Review the stranding head together with tube tension, line speed and binding.
خط تولید رشتهبندی SZ
هستههای کابل لولهشل · پرداخت به هسته نهایی برای پیچش
Bring loose tubes and the specified central member together in a controlled SZ-stranded core. Match tube handling, reversal, binding and water blocking to the cable drawing, then coordinate traction and take-up for the next production stage.
- INPUT
- Qualified loose tubes, central member and specified filling / binding materials
- OUTPUT
- Stranded and bound cable core on the agreed package
- CORE PROCESS
- Pay off → SZ strand → bind / water block → pull → take up
- CONFIGURATION BASIS
- Tube count, product dimensions, pitch, tension and factory interfaces
Scope boundary: this line forms the cable core. Loose-tube extrusion, final armoring, aramid reinforcement and jacket extrusion are separate stages unless specifically included in the written scope.
From separate loose tubes to one coordinated cable core.
Define the material entering and leaving the line before choosing machine quantities or a reference model.
Start with qualified tubes.
Confirm tube dimensions, identification, supply reels, the central member and any fillers before laying out the pay-off area.
Coordinate reversal and tension.
Review the SZ lay, reversal sequence and binding requirements against the approved cable-core drawing.
Apply the specified package.
Filling compound, binding yarn and water-blocking tape depend on the construction. They are not interchangeable default packages.
Deliver a core ready for the next stage.
Agree core geometry, reel build, identification and checks before the core proceeds to its specified sheathing or protection stage.
Configure the line around the core you need to make.
Start with the supply boundary and product mix. Model labels do not replace a review of tube handling, stranding, binding, traction and take-up.
Locate the machine. See its role in the core.
Select a marker or equipment card to highlight the corresponding area and open its image here. The complete line remains visible; the detail view preserves the original image proportions.
05 · SZ oscillatorHighlighted location in the reference process train
Equipment reference from the supplied project document; final arrangement may differ.
SZ oscillator
Alternates the stranding direction to form the prescribed SZ lay around the central member. Coordinate reversal with incoming tube tension, traction and the downstream binding system.
Tube paths, required pitch, reversal sequence, oscillator movement, line speed and core quality checks.
Selected equipment 05: SZ oscillator
مرز مرجع: the panorama illustrates equipment order, not the final machine count, footprint or construction. Images from the project document show equipment families; the approved layout and equipment list define the supplied arrangement.
Compare the complete operating requirement—not one headline speed.
Use a stated cable, material package and test method when reviewing the line. Component limits and net production output are not the same number.
| Review area | چه چیزی را مشخص کنیم | Why it changes the line |
|---|---|---|
| Tube and package range | قطر لوله، تعداد لوله، کلافهای تأمین، عناصر پرکننده و بستهبندی عضو مرکزی. | Determine the pay-off arrangement and material path. |
| Core geometry | قطر هسته، گام پیچش، نقاط برگشت، گام بستن و هندسه پس از کشش. | هسته نهایی و تناسب آن در مراحل بعدی را تعریف کنید. |
| سیستم ضد آب | ترکیب، مواد خشک، فرمت نوار/نخ، موقعیتهای کاربرد و تمیزکاری. | Match the material package to the cable design. |
| Speed and synchronization | سرعت پایدار مورد نیاز برای یک کابل مشخص، رفتار شروع/توقف و تلفات تعویض. | Review the complete line, not one motor or binder maximum. |
| رولها و نحوه جابجایی | Input/output reel dimensions and weight, clamping, lifting and traverse. | Specify loading space and the operating sequence. |
| Controls and acceptance | دستورالعملها، سیگنالهای کشش، آلارمها، رابطهای ایمنی، روشهای بازرسی و شرایط آزمایش. | Make responsibilities and acceptance measurable. |
Confirm the technical schedule for your cable.
The supplied reference uses 12 loose-tube pay-offs. Final tube range, lay, binding speed, line speed, output drum and installed power belong in the agreed technical schedule—not an assumption based on the model name.
See where SZ core formation fits into the cable route.
These published constructions use a stranded loose-tube core. Review the whole solution to understand the stages before and after this line.
کابل ADSS
SZ-stranded loose tubes form the core before the specified aramid reinforcement and sheathing route.
Open cable solutionکابل میکرو
Review the compact core geometry and tube handling required before the final PE sheath.
Open cable solutionGYXTC8S Figure-8 Cable
The published stranded construction passes through core formation before armoring, messenger positioning and figure-8 sheathing.
Open cable solutionConstruction matters: a central-tube cable does not automatically require this standalone SZ line. The linked Figure-8 page describes its particular stranded construction, not every cable sold under a similar name.
Need to produce the loose-tube input first? Review the خط تولید لوله شل.
Watch the process. Define what the trial must demonstrate.
The HONGKAI HK-800/12 video supports a discussion of equipment and operating sequence. It is not a capacity guarantee or an acceptance record for a new project.
Trial the specified construction.
Use agreed tubes, central member, binding materials and reels.
Check coordinated behavior.
کشش پرداخت، معکوسشدن SZ، بستن، کشش و توالی راهاندازی/توقف را رعایت کنید.
Agree the inspection record.
Confirm core geometry, lay, winding and the required optical or other checks against the written test method.
Define the support around the equipment—not only the machine list.
The written proposal should connect equipment selection, integration and start-up responsibilities. Confirm the scope with HONGKAI for your project.
دامنه تجهیزات
- ماژولها و تعدادهای تأمینشده را مشخص کنید
- Identify retained and buyer-supplied equipment
- ثبت مسئولیتهای مربوط به تجهیزات و منابع
Line integration
- بررسی چیدمان و رابطهای جریان مواد
- Define controls, utilities and safety boundaries
- محدوده نصب و راهاندازی را توافق کنید
Start-up & support
- Define trial products and acceptance records
- تأیید آموزش اپراتور و مستندات
- Agree spare-parts and after-sales scope
درباره هستهای که نیاز دارید تولید کنید، به ما بگویید.
Start with your drawing, product requirements or existing equipment. Technical details can be confirmed during the first review.
Nine inputs for an SZ line review.
- 01
Cable and cable-core drawings
- 02
تعداد لولهها، ابعاد و حلقههای تأمین
- 03
Central member and filler details
- 04
Binding and water-blocking materials
- 05
Pitch and reversal requirements
- 06
Output reel and handling requirements
- 07
Target output and operating plan
- 08
Factory layout and retained equipment
- 09
Quality checks and acceptance conditions
Questions before specifying an SZ line.
Review the cable construction, equipment boundary and information needed for a proposal.
01خط رشتهبندی SZ کابل نوری چه محصولی تولید میکند؟
این هسته کابل بافتدار را از لولههای شل واجد شرایط و عضو مرکزی مشخصشده تشکیل میدهد، همراه با بستبندی و بسته ضد آب مورد نیاز در ساختار. تقویت نهایی، زرهپوشی و روکشدهی مراحل جداگانهای هستند مگر اینکه دامنه کتبی آنها را ترکیب کند.
02کدام راهحلهای کابل میتوانند این مرحله را شامل شوند؟
ساختارهای مرجع ADSS، کابل میکرو و GYXTC8S که به آنها پیوند داده شده است، شامل رشتهبندی هسته SZ هستند. تناسب آنها به تعداد واقعی لولهها، هندسه هسته، مواد و الزامات فرآیند بستگی دارد. صرفاً یکسان بودن نام کابل بهتنهایی تأییدی بر سازگاری نیست.
03آیا HK-800/12 تنها پیکربندی ممکن است؟
HK-800/12 شماره مرجع پروژه تأمینشده برای توضیح تجهیزات است. همچنان باید پیشنهاد، تعداد لولههای فعال، بستههای ورودی و خروجی، نوسانساز، سیستم اتصال، کنترلها و محدوده عملیاتی مورد نیاز را مشخص کند. سایر پیکربندیها نیازمند تأیید مهندسی هستند.
04آیا مقادیر تجهیزات نمایش داده شده ثابت هستند؟
خیر. پانوراما ترتیب تجهیزات را نشان میدهد و لیست ماژولها عملکردهای آن را توضیح میدهد. پیشنهاد مرجع ارائهشده شامل 12 دستگاه پرداخت لوله است، در حالی که پانوراما سادهشده است. برای تعیین تعداد، از لیست تجهیزات و چیدمان تأییدشده استفاده کنید.
05آیا هر ساختوسازی نیاز به پرکردن با ترکیب و نوار ضد آب دارد؟
خیر. ترکیب پرکننده، نخ بستهبندی، نوار و سایر مواد محافظ از ساختار کابل و الزامات پروژه مربوطه انتخاب میشوند. موقعیتهای کاربردی و تجهیزات آنها باید بهصورت مشترک تأیید شوند.
06سرعت تولید چگونه باید مقایسه شود؟
از همان نقشه کابل، مواد، گام، بستهبندی روی سُر، مدت زمان آزمایش و روش بازرسی استفاده کنید. حداکثر سرعت اجزا، سرعت پایدار خط کامل و خروجی خالص پس از تعویضها معیارهای متفاوتی هستند.
07آیا ماشینهای انتخابشده میتوانند در یک خط موجود ادغام شوند؟
ابتدا باید تجهیزات باقیمانده، از جمله وضعیت مکانیکی آن، سیگنالهای کنترلی، جهت خط، رابطهای ایمنی و ظرفیت موجود، بررسی شوند. سپس پیشنهاد، محدوده جایگزینی و مرز پذیرش را مشخص میکند.
08برای پیشنهاد اولیه چه چیزی باید ارسال کنم؟
اطلاعات موجود در مورد نقشه کابل، لوله و سیمپیچ، ساختار هادی، هدف تولید و شرایط کارخانه را ارسال کنید. در صورت شناخته بودن، الزامات مربوط به بستبندی و ضدآبکردن را نیز اضافه کنید. جزئیات مفقود میتوانند برای بررسی مهندسی باز باقی بمانند.