Final-stage panorama · Complete equipment train shown without cropping FOUR-STAGE ROUTE BELOW Review each process and its equipment Micro Cable Production Line
What does this production route produce? This reference solution follows a four-stage route for compact Micro Cable used in microduct and dense-access projects. HK-235 prepares the colored fibers, HK-50 forms the jelly-filled PBT loose tubes, HK-800/12 strands the specified tubes around the central member, and HK-90 integrates the confirmed water-blocking package before extruding the PE sheath. Final construction follows the approved cable drawing.
- Production route
- HK-235 → HK-50 → HK-800/12 SZ → HK-90 Micro Cable
- Control approach
- Coordinated controls reviewed for each production stage
- Main processes
- Fiber preparation · jelly-filled PBT loose-tube extrusion · SZ stranding · water-blocking integration · PE sheathing
- Suitable cable range
- Compact stranded loose-tube Micro Cable · microduct and dense-access applications · final design confirmed per project
Final-stage panorama · Complete equipment train shown without cropping FOUR-STAGE ROUTE BELOW Review each process and its equipment Read the compact stranded loose-tube cable from the inside out.
Open the exploded view, select a visible component, and see which of the four production stages prepares, forms or integrates it into the finished Micro Cable.
Four stages form the reference Micro Cable.
Select a layer above to highlight the stage that prepares, forms or integrates it.
Review the production configuration for the selected cable layer.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete four-stage Micro Cable reference route.
HK-235
Optical fiber coloring and rewinding
Apply the approved identification colors, cure the coating and rewind each fiber under controlled tension before loose-tube extrusion.
- Input
- Natural optical fibers + approved color sequence
- Output
- Identified and rewound colored fibers
- Route position
- Stage 01 · Fiber identification and preparation
Color, cure and rewind each fiber
Create identifiable, tension-controlled fiber packages for the HK-50 loose-tube stage.
Color order, coating quality and winding tension
Control identification sequence, coating uniformity, curing, line speed, tension and reel build.
Fiber type, color plan and reel package
Confirm fiber specification, count, color sequence, supply reel and required finished package.
Machine quantity, performance, auxiliary systems and final arrangement are configured from the approved Micro Cable drawing, production target and plant conditions.
Watch SZ stranding build the compact Micro Cable core.
This HONGKAI process video provides a practical reference for the HK-800/12 SZ cable-core stranding stage. It connects qualified loose tubes from HK-50 with the bound stranded core required before final PE outer sheathing on HK-90.
Define the Micro Cable project boundary before the route is finalized.
The four-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
Opening a group only reveals its details; it does not confirm scope.
01 Buyer prepares Buyer responsibility Project, product and site information for engineering review 4 items
Information HONGKAI must review before fixing the production route and reference equipment configuration.
- Micro Cable drawing, fiber count and finished-cable requirements To be confirmed
- Fiber, PBT, filling compound, central member, water-blocking and PE material inputs To be confirmed
- Factory space, utilities, access and installation conditions To be confirmed
- Existing equipment and interfaces across coloring, loose-tube, SZ and sheathing stages To be confirmed
02 Defined in the written proposal HONGKAI responsibility Recommended configuration and quoted supply boundary 4 items
HONGKAI defines the recommended configuration and quoted supply boundary after reviewing the available project inputs.
- Recommended four-stage route and reference equipment configuration To be confirmed
- Quoted equipment list and equipment-source boundary To be confirmed
- Required interfaces between HK-235, HK-50, HK-800/12 SZ and HK-90 To be confirmed
- Documentation, commissioning, training and after-sales scope stated in the proposal To be confirmed
03 Confirmed together Joint confirmation Technical interfaces, acceptance and project coordination 4 items
Technical interfaces, acceptance and project coordination require written confirmation from both project teams.
- Final Micro Cable process route and equipment configuration To be confirmed
- Layout, interface split and site-readiness conditions To be confirmed
- Acceptance criteria for each stage and finished Micro Cable To be confirmed
- Delivery, installation, trial schedule, changes and final sign-off To be confirmed
Prepare the inputs for a complete Micro Cable production review.
Select the planning topics you are ready to discuss during the first engineering review. A selection marks a review topic only; it does not approve a technical value, equipment quantity, material grade, performance target or supply scope.
Review the available Micro Cable production references and what still needs confirmation.
These images illustrate the HK-235, HK-50, HK-800/12 SZ and HK-90 stages mapped to the current Micro Cable route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-235 fiber coloring and rewinding reference
Reference equipment for coloring and rewinding optical fibers before loose-tube extrusion. Final fiber count, color sequence, number of units, payoff interfaces and operating requirements remain project-specific.
These production-stage images illustrate the current four-stage Micro Cable planning route only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
Customer perspectives on the four-stage Micro Cable production route.
The feedback focuses on compact stranded loose-tube construction, SZ cable-core control, water-blocking integration and final PE sheathing. HK-235 → HK-50 → HK-800/12 SZ → HK-90
For the Micro Cable Production Line, the four-stage route made the project easier to review. We could follow fiber coloring, PBT loose-tube extrusion, SZ cable-core formation and final PE sheathing as one connected process.
The HK-800/12 SZ stage made tube count, fillers, central-member alignment, SZ pitch, binders and water-blocking materials easier to review before the cable core entered final PE sheathing.
The planning boundary kept fiber and tube counts, central-member material, jacket dimensions, tooling, reel sizes, utilities and acceptance conditions visible throughout the final Micro Cable configuration review.
Names, roles and photos follow existing HONGKAI customer records. The Micro Cable-specific wording summarizes technical project-review priorities and is not presented as a verified product-specific quotation.
Clarify the Micro Cable route before requesting a proposal.
These answers connect the compact SZ-stranded loose-tube construction to the four-stage reference route and the inputs needed for engineering review.
What stages are included in the Micro Cable reference production route?
The reference route has four stages: HK-235 fiber coloring and rewinding, HK-50 jelly-filled PBT loose-tube extrusion, HK-800/12 SZ cable-core stranding with the approved binding and water-blocking package, and HK-90 final PE outer sheathing. The final configuration must follow the approved cable drawing and written project inputs.
What cable construction is this route intended to produce?
It is a reference route for compact SZ-stranded loose-tube Micro Cable. The mapped structure includes colored optical fibers, jelly-filled PBT loose tubes, a central strength member, an approved water-blocking package and a PE outer sheath. Fiber count, tube count, materials and dimensions remain project-specific.
What is handed off between the four production stages?
HK-235 supplies identified and rewound colored fibers to HK-50. HK-50 produces qualified jelly-filled loose-tube packages for HK-800/12 SZ. The SZ stage forms the bound, water-blocked stranded cable core, which then enters HK-90 for PE extrusion, cooling, dimensional monitoring, marking and finished-cable take-up.
Which cable and material details must be confirmed before the proposal?
Confirm the approved cable drawing, fiber count and color plan, tube and filler arrangement, loose-tube geometry, central-member material and size, PBT and filling-compound grades, binder and water-blocking construction, PE grade, finished dimensions, marking and reel formats. These inputs determine the stage interfaces and final equipment scope.
Is FRP or one water-blocking material mandatory for every design?
No single material should be assumed from the reference page. The central member may use project-specified FRP or another approved material, while the water-blocking package may use approved tape, yarn or another specified construction. The cable drawing and material specification control the final choice.
Do the reference images and video confirm speed or line arrangement?
No. They illustrate the process and shared equipment only. They do not confirm final reel quantities, tube arrangement, SZ pitch or reversal length, line speed, machine quantity, factory layout, supplied scope, performance or acceptance criteria for a specific project.
Can existing factory equipment be connected to this four-stage route?
Existing upstream or downstream equipment can be reviewed, but compatibility is not assumed. HONGKAI must review equipment interfaces, factory space, material flow, voltage, frequency, compressed air, cooling water, access and installation conditions before defining the interface and supply boundary in writing.
How are output, inspection and acceptance requirements established?
No default capacity is assumed. The project review should confirm the target product mix, operating schedule, required output, source and delivery reel formats, stable operating conditions, inspection and sampling points, FAT or other acceptance criteria, and site-readiness requirements. Binding values belong in the approved technical agreement.
Final cable construction, equipment, performance, acceptance criteria and supply scope are defined in the signed technical and commercial agreement.
Plan your Micro Cable production project.
Share the approved cable drawing, fiber and loose-tube counts, color plan, tube and filler arrangement, loose-tube geometry, central-member specification, PBT and filling-compound grades, binder and water-blocking construction, PE grade, finished dimensions, output and reel plan, and factory conditions. HONGKAI will review the four-stage route, equipment interfaces and open technical items before preparing a project-specific proposal.
What HONGKAI will review
- Target product plan
- Micro Cable constructions, fiber and tube counts, dimensions and material requirements
- Process route
- HK-235, HK-50, HK-800/12 SZ and HK-90 inputs, outputs and interfaces
- Capacity target
- Product mix, expected output and target line speed
- Factory conditions
- Available space, utilities, existing equipment and testing needs
- Project stage
- Planning, budgeting, factory preparation or production expansion
- Review status
- Preliminary assessment · Technical confirmation required
What to prepare · 6 items
- Approved Micro Cable drawing, reference sample or target requirements
- Fiber count, color plan, loose-tube and filler arrangement
- Central member, PBT, filling compound, binder, water-blocking and PE requirements
- Target product mix, output, reel formats and expected operating conditions
- Existing equipment, material flow and available factory layout
- Utilities, inspection, acceptance needs and planned project timeline
No complete specification yet? Share your target products and current assumptions. Unknown values can be described as open engineering inputs.
The information submitted here supports a preliminary technical review. Final equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.