HK-800/12 SZ and HK-90 stages mapped to the current Micro Cable route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-235 fiber coloring and rewinding reference
Peralatan referensi untuk pewarnaan dan pemutaran ulang serat optik sebelum ekstrusi tabung longgar. Jumlah serat akhir, urutan warna, jumlah unit, antarmuka pelepasan, dan persyaratan operasional tetap spesifik proyek.
These production-stage images illustrate the current four-stage Micro Cable planning route only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
Customer perspectives on the four-stage Micro Cable production route.
The feedback focuses on compact stranded loose-tube construction, SZ cable-core control, water-blocking integration and final PE sheathing. HK-235 → HK-50 → HK-800/12 SZ → HK-90
For the Micro Cable Production Line, the four-stage route made the project easier to review. We could follow fiber coloring, PBT loose-tube extrusion, SZ cable-core formation and final PE sheathing as one connected process.
The HK-800/12 SZ stage made tube count, fillers, central-member alignment, SZ pitch, binders and water-blocking materials easier to review before the cable core entered final PE sheathing.
The planning boundary kept fiber and tube counts, central-member material, jacket dimensions, tooling, reel sizes, utilities and acceptance conditions visible throughout the final Micro Cable configuration review.
Names, roles and photos follow existing HONGKAI customer records. The Micro Cable-specific wording summarizes technical project-review priorities and is not presented as a verified product-specific quotation.
Clarify the Micro Cable route before requesting a proposal.
These answers connect the compact SZ-stranded loose-tube construction to the four-stage reference route and the inputs needed for engineering review.
Apa tahapan yang termasuk dalam rute produksi referensi Micro Cable?
The reference route has four stages: HK-235 fiber coloring and rewinding, HK-50 jelly-filled PBT loose-tube extrusion, HK-800/12 SZ cable-core stranding with the approved binding and water-blocking package, and HK-90 final PE outer sheathing. The final configuration must follow the approved cable drawing and written project inputs.
What kabele konstruksi inion is this route intended to produce?
It is a reference route for compact SZ-stranded loose-tube Micro Cable. The mapped structure includes colored optical fibers, jelly-filled PBT loose tubes, a central strength member, an approved water-blocking package and a PE outer sheath. Fiber count, tube count, materials and dimensions remain project-specific.
Apa yang diserahkan antara keempat tahap produksi?
HK-235 supplies identified and rewound colored fibers to HK-50. HK-50 produces qualified jelly-filled loose-tube packages for HK-800/12 SZ. The SZ stage forms the bound, water-blocked stranded cable core, which then enters HK-90 for PE extrusion, cooling, dimensional monitoring, marking and finished-cable take-up.
Which cable and material details must be confirmed before the proposal?
Confirm the approved cable drawing, fiber count and color plan, tube and filler arrangement, loose-tube geometry, central-member material and size, PBT and filling-compound grades, binder and water-blocking construction, PE grade, finished dimensions, marking and reel formats. These inputs determine the stage interfaces and final equipment scope.
Is FRP or one water-blocking material mandatory for every design?
No single material should be assumed from the reference page. The central member may use project-specified FRP or another approved material, while the water-blocking package may use approved tape, yarn or another specified construction. The cable drawing and material specification control the final choice.
Do the reference images and video confirm speed or line arrangement?
No. They illustrate the process and shared equipment only. They do not confirm final reel quantities, tube arrangement, SZ pitch or reversal length, line speed, machine quantity, factory layout, supplied scope, performance or acceptance criteria for a specific project.
Can existing factory equipment be connected to this four-stage route?
Existing upstream or downstream equipment can be reviewed, but compatibility is not assumed. HONGKAI must review equipment interfaces, factory space, material flow, voltage, frequency, compressed air, cooling water, access and installation conditions before defining the interface and supply boundary in writing.
How are output, inspection and acceptance requirements established?
No default capacity is assumed. The project review should confirm the target product mix, operating schedule, required output, source and delivery reel formats, stable operating conditions, inspection and sampling points, FAT or other acceptance criteria, and site-readiness requirements. Binding values belong in the approved technical agreement.
Konstruksi kabel akhir, peralatan, kinerja, kriteria penerimaan, dan cakupan pasokan ditentukan dalam perjanjian teknis dan komersial yang ditandatangani.
Plan your Micro Cable production project.
Share the approved cable drawing, fiber and loose-tube counts, color plan, tube and filler arrangement, loose-tube geometry, central-member specification, PBT and filling-compound grades, binder and water-blocking construction, PE grade, finished dimensions, output and reel plan, and factory conditions. HONGKAI will review the four-stage route, equipment interfaces and open technical items before preparing a project-specific proposal.
Apa yang akan ditinjau HONGKAI
- Rencana produk target
- Micro Cable constructions, fiber and tube counts, dimensions and material requirements
- Rute proses
- HK-235, HK-50, HK-800/12 SZ and HK-90 inputs, outputs and interfaces
- Target kapasitas
- Campuran produk, output yang diharapkan, dan kecepatan garis target
- Kondisi pabrik
- Ruang tersedia, utilitas, peralatan yang ada, dan kebutuhan pengujian
- Tahap proyek
- Perencanaan, penganggaran, persiapan pabrik, atau ekspansi produksi
- Status tinjauan
- Penilaian awal · Diperlukan konfirmasi teknis
Apa yang perlu disiapkan · item 6
- Approved Micro Cable drawing, reference sample or target requirements
- Fiber count, color plan, loose-tube and filler arrangement
- Central member, PBT, filling compound, binder, water-blocking and PE requirements
- Target product mix, output, reel formats and expected operating conditions
- Existing equipment, material flow and available factory layout
- Utilities, inspection, acceptance needs and planned project timeline
Belum ada spesifikasi lengkap? Bagikan produk target dan asumsi saat ini Anda. Nilai yang tidak diketahui dapat dijelaskan sebagai input teknis terbuka.
Informasi yang diserahkan di sini mendukung tinjauan teknis awal. Konfigurasi peralatan akhir, kinerja, harga, jadwal pengiriman, dan cakupan pasokan hanya dikonfirmasi dalam proposal atau perjanjian yang disetujui.
Ringkasan Proyek Produksi Kabel Serat Optik
Katakan kepada kami produk kabel yang direncanakan, kapasitas target, dan tahap investasi saat ini. Informasi sebagian pun diterima, dan Anda dapat mengunggah gambar kabel bila tersedia.
