01

SELECTED LAN PROCESS LINE

LAN 쌍 트위스팅 라인

공장에 장비를 배치하기 전에 코어 구조, 페어 비틀기, 페어 레이 및 백-비틀기 요구사항을 선택하십시오.

HONGKAI enclosed triple pair-twist machine for LAN cable pair preparation
참고용으로 삼중 쌍-트위스트 패밀리가 표시됩니다. 프로젝트에 맞는 페어링 경로를 선택하세요. 장비 세부 정보를 보려면 이미지를 선택하세요.

02

PROCESS ROUTE

케이블 설계에 페어링을 활용하십시오

Turn insulated conductors into the twisted pairs used by the LAN cable assembly stage. Match pair lay, tension, direction, back-twist and reel interfaces to the intended cable construction.

Pair twisting sits between insulated-core production and cable-core assembly. It is relevant when you need to create the required pair geometry, review back-twist or balance pairing output with a cabling line. The important decision is the pairing route for the actual core. A triple pair-twist family and a back-twist pay-off with a pairing system are different arrangements. Review each against the cable drawing, reel interfaces and agreed working target before treating a catalog model as a selected line.

Incoming material

Two approved insulated conductors per pair

Finished output

Twisted pair on a receiving reel

Select by

Pair geometry, back-twist and production balance

Line scope

승인된 케이블 도면 및 프로젝트 입력에서 확인됨

Two insulated LAN cable conductors twisted into a pair
Twisted-pair structure. Pair lay and core dimensions are defined by the cable drawing.

Two insulated cores become one controlled pair

The illustration makes the pair geometry easier to review. Specify the lay and direction for each pair, then connect those settings to core tension, back-twist and the cabling reel format.

생산 공정을 따르십시오

STAGE 01

Feed the insulated cores

Confirm core diameter, insulation construction and pay-off packages. Where back-twist is required, specify the pay-off arrangement and its relationship to pair formation.

STAGE 02

Form the pair

Set the pair-specific lay and direction with the required tension and back-twist controls. A triple pair-twist family and a separate back-twist pay-off plus pairing system are distinct configuration routes.

STAGE 03

Receive for cabling

Collect each pair on a package compatible with the cabling pay-offs. Balance the required pair output with the downstream four-pair assembly operation.

What a well-defined line gives your project

A route selected for the pair

Put core dimensions, pair lay, direction and back-twist into the specification. These inputs explain why a particular pairing arrangement is being considered.

A receiving package that fits cabling

Review the output reel against the cabling pay-offs. The pairing and assembly stages then share a defined transfer interface.

An allocation based on factory balance

Use the required pair outputs and downstream demand to review the number of pairing sets. A reference-project quantity remains a reference rather than a default purchase list.

03

LINE EQUIPMENT

Equipment duties and configuration

Review each module by its function and the project input it needs. Use the documented arrangement as a configuration reference.

HONGKAI LAN triple-twist equipment arrangement reference
Pair-twist equipment reference. Select the machine route for the approved insulated cores.

Inspect the pairing equipment arrangement

Compare the illustrated triple-twist family with the pay-off and back-twist route in your proposal. Reel handling, tension control and guarding belong in the configuration review.

Two-core pay-off and reel handling

Feed the two specified insulated conductors. Confirm reel geometry, core handling and the tension requirements for the selected pair.

Back-twist pay-off where the selected route requires it

The CAT7 reference uses a 500 mm double-disc horizontal back-twist pay-off with auxiliary traction before the pairing machine. Its back-twist adjustment is specified separately from the pair-forming machine.

Pair-twisting equipment selected for the core construction

The CAT5/CAT6 project specifies HK-500 triple twisting with electronically set pitch. The CAT7 pairing reference uses a separate machine and change-gear pitch adjustment; these control arrangements are not interchangeable.

Tension coordination and auxiliary haul-off

Review the tension path and any auxiliary haul-off through pair formation. Define the settings and adjustments that belong in the selected configuration.

Lay, direction and length controls

Specify pair lay, direction and length-control duties. These settings must refer to the intended cable design and the agreed inspection basis.

Pair take-up and the specified interlocks

Collect the pair on the package required by cabling. Confirm take-up, interlocks and the handling sequence at the transfer point.

Configuration reference

Two documented pairing routes

  • CAT5/CAT6 reference: HK-500 triple-twist machine; 500 mm reels; electronic pitch 1-60 mm; maximum rotational speed 2,000 rpm.
  • The triple-twist arrangement includes external pay-off, internal rotary pay-off, servo twisting, servo traction and rotary shaftless take-up.
  • CAT7 reference: 500 mm double-disc horizontal back-twist pay-off, auxiliary traction and a separate PLC pairing machine.
  • CAT7 reference pairing pitch: 4.22-41.62 mm with change gears. The back-twist unit and pairing machine have separate ratings.

Choose one route for the specified insulated cores and pair lay. Reference-project quantities and machine maxima are not a common working output for both routes.

구성 경로 선택

HK-500 triple-twist route Review the 500 mm reel system, servo twisting and traction, electronic 1-60 mm pitch setting and safety interlocks for the approved CAT5/CAT6 core construction.

CAT7 back-twist and pairing route Review the separate 500 mm horizontal back-twist pay-off, auxiliary traction and pairing machine. Confirm the required back-twist setting and change-gear pair lay.

Factory allocation
After the route is selected, evaluate the required pairing sets against pair-specific working output and downstream assembly demand. Do not combine alternatives into an assumed supply scope.

HONGKAI LAN pair-twisting operating reference. Pair settings and acceptance checks follow the project specification.

Watch LAN pair twisting in operation

Look at how the insulated cores are guided and collected while the pair is formed. Review the exact pay-off and back-twist arrangement with your proposed scope.

  • Core guidance into the twisting operation
  • Pair collection and reel handling
  • Machine enclosure and operator access

04

FACTORY INPUTS

Define the line before comparing quotations

Use the same cable, material and receiving-package requirements when comparing configurations. Unknown items can remain questions for the review.

Your selection brief

Core and pair dimensions
Provide conductor and insulation dimensions, pair outside diameter and the insulation material.

Pair settings
Supply the required lay for each pair, direction, back-twist requirement and acceptance criteria.

Factory balance
Define the receiving reels, production target and downstream cabling interfaces before deciding the number of pairing sets.

Inputs to include

Insulated core

Conductor and insulation dimensions, material and core sample.

페어 구조

Pair outside diameter and the required lay for each pair.

Rotation requirements

Lay direction, back-twist requirement and the chosen process route.

Reel interfaces

Incoming core reels and receiving pair reels with dimensions.

Production balance

Pair mix, required working output and downstream cabling demand.

수락

Pair geometry, handling checks and finished-cable electrical test basis.

05

SUPPLY SCOPE & QUALITY

Agree supply scope and acceptance

Put the selected equipment, plant interfaces and product-specific checks into the written proposal.

ACCEPTANCE CHECKPOINTS

Checks to agree

  • Agree how pair lay and core geometry will be checked at the selected operating point.
  • Review tension and handling through both pairing and cabling.
  • Confirm the finished-cable electrical tests required by the cable specification.

SUPPLY BOUNDARY

확인할 범위

Identify whether the proposal supplies the HK-500 triple-twist route or the separate CAT7 back-twist and pairing system. List pay-offs, traction, take-up, controls, reels and interlocks for the chosen route.

Define the acceptance sequence

Trial basis

Agree the representative insulated cores, pair settings and receiving reels for the trial.

Line and product checks

Check pair lay and geometry at the selected operating point, including the required tension and back-twist arrangement.

Records and transfer

Record the pair sample and handling checks; evaluate cable-category acceptance using the complete finished-cable test basis.

07

REFERENCE PRICING

Plan your equipment budget

Review the EXW reference price for the named configuration, then request a quotation against your cable drawing, output target and required supply scope.

HK-500 triple-twist configuration

USD 29,300

Per machine

HK-500 horizontal back-twist and pairing configuration

USD 32,000

Per reference set

EXW. Taxes excluded.

Confirm your quotation scope

The CAT5/CAT6 triple-twist route with electronic pitch control. The separately configured horizontal back-twist and pair-twisting route.

Prices are in USD on an EXW basis and exclude taxes. They apply to the named reference configurations. Final price and validity depend on the agreed equipment, tooling, auxiliaries and project requirements.

Confirm the supply boundary and delivery arrangements in the quotation.

08

CUSTOMER FEEDBACK

Good value, with one project team

Feedback from Devang Shah on HONGKAI’s LAN cable equipment and one-stop project service for Channeltech Systems in India.

5 / 5
정격된 전류 5 이상을 벗어 5

Devang Shah

Channeltech Systems
인도

1 customer review
LAN cable equipment project

Equipment value and project support

HONGKAI’s LAN cable production equipment offers good value for money. The service is good, and the one-stop solution saved time for our project.

English summary of customer feedback.

09

QUESTIONS BEFORE SELECTION

Questions before selecting the line

Clarify configuration choices, material duties and process boundaries before turning a reference arrangement into an equipment order.

Pair twisting combines two insulated conductors. Cabling assembles the completed pairs into the cable core and may introduce separator or wrapping elements.

The cable category depends on the complete cable construction and its specified electrical acceptance tests. Pair-twisting equipment is one stage in that route.

Calculate the allocation from the required output, pair lays, working speeds and downstream balance. A quantity shown in a reference project is not a universal requirement.

Compare each route for the same core, pair lay, back-twist duty and receiving package. Their general catalog operating ranges are not interchangeable production commitments.

Check the cabling pay-off capacity and reel drawing, the required pair length and the handling method. Include those interfaces in the pairing proposal.

Provide the core and pair drawings, pair-specific settings, process route, reel formats and working target. Include the electrical acceptance requirement for the completed cable project.

10

PROJECT ENQUIRY

Request a line configuration

LAN 쌍 트위스팅 라인

Include core dimensions, insulation material, pair lays and directions, back-twist requirement, reel drawings and the required pair output. Identify the cabling equipment that will receive the pairs.

Use the review to agree

  • The equipment arrangement and selected configuration route.
  • Incoming material, receiving package and plant interfaces.
  • The working target, supplied instruments and acceptance basis.

Send the information you already have. Mark undecided requirements for discussion rather than guessing a specification.

Send your project requirements

견적을 요청하세요

우리는 24시간 이내에 당신에게 대답할 것입니다!!!

왓츠앱