ASU Cable Production Line for Central Loose-Tube Aerial Cable
ASU production-line panorama · Complete route remains visible
این مسیر تولید چه محصولی تولید میکند؟ This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.
- مسیر تولید
- HK-50 → HK-90 ASU
- روش کنترل
- کنترلهای هماهنگشده برای هر مرحله تولید بررسی شدهاند
- فرآیندهای اصلی
- PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
- محدوده کابل مناسب
- ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
Complete-line panorama · Equipment route shown without cropping
TWO-STAGE ROUTE BELOW
بررسی هر فرآیند و تجهیزات مربوطه
Read the ASU cable from the inside out.
Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.
01
مجموعه مرجع
Two core stages form the reference ASU cable.
لایهای را در بالا انتخاب کنید تا مرحلهای که آن را آماده، شکل میدهد یا ادغام میکند، برجسته شود.
پیکربندی تولید را برای لایه کابل انتخابشده بررسی کنید.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.
HK-50
PBT loose-tube production
Combine colored fibers, filling compound and PBT material into the required central loose tube.
- ورودی
- Approved colored optical fibers + filling compound + PBT
- خروجی
- Jelly-filled PBT loose tube
- موقعیت مسیر
- Stage 01 · Central loose-tube formation
Form the jelly-filled PBT loose tube
Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.
Fiber feeding · jelly filling · PBT extrusion
This stage forms the single loose tube used at the center of the reference ASU construction.
Fiber count, tube geometry and material system
Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.
تعداد، ابعاد، عملکرد، سیستمهای کمکی و ترتیب نهایی ماشینآلات بر اساس ساختار کابل و نیازمندیهای پروژه تأیید میشوند.
See the ASU-specific downstream production line in operation.
This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.
Define the ASU project boundary before the route is finalized.
The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
Opening a group only reveals its details; it does not confirm scope.
01 خریدار آماده میکند مسولیت خریدار اطلاعات پروژه، محصول و سایت برای بررسی مهندسی 4 موارد
اطلاعات HONGKAI باید قبل از تعیین مسیر تولید و پیکربندی تجهیزات مرجع بررسی شوند.
- طراحی کابل هدف و الزامات محصول برای بررسی در حال تأیید
- مواد اولیه، درجات و فرمهای تأمین در حال تأیید
- فضای کارخانه، امکانات، دسترسی و شرایط نصب در حال تأیید
- اطلاعات تجهیزات موجود و رابطهای پیشرو و پسرو در حال تأیید
02 در پیشنهاد نوشتهشده تعریف شده مسئولیت HONGKAI پیکربندی توصیهشده و مرز تأمین ارائهشده 4 موارد
HONGKAI پیکربندی توصیهشده و مرز تأمین ارائهشده را پس از بررسی ورودیهای موجود پروژه تعریف میکند.
- مسیر تولید توصیهشده و پیکربندی تجهیزات مرجع در حال تأیید
- لیست تجهیزات ارائهشده و مرز منبع تجهیزات در حال تأیید
- رابطهای مورد نیاز برای تجهیزات ارائهشده در حال تأیید
- دامنه اسناد، راهاندازی، آموزش و پس از فروش ذکرشده در پیشنهاد در حال تأیید
03 تأیید همزمان تأیید مشترک رابطهای فنی، پذیرش و هماهنگی پروژه 4 موارد
رابطهای فنی، پذیرش و هماهنگی پروژه نیازمند تأیید نوشتهشده از طرف هر دو تیم پروژه هستند.
- مسیر فرآیند نهایی و پیکربندی تجهیزات در حال تأیید
- طرح کلی، تقسیم رابط و شرایط آمادگی سایت در حال تأیید
- معیارهای پذیرش، شرایط آزمون و روش نمونهبرداری در حال تأیید
- برنامه تحویل، نصب، آزمایش، تغییرات و تأیید نهایی در حال تأیید
Identify the inputs needed to review the ASU production route.
موضوعات برنامهریزی را که آماده بحث در اولین بازبینی مهندسی هستید، انتخاب کنید. انتخاب یک موضوع، تنها به عنوان یک موضوع بازبینی محسوب میشود؛ این انتخاب تأییدی بر ارزش فنی، تعداد تجهیزات، درجه مواد، هدف عملکردی یا محدوده تأمین نیست.
Review the available ASU references and what still needs confirmation.
These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
هیچ موضوع برنامهریزیای انتخاب نشده است. به بخش 05 بازگردید تا اولویتهای بررسی را اضافه کنید.
HK-50 PBT loose-tube line reference
Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.
These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
What Brazil customers value in an ASU project discussion.
Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU
قبل از درخواست پیشنهاد، مسیر را روشن کنید.
These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.
این مسیر مرجع بر اساس ساختار کابل ASU چیست؟
The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.
آیا مسیر دو مرحلهای فیبر نوری رنگی پیشتر را فرض میکند؟
Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.
چرا صفحه دو مرحله تولید اصلی را نشان میدهد؟
HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.
آیا HK-50 و HK-90 ASU پیکربندی نهایی تجهیزات هستند؟
خیر. اینها مدلهای مرجع مرحله تولید هستند که برای توضیح مسیر فرآیند استفاده میشوند. مقادیر نهایی ماژولها، ابعاد، کنترلها، امکانات، سیستمها و رابطهای تجهیزات اختیاری فقط پس از بررسی کشیدگی کابل، مواد، هدف ظرفیت و شرایط کارخانه تأیید میشوند.
آیا میتوان تجهیزات موجود یا مواد ارائهشده توسط خریدار را ادغام کرد؟
در صورت امکان، مشروط به بررسی فنی. HONGKAI باید اندازههای بستهبندی مواد، محدودههای کشش، رابطهای خط، سیگنالهای کنترل، ابعاد، امکانات، شرایط کاری و آزمونهای مورد نیاز را قبل از ادغام تجهیزات موجود یا مواد تأمینشده توسط خریدار در مسیر پیشنهادی تأیید کند.
چه اطلاعاتی برای تأیید سرعت خط و ظرفیت تولید مورد نیاز است؟
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.
آیا تصاویر ماشین و ویدئوی فرآیند، تجهیزات نهایی تأمینشده هستند؟
No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.
آیا بازرسی، FAT، نصب و آموزش شامل میشوند؟
Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.
ساختار نهایی کابل، عملکرد، تجهیزات، معیارهای پذیرش و محدوده تأمین فقط در توافق فنی و تجاری متقابل تأیید شده تعریف میشوند.
سرمایهگذاری در تولید کابل فیبر نوری را برنامهریزی کنید.
خانوادههای کابل هدف، ظرفیت برنامهریزیشده، شرایط کارخانه و مرحله فعلی پروژه خود را به اشتراک بگذارید. HONGKAI مسیر فرآیند، محدوده تجهیزات، رابطهای سیستم و موارد فنی باز را قبل از آمادهسازی پیشنهادی خاص پروژه بررسی خواهد کرد.
HONGKAI چه چیزی را بررسی خواهد کرد؟
- برنامه محصول هدف
- خانوادههای کابل، ساختارها، تعداد الیاف و نیازمندیهای مواد
- مسیر فرآیند
- مواد اولیه، فرآیندهای مورد نیاز و رابطهای تجهیزات
- هدف ظرفیت
- ترکیب محصول، خروجی مورد انتظار و سرعت خط هدف
- شرایط کارخانه
- فضای موجود، امکانات، تجهیزات موجود و نیازهای آزمایش
- مرحله پروژه
- برنامهریزی، بودجهبندی، آمادهسازی کارخانه یا گسترش تولید
- وضعیت بررسی
- ارزیابی اولیه · نیاز به تأیید فنی
چه چیزی را آماده کنیم · 6 موارد
- انواع کابل هدف، نمونههای رفرنس یا طرحهای موجود
- تعداد فیبرها، ساختارهای کابل و نیازمندیهای مواد
- مواد اولیه و فرآیندهای تولید مورد نیاز
- خروجی هدف، ترکیب محصول یا سرعت خط مورد انتظار
- تجهیزات موجود، اندازه رولها و طرح فضای کارخانه موجود
- امکانات، نیازهای آزمون و زمانبندی برنامهریزی شده پروژه
هنوز مشخصات کاملی ندارید؟ محصولات هدف و فرضیات فعلی خود را به اشتراک بگذارید. موارد تأییدنشده میتوانند به صورت “در انتظار تأیید” باقی بمانند.
The information submitted here supports a preliminary technical review. Final equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Fiber Optic Cable Production Project Brief
Tell us your planned cable products, target capacity and current investment stage. Partial information is welcome, and you may upload a cable drawing when available.