01

SELECTED LAN PROCESS LINE

LAN 케이블 외장 압출 라인

선택된 외부 재킷을 케이블 심선, 화합물, 벽 및 완성된 패키지와 연결된 장비 범위에 적용하십시오.

HONGKAI 케이블 피복 라인(가이드 풀리, 제어 캐비닛 및 릴 처리 장비 포함)
LAN 케이블 외장 압출 라인. 최종 구성은 승인된 프로젝트에 따릅니다. 장비 세부 정보를 보려면 이미지를 선택하십시오.

02

PROCESS ROUTE

유입 코어 주변의 재킷 시스템을 선택하십시오

Apply the specified jacket to the assembled LAN cable core. Match the extrusion system, cooling, haul-off, inspection and reel handling to the incoming core, jacket compound and finished cable dimensions.

This stage receives the prepared LAN cable core and applies the specified outer jacket. Review it when adding jacket production, changing a cable construction or replacing a sheathing arrangement. The required wall and finished outside diameter connect the material duty to the extrusion, cooling and haul-off selection. Marking, online inspection and take-up also need a defined scope. A screw diameter or material name alone does not establish the working cable speed or the finished-cable acceptance basis.

Incoming material

승인된 케이블 심선 및 승인된 재킷 화합물

Finished output

테스트 및 포장용 재킷형 LAN 케이블

Select by

재킷 재질, 벽 두께 및 완료된 직경

Line scope

승인된 케이블 도면 및 프로젝트 입력에서 확인됨

보호용 외부 피복이 있는 완성된 LAN 케이블
재킷 케이블 구조. 케이블 구성 및 재킷 치수는 승인된 도면에 따릅니다.

조립된 코어를 재킷 케이블로 변환하십시오

Review the relationship between the incoming core and the finished outer jacket. The selected compound, wall thickness, finished diameter and marking requirements drive the sheathing arrangement.

생산 공정을 따르십시오

STAGE 01

준비된 케이블 코어를 공급하십시오

Review the core diameter, shielding layers and incoming drum. Set the pay-off and handling arrangement around the actual core construction.

STAGE 02

Extrude the outer jacket

Specify the compound, wall thickness and finished outside diameter. Select screw, crosshead and tooling for that processing duty rather than from a cable-category label alone.

STAGE 03

Cool, inspect and take up

Coordinate cooling, haul-off and take-up with the agreed marking and online checks. Release the finished cable to its specified electrical and packaging operations.

What a well-defined line gives your project

A product-based extrusion duty

Use the jacket section and actual compound to assess the working target. This connects the production requirement to a defined finished cable.

A complete downstream scope

Identify cooling, haul-off, marking, online checks and take-up in the proposal. Each operation can then be reviewed as equipment rather than an assumed accessory.

An acceptance plan for the cable

Separate jacket dimensions and appearance from the finished cable electrical and fire-test requirements. The project can define both without treating the extruder model as a certification.

03

LINE EQUIPMENT

Equipment duties and configuration

Review each module by its function and the project input it needs. Use the documented arrangement as a configuration reference.

HONGKAI LAN cable outer-sheathing extrusion line arrangement reference
Sheathing-line arrangement. Final equipment and workshop layout are confirmed for the project.

Review the line beyond the extruder

Match the core pay-off, extrusion system, cooling path, haul-off and take-up as one route. Add printing and online inspection to the agreed scope where required.

Cable-core pay-off and guiding

Feed the assembled cable core from the specified drum. Review core guides, incoming shield layers and handling through the extrusion entry.

Compound feeding and drying where required

Confirm the actual jacket compound and its material-preparation requirements. Identify any feeding or drying equipment included for the selected processing duty.

Main extruder, temperature controls, crosshead and tooling

Apply the jacket through the selected crosshead and tooling. Match screw, temperature-control duties and tooling to the compound and jacket section.

Cooling and water-handling arrangement

Define the cooling arrangement and the plant water interfaces. Include the required water-handling responsibility and space in the line layout review.

인출 장치, 길이 계측 및 합의된 온라인 검사

Coordinate haul-off, length counting and selected online instruments. Agree which inspection functions are provided and how their results are checked.

프린터 지원 및 완제품 케이블 권취

The listed reference supplies a printer support frame, not the printing machine. Specify any required printer separately. The dual-shaft take-up accepts 400-800 mm reels; confirm its interface to the selected packaging route.

Configuration reference

Documented HK-80 outer-sheath arrangement

  • 80 mm screw, L/D 26:1; 30 kW main drive; extrusion output 150 kg/h under open-head conditions. Confirmed reference-line speed: 100 m/min.
  • 630-800 mm magnetic-powder pay-off, core guides, 50 kg dryer/loader and PLC line controls.
  • 1.5 m movable warm-water trough, 8 m fixed cooling and 600 mm double-wheel capstan.
  • Horizontal tension accumulator, spark testing and meter counting; dual-shaft take-up for 400-800 mm reels.
  • 프린터 지지 프레임이 명시되어 있으나, 인쇄기는 해당 참조 범위에 포함되지 않습니다.

오픈헤드 생산량은 완성 케이블 속도가 아닙니다. 선택된 기술 제안서에서 재킷 컴파운드, 벽 두께, 냉각 조건 및 가동 생산량을 확인하십시오.

구성 경로 선택

Compound and tooling selection
Start from the exact jacket compound, core and finished dimensions. Review screw, crosshead, tooling and material preparation for that duty.

Marking and online inspection
Select the printer and inspection functions explicitly. A printing stand, mounting provision or generic control description does not identify the supplied instruments.

Receiving and packaging route
Choose the take-up package to fit the factory handling and the next coiling or delivery operation. Define whether package preparation is a separate stage.

HONGKAI HK-80 control-cable sheathing operating reference. LAN-cable materials, tooling and scope are selected separately.

Watch sheathing equipment in operation

Observe an operating sheathing arrangement and use it to discuss the material path and operator interfaces. This footage shows control-cable equipment; the LAN jacket scope is selected for your construction.

  • Incoming-core handling
  • Extrusion and downstream line coordination
  • Receiving equipment and operator access

04

FACTORY INPUTS

Define the line before comparing quotations

Use the same cable, material and receiving-package requirements when comparing configurations. Unknown items can remain questions for the review.

Your selection brief

Incoming cable core
Provide core diameter, core construction, shield details and incoming drum dimensions.

Jacket specification
Supply the exact compound, required wall thickness, finished diameter, colour and marking requirements.

Acceptance and handling
Define fire-test requirements, online checks, output target, take-up reels and the downstream package format.

Inputs to include

Incoming core

Outside diameter, structure, shielding layers and pay-off drum.

Jacket section

Wall, finished outside diameter, tolerances and colour.

Material specification

Exact compound and its required preparation conditions.

Production duty

Working output for the defined cable and product-changeover expectations.

Marking and inspection

Print content, actual printer and selected online checks.

Receiving and acceptance

Take-up drum, packaging route and cable test requirements.

05

SUPPLY SCOPE & QUALITY

Agree supply scope and acceptance

Put the selected equipment, plant interfaces and product-specific checks into the written proposal.

ACCEPTANCE CHECKPOINTS

Checks to agree

  • Agree the jacket dimensional and surface checks for the selected compound.
  • Specify the online inspection, marking and length-control equipment to include.
  • Confirm finished-cable electrical and fire-test acceptance separately from the extrusion configuration.

SUPPLY BOUNDARY

확인할 범위

List the marking machine separately from its stand or mounting provision. Confirm the actual printing equipment, cooling utilities, take-up arrangement and testing functions included in the proposal.

Define the acceptance sequence

Trial basis

Agree the representative cable core, exact compound, jacket section and trial tooling.

Line and product checks

Review finished dimensions, surface condition, marking and selected online checks at the agreed operating point.

Records and transfer

Record the take-up and length-control results and identify the separate finished-cable electrical and fire-test acceptance basis.

07

REFERENCE PRICING

Plan your equipment budget

Review the EXW reference price for the named configuration, then request a quotation against your cable drawing, output target and required supply scope.

HK-80 outer-sheathing configuration

USD 53,500

Per reference line

EXW. Taxes excluded.

Confirm your quotation scope

The documented 80 mm outer-jacket extrusion arrangement.

Prices are in USD on an EXW basis and exclude taxes. They apply to the named reference configurations. Final price and validity depend on the agreed equipment, tooling, auxiliaries and project requirements.

Confirm the supply boundary and delivery arrangements in the quotation.

08

CUSTOMER FEEDBACK

Good value, with one project team

Feedback from Devang Shah on HONGKAI’s LAN cable equipment and one-stop project service for Channeltech Systems in India.

5 / 5
정격된 전류 5 이상을 벗어 5

Devang Shah

Channeltech Systems
인도

1 customer review
LAN cable equipment project

Equipment value and project support

HONGKAI’s LAN cable production equipment offers good value for money. The service is good, and the one-stop solution saved time for our project.

English summary of customer feedback.

09

QUESTIONS BEFORE SELECTION

Questions before selecting the line

Clarify configuration choices, material duties and process boundaries before turning a reference arrangement into an equipment order.

Mass output and cable line speed are different quantities. The jacket cross-section, compound and complete line arrangement are needed to establish a working production point.

The selected proposal must identify the printer itself. A printing stand or mounting provision is not the same supply item.

Confirm the required classification and finished-cable test basis. The material and process must be assessed within the specified cable construction.

It specifies an 80 mm screw with L/D 26:1 and an open-head extrusion reference of 150 kg/h. The finished cable speed must be confirmed for the compound, jacket section and complete downstream line; it cannot be derived directly from that mass-output figure.

Review the electrical and cooling-water interfaces, material preparation, installation layout and receiving reels. State which equipment and utilities are supplied by each party.

Provide each intended compound and cable section, the product mix and changeover requirements. Confirm the scope and working basis for those products in the technical proposal.

10

PROJECT ENQUIRY

Request a line configuration

LAN 케이블 외장 압출 라인

Provide the incoming-core drawing, jacket compound, wall and finished diameter, output target, marking requirements and drum drawings. Identify the required cable tests and downstream package format.

Use the review to agree

  • The equipment arrangement and selected configuration route.
  • Incoming material, receiving package and plant interfaces.
  • The working target, supplied instruments and acceptance basis.

Send the information you already have. Mark undecided requirements for discussion rather than guessing a specification.

Send your project requirements

견적을 요청하세요

우리는 24시간 이내에 당신에게 대답할 것입니다!!!

왓츠앱