Panorama tahap akhir · Seluruh rangkaian peralatan ditampilkan tanpa pemotongan
FOUR-STAGE ROUTE BELOW
Tinjau setiap proses dan peralatannya
GYXTC8S Jalur Produksi Kabel
HK-90 jalur pelindung kabel optik · Seluruh rangkaian peralatan tetap terlihat
Apa yang dihasilkan rute produksi ini? This reference solution follows a four-stage route for GYXTC8S figure-8 self-supporting aerial cable. HK-235 colors and rewinds the fibers, HK-50 forms the jelly-filled PBT loose tubes, HK-800/12 strands those tubes around the confirmed central member, and HK-90 applies the steel-tape armor, positions the messenger and extrudes the joined black PE figure-8 sheath. Final construction follows the approved cable drawing.
- Rute produksi
- HK-235 → HK-50 → HK-800/12 SZ → HK-90 GYXTC8S
- Pendekatan kontrol
- Kontrol terkoordinasi ditinjau untuk setiap tahap produksi
- Proses utama
- Pewarnaan serat · Ekstrusi tabung longgar PBT · Pelintiran SZ · Pembentukan pita baja · Pelindung figure-8 PE
- Rentang kabel yang sesuai
- Kabel udara inti terpilin GYXTC8S · kabel penopang baja terpilin · desain akhir dikonfirmasi sesuai proyek
Panorama tahap akhir · Seluruh rangkaian peralatan ditampilkan tanpa pemotongan
FOUR-STAGE ROUTE BELOW
Tinjau setiap proses dan peralatannya
Baca kabel GYXTC8S dari dalam ke luar.
Buka tampilan terurai, pilih komponen, dan lihat tahap produksi mana dari empat tahap yang menyiapkan, membentuk, atau mengintegrasikannya ke dalam kabel udara mandiri figure-8 yang selesai.
01
Referensi terpasang
Four stages form the reference GYXTC8S cable.
Pilih lapisan di atas untuk menyoroti tahap yang menyiapkan, membentuk, atau mengintegrasikannya.
Tinjau konfigurasi produksi untuk lapisan kabel yang dipilih.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete four-stage GYXTC8S reference route.
HK-235
Pewarnaan dan penggulungan ulang serat optik
Apply the approved identification colors, cure the coating and rewind each fiber under controlled tension before loose-tube extrusion.
- Input
- Natural optical fibers + approved color sequence
- Output
- Identified and rewound colored fibers
- Posisi rute
- Stage 01 · Fiber identification and preparation
Color, cure and rewind each fiber
Create an identifiable, tension-controlled fiber package for the HK-50 loose-tube stage.
Color order, coating quality and winding tension
Control identification sequence, coating uniformity, curing, line speed, tension and reel build.
Fiber type, color plan and reel package
Confirm fiber specification, count, color sequence, supply reel and required finished package.
Machine quantity, performance, auxiliary systems and final arrangement are configured from the GYXTC8S construction, production target and plant conditions.
Tonton tahap pelintiran SZ membangun inti kabel GYXTC8S.
Video proses HONGKAI ini memberikan referensi praktis untuk tahap pelintiran inti kabel HK-800/12 SZ. Video ini menghubungkan tabung longgar yang telah selesai dari HK-50 dengan inti kabel terikat yang diperlukan sebelum pelapisan pita baja bergelombang dan pelapisan figure-8 pada HK-90.
Tentukan batas proyek GYXTC8S sebelum rute difinalisasi.
Rute empat tahap di atas adalah konfigurasi referensi, bukan cakupan pasokan kontraktual. Tanggung jawab pembeli, HONGKAI, dan bersama menjadi final hanya dalam proposal teknis atau perjanjian yang disetujui.
Tidak ada yang di bawah ini dianggap termasuk, dikeluarkan, disediakan pembeli, atau disediakan HONGKAI- sampai dikonfirmasi secara tertulis.
Membuka grup hanya menampilkan detailnya; tidak mengonfirmasi lingkup.
01 Pembeli menyiapkan Tanggung jawab pembeli Informasi proyek, produk, dan lokasi untuk tinjauan teknis 4 items
Informasi HONGKAI harus ditinjau sebelum menetapkan rute produksi dan konfigurasi peralatan referensi.
- Gambar kabel GYXTC8S, jumlah serat, dan persyaratan kabel jadi Untuk dikonfirmasi
- Masukan bahan serat, PBT, senyawa pengisi, anggota pusat, armor, messenger, dan PE Untuk dikonfirmasi
- Ruang pabrik, utilitas, akses, dan kondisi pemasangan Untuk dikonfirmasi
- Peralatan dan antarmuka yang ada di seluruh tahap pewarnaan, tabung longgar, SZ, dan pelapisan Untuk dikonfirmasi
02 Didefinisikan dalam proposal tertulis Tanggung jawab HONGKAI Konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip 4 items
HONGKAI menentukan konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip setelah meninjau input proyek yang tersedia.
- Rute empat tahap yang direkomendasikan dan konfigurasi peralatan referensi Untuk dikonfirmasi
- Daftar peralatan yang dikutip dan batasan sumber peralatan Untuk dikonfirmasi
- Antarmuka yang diperlukan antara HK-235, HK-50, HK-800/12, SZ, dan HK-90 Untuk dikonfirmasi
- Lingkup dokumentasi, commissioning, pelatihan, dan pascapenjualan yang dinyatakan dalam proposal Untuk dikonfirmasi
03 Dikonfirmasi bersama Konfirmasi bersama Antarmuka teknis, penerimaan, dan koordinasi proyek 4 items
Antarmuka teknis, penerimaan, dan koordinasi proyek memerlukan konfirmasi tertulis dari kedua tim proyek.
- Rute proses dan konfigurasi peralatan GYXTC8S akhir Untuk dikonfirmasi
- Tata letak, pembagian antarmuka, dan kondisi kesiapan lokasi Untuk dikonfirmasi
- Acceptance criteria for each stage and finished GYXTC8S cable Untuk dikonfirmasi
- Jadwal pengiriman, pemasangan, uji coba, perubahan, dan penandatanganan akhir Untuk dikonfirmasi
Prepare the inputs for a complete GYXTC8S production review.
Pilih topik perencanaan yang siap Anda diskusikan selama tinjauan teknis pertama. Pemilihan menandai topik tinjauan saja; tidak mengesahkan nilai teknis, jumlah peralatan, grade bahan, target kinerja, atau lingkup pasokan.
Review the available GYXTC8S references and what still needs confirmation.
These images illustrate the HK-235, HK-50, HK-800/12 SZ and HK-90 stages mapped to the current GYXTC8S route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-235 fiber coloring and rewinding reference
Reference equipment for coloring and rewinding optical fibers before loose-tube extrusion. Final fiber count, color sequence, number of units, payoff interfaces and operating requirements remain project-specific.
Gambar-gambar tahap produksi ini hanya menggambarkan arah perencanaan empat tahap saat ini. Jumlah, urutan, dimensi, pasokan, kinerja, dan penerimaan peralatan akhir ditentukan hanya oleh perjanjian teknis yang disetujui bersama.
Customer perspectives on the four-stage GYXTC8S production route.
The feedback focuses on process visibility, SZ cable-core control and the final armored figure-8 package. HK-235 → HK-50 → HK-800/12 SZ → HK-90
The four-stage route made our GYXTC8S review easier. We could follow coloring, loose-tube extrusion, SZ cable-core formation and final figure-8 sheathing as one connected process.
The HK-800/12 SZ stage made tube count, fillers, lay parameters, binders and water blocking easier to review before armoring and figure-8 sheathing.
The clear boundary between the reference route and final scope kept messenger geometry, steel tape, tooling, reels, utilities and workshop layout visible throughout the project review.
Names, roles and photos follow existing HONGKAI customer records. The GYXTC8S-specific wording summarizes the technical priorities represented in these project-review perspectives.
Jelaskan rute sebelum meminta penawaran.
These answers define the GYXTC8S reference route, what the supplied images can demonstrate, and what still requires project confirmation.
Konstruksi kabel GYXTC8S apa yang menjadi dasar rute referensi ini?
The reference construction uses colored optical fibers inside jelly-filled PBT loose tubes, SZ stranded around the specified central strength member with fillers and water blocking. The core is then protected by corrugated steel tape and completed with a messenger wire inside the figure-8 PE sheath. Fiber count, dimensions and material grades follow the approved cable drawing.
Apakah tahap persiapan serat HK-235 selalu diperlukan?
Tidak selalu. Jika serat berwarna yang memenuhi syarat disediakan dalam paket yang dibutuhkan dan siap untuk produksi tabung longgar, lingkup proyek yang ditinjau dapat dimulai di HK-50. Jika diperlukan pewarnaan, pemutaran ulang, atau persiapan paket, tahap referensi HK-235 harus dievaluasi bersama spesifikasi input serat.
Mengapa halaman menampilkan empat tahap produksi?
HK-235 prepares the fibers, HK-50 forms the jelly-filled PBT loose tubes, HK-800/12 SZ builds the cable core, and HK-90 forms the corrugated steel-tape armor before messenger positioning and figure-8 PE sheathing. The four stages keep each material handoff visible while preserving one connected GYXTC8S production route.
Apakah HK-235, HK-50, HK-800/12 SZ dan HK-90 adalah konfigurasi peralatan akhir?
Tidak. Mereka adalah model tahap produksi referensi yang digunakan untuk menjelaskan rute proses. Jumlah modul akhir, dimensi, kontrol, utilitas, sistem opsional, dan antarmuka peralatan dikonfirmasi hanya setelah meninjau gambar kabel, material, target kapasitas, dan kondisi pabrik.
Apakah peralatan yang sudah ada atau bahan yang disediakan pembeli dapat diintegrasikan?
Berpotensi, tergantung pada tinjauan teknis. HONGKAI harus mengonfirmasi ukuran paket material, rentang tegangan, antarmuka jalur, sinyal kontrol, dimensi, utilitas, kondisi operasi, dan tes yang diperlukan sebelum peralatan yang ada atau material yang disediakan pembeli dimasukkan ke dalam rute yang diusulkan.
Informasi apa yang diperlukan untuk mengonfirmasi kecepatan lini dan kapasitas produksi?
Silakan berikan gambar kabel atau spesifikasi, jumlah serat, diameter selesai, material yang diperlukan, campuran produk, output target, kecepatan operasi yang diharapkan, ukuran gulungan, pola shift, utilitas yang tersedia, tata letak pabrik, dan jadwal proyek. Halaman referensi ini tidak mengasumsikan kapasitas proyek standar.
Apakah gambar mesin dan video proses adalah peralatan yang akhirnya disuplai?
No. The images illustrate the HK-235, HK-50, HK-800/12 SZ and HK-90 reference stages. The related video demonstrates the SZ stranding process only. It does not represent the complete four-stage project route, the final equipment arrangement, a production result or an acceptance record.
Apakah inspeksi, FAT, instalasi, dan pelatihan termasuk?
Titik inspeksi, persyaratan FAT, kriteria penerimaan, dokumentasi, instalasi, commissioning, pelatihan, perjalanan, dan tanggung jawab di lokasi adalah item lingkup proyek. Konten pastinya harus didefinisikan dalam proposal teknis dan perjanjian komersial yang disetujui bersama.
Final cable construction, performance, equipment, acceptance criteria and supply scope are defined only in the mutually approved technical and commercial agreement.
Plan your GYXTC8S cable production project.
Share the cable drawing, tube count, SZ cable-core arrangement, armor and messenger requirements, planned capacity and factory conditions. HONGKAI will review the four-stage route, equipment interfaces and open technical items before preparing a project-specific proposal.
Apa yang akan ditinjau HONGKAI
- Target product plan
- Cable families, constructions, fiber counts and material requirements
- Rute proses
- Starting materials, required processes and equipment interfaces
- Capacity target
- Product mix, expected output and target line speed
- Kondisi pabrik
- Available space, utilities, existing equipment and testing needs
- Project stage
- Planning, budgeting, factory preparation or production expansion
- Review status
- Penilaian awal · Diperlukan konfirmasi teknis
Apa yang perlu disiapkan · item 6
- Jenis kabel target, sampel referensi, atau gambar yang tersedia
- Jumlah serat, struktur kabel, dan persyaratan material
- Bahan awal dan proses produksi yang diperlukan
- Target output, product mix atau kecepatan lini yang diharapkan
- Peralatan yang ada, ukuran reel, dan tata letak pabrik yang tersedia
- Utilitas, persyaratan pengujian, dan jadwal proyek yang direncanakan
No complete specification yet? Share your target products and current assumptions. Unknown values can be described as open engineering inputs.
Informasi yang diserahkan di sini mendukung tinjauan teknis awal. Konfigurasi peralatan akhir, kinerja, harga, jadwal pengiriman, dan cakupan pasokan hanya dikonfirmasi dalam proposal atau perjanjian yang disetujui.
Ringkasan Proyek Produksi Kabel Serat Optik
Katakan kepada kami produk kabel yang direncanakan, kapasitas target, dan tahap investasi saat ini. Informasi sebagian pun diterima, dan Anda dapat mengunggah gambar kabel bila tersedia.
