Review the stranding head together with tube tension, line speed and binding.
خط إنتاج التضفير SZ
أرومة كابلات ذات أنابيب فضفاضة · التفريغ إلى لُفّ الأرومة النهائية
Bring loose tubes and the specified central member together in a controlled SZ-stranded core. Match tube handling, reversal, binding and water blocking to the cable drawing, then coordinate traction and take-up for the next production stage.
- INPUT
- Qualified loose tubes, central member and specified filling / binding materials
- OUTPUT
- Stranded and bound cable core on the agreed package
- CORE PROCESS
- Pay off → SZ strand → bind / water block → pull → take up
- CONFIGURATION BASIS
- Tube count, product dimensions, pitch, tension and factory interfaces
Scope boundary: this line forms the cable core. Loose-tube extrusion, final armoring, aramid reinforcement and jacket extrusion are separate stages unless specifically included in the written scope.
From separate loose tubes to one coordinated cable core.
Define the material entering and leaving the line before choosing machine quantities or a reference model.
Start with qualified tubes.
Confirm tube dimensions, identification, supply reels, the central member and any fillers before laying out the pay-off area.
Coordinate reversal and tension.
Review the SZ lay, reversal sequence and binding requirements against the approved cable-core drawing.
Apply the specified package.
Filling compound, binding yarn and water-blocking tape depend on the construction. They are not interchangeable default packages.
Deliver a core ready for the next stage.
Agree core geometry, reel build, identification and checks before the core proceeds to its specified sheathing or protection stage.
Configure the line around the core you need to make.
Start with the supply boundary and product mix. Model labels do not replace a review of tube handling, stranding, binding, traction and take-up.
Locate the machine. See its role in the core.
Select a marker or equipment card to highlight the corresponding area and open its image here. The complete line remains visible; the detail view preserves the original image proportions.
05 · SZ oscillatorالموقع المميز في مسار العملية المرجعي
Equipment reference from the supplied project document; final arrangement may differ.
SZ oscillator
Alternates the stranding direction to form the prescribed SZ lay around the central member. Coordinate reversal with incoming tube tension, traction and the downstream binding system.
Tube paths, required pitch, reversal sequence, oscillator movement, line speed and core quality checks.
Selected equipment 05: SZ oscillator
Reference boundary: the panorama illustrates equipment order, not the final machine count, footprint or construction. Images from the project document show equipment families; the approved layout and equipment list define the supplied arrangement.
Compare the complete operating requirement—not one headline speed.
Use a stated cable, material package and test method when reviewing the line. Component limits and net production output are not the same number.
| Review area | What to specify | Why it changes the line |
|---|---|---|
| نطاق الأنبوب والتعبئة | قطر الأنبوب، كمية الأنابيب، بكرات التغذية، عناصر الحشو وحزمة العضو المركزي. | حدد ترتيب التفريغ ومسار المادة. |
| Core geometry | قطر القلب، واللفة، ونقاط الانعكاس، ودرجة الربط، والهندسة بعد السحب. | عرّف القلب النهائي ومطابقته في المراحل اللاحقة. |
| نظام منع تسرب المياه | المركب، المواد الجافة، شكل الشريط/الخيط، مواقع التطبيق والتنظيف. | طابق مجموعة المواد مع تصميم الكابل. |
| السرعة والتزامن | السرعة الثابتة المطلوبة لكابل محدد، وسلوك البدء/التوقف، وفقدان التحويل. | Review the complete line, not one motor or binder maximum. |
| البكرات والمناولة | أبعاد بكرة الإدخال/الإخراج والوزن، والتثبيت، والرفع، والحركة العرضية. | Specify loading space and the operating sequence. |
| Controls and acceptance | الوصفات، إشارات التوتر، التنبيهات، واجهات السلامة، طرق الفحص وظروف التجربة. | اجعل المسؤوليات والقبول قابلين للقياس. |
تأكيد الجدول الزمني الفني لكابلِك.
The supplied reference uses 12 loose-tube pay-offs. Final tube range, lay, binding speed, line speed, output drum and installed power belong in the agreed technical schedule—not an assumption based on the model name.
انظر أين يناسب تشكيل القلب SZ في مسار الكابل.
تستخدم هذه التصاميم المنشورة لبًا أنبوبيًا فضفاضًا مجدولًا. راجع الحل الكامل لفهم المراحل السابقة واللاحقة لهذا الخط.
كابل إي دي إس إس
SZ-stranded loose tubes form the core before the specified aramid reinforcement and sheathing route.
Open cable solutionMicro Cable
راجع هندسة القلب المدمج والمعالجة المطلوبة للأنبوب قبل الغلاف النهائي من البولي إيثيلين (PE).
Open cable solutionGYXTC8S Figure-8 Cable
The published stranded construction passes through core formation before armoring, messenger positioning and figure-8 sheathing.
Open cable solutionConstruction matters: a central-tube cable does not automatically require this standalone SZ line. The linked Figure-8 page describes its particular stranded construction, not every cable sold under a similar name.
Need to produce the loose-tube input first? Review the خط إنتاج الأنابيب السائبة.
Watch the process. Define what the trial must demonstrate.
The HONGKAI HK-800/12 video supports a discussion of equipment and operating sequence. It is not a capacity guarantee or an acceptance record for a new project.
جرّب التركيب المحدد.
Use agreed tubes, central member, binding materials and reels.
Check coordinated behavior.
Observe pay-off tension, SZ reversal, binding, traction and start/stop sequence.
Agree the inspection record.
تأكيد هندسة القلب، واللف، واللفافات والفحوصات البصرية أو غيرها المطلوبة وفقًا لطريقة الاختبار المكتوبة.
عرّف الدعم المحيط بالمعدات—ليس فقط قائمة الآلات.
The written proposal should connect equipment selection, integration and start-up responsibilities. Confirm the scope with HONGKAI for your project.
نطاق المعدات
- حدد الوحدات الموردة والكميات
- Identify retained and buyer-supplied equipment
- سجل مسؤوليات مصدر المعدات
Line integration
- مراجعة واجهات التخطيط وتدفق المواد
- Define controls, utilities and safety boundaries
- الاتفاق على نطاق التركيب والتشغيل
Start-up & support
- تحديد منتجات التجربة وسجلات القبول
- Confirm operator training and documentation
- Agree spare-parts and after-sales scope
Tell us about the core you need to produce.
ابدأ برسمك أو متطلبات منتجك أو المعدات الحالية. يمكن تأكيد التفاصيل الفنية خلال المراجعة الأولى.
تسعة مدخلات لمراجعة خط SZ.
- 01
Cable and cable-core drawings
- 02
Tube count, sizes and supply reels
- 03
Central member and filler details
- 04
مواد الربط ومواد منع تسرب الماء
- 05
Pitch and reversal requirements
- 06
متطلبات بكرة الإخراج والمناولة
- 07
Target output and operating plan
- 08
تخطيط المصنع والمعدات المحتفظ بها
- 09
Quality checks and acceptance conditions
أسئلة قبل تحديد خط SZ.
Review the cable construction, equipment boundary and information needed for a proposal.
01ما الذي تنتجه خطوة التفاف الكابل الضوئي بنمط SZ؟
يُشكّل نواة كابل مجدول من أنابيب فضفاضة مؤهلة وعنصر مركزي محدد، مع الحزمة الملزمة والحاجزة للماء المطلوبة في التصميم. يُعد التعزيز النهائي والدرع الخارجي والغلاف مراحل منفصلة ما لم ينص نطاق العمل المكتوب على دمجها.
02ما حلول الكابلات التي يمكن أن تتضمن هذه المرحلة؟
تتضمن التراكيب المرجعية المرتبطة من نوع ADSS والكابلات الدقيقة وكابل GYXTC8S التضفير الحلزوني (SZ) للنواة. ويعتمد مدى ملاءمتها على عدد الأنابيب الفعلي، وهندسة النواة، والمواد، ومتطلبات العملية. ولا يُعد تطابق اسم الكابل وحده تأكيدًا على التوافق.
03هل HK-800/12 هو التكوين الممكن الوحيد؟
HK-800/12 هو مرجع المشروع المُزوَّد المستخدم لشرح المعدات. يجب أن يحدد العرض مع ذلك عدد الأنابيب الفعالة، وطرفي الإدخال والإخراج، والمذبذب، ونظام التثبيت، والضوابط، والغلاف التشغيلي المطلوب. تتطلب التهيئة الأخرى تأكيدًا هندسيًا.
04هل كميات المعدات المعروضة ثابتة؟
لا. يوضح البانوراما ترتيب المعدات، ويشرح قائمة الوحدات وظائفها. تسرد وثيقة الاقتراح المرجعي المقدمة وحدات سحب الأنابيب 12، في حين أن البانوراما مبسَّطة. استخدم قائمة المعدات المعتمدة والتخطيط لتحديد الكميات.
05هل يتطلب كل تركيب شريطاً مركباً للحشو وشريطاً لسد الماء؟
يتم اختيار مركب التعبئة، وخيوط الربط، والشريط ومواد الحماية الأخرى من بنية الكابل ومتطلبات المشروع المعمول بها. يجب تأكيد مواقع تطبيقها والمعدات المستخدمة معًا.
06كيف ينبغي مقارنة سرعة الإنتاج؟
استخدم نفس رسم الكابل، والمواد، والخطوة، وتعبئة البكرة، ومدة التجربة، وطريقة الفحص. إن السرعات القصوى للمكونات، والسرعة المستقرة للخط الكامل، والناتج الصافي بعد عمليات التغيير تُعد مقاييس مختلفة.
07هل يمكن دمج الآلات المختارة في خط إنتاج موجود؟
يجب مراجعة المعدات المحتفظ بها أولاً، بما في ذلك حالتها الميكانيكية، وإشارات التحكم، واتجاه الخط، وواجهات السلامة، والقدرة المتاحة. بعد ذلك، يحدد العرض نطاق الاستبدال وحدود القبول.
08ما الذي يجب أن أرسله للاقتراح الأول؟
أرسل رسم الكابل المتاح، ومعلومات الأنبوب والبكرة، وبناء القلب، وهدف الإنتاج، وسياق المصنع. أضف متطلبات الربط ومنع دخول الماء إذا كانت معروفة. يمكن ترك التفاصيل الناقصة مفتوحة لمراجعة الهندسة.