01
SELECTED LAN PROCESS LINE
LAN 교차 분리 압출 라인
LAN 케이블 코어 조립을 위해 지정된 교차 분리재를 정의된 재료 흐름으로 준비하십시오.
02
PROCESS ROUTE
프로필을 케이블 구조에 맞게 조정하십시오.
Extrude and collect the plastic cross separator used by a specified LAN cable construction. Match the profile tooling, material, cooling and receiving package to the separator drawing and its downstream cabling feed.
This line is relevant when the approved LAN cable drawing requires a cross separator and the factory plans to manufacture that profile. The starting point is the actual cross section, material and tolerance. Tooling, temperature control, cooling and take-up should be reviewed as a connected profile-production route. Its receiving reel must also suit separator feeding at the cabling stage. A separator-production line and the separator feed on the assembly machine are different parts of the factory scope.
Incoming material
승인된 분리재 조성물 및 프로파일 도면
Finished output
케이블 코어 조립용 리일형 교차 분리기
Select by
프로필 치수, 재질 및 피드 패키지
Line scope
승인된 케이블 도면 및 프로젝트 입력에서 확인됨
분리 프로파일은 케이블 구조에 사용됩니다.
The cross-section reference shows why the separator belongs in the cable drawing. Specify its profile, dimensions and material, then match its receiving package to the cabling feed arrangement.
생산 공정을 따르십시오
STAGE 01
분리막 정의
Provide the actual profile drawing and compound. Confirm the separator dimensions and its position in the cable core before selecting extrusion tooling.
STAGE 02
Extrude and cool the profile
Coordinate material feeding, profile tooling, temperature control and cooling with the required profile dimensions.
STAGE 03
Collect for the cabling stage
Specify haul-off, length measurement, storage and take-up. The finished separator package must match the selected cabling feed arrangement.
What a well-defined line gives your project
A profile tied to the cable drawing
Use the required separator geometry and orientation as selection inputs. This connects the extrusion tooling to the core that will receive the profile.
A visible material-transfer interface
Specify storage, take-up and cabling pay-off packages together. The separator becomes an identified incoming material for assembly.
A profile-specific working target
Assess output with the selected compound, tooling and cooling arrangement. This creates a production basis for that profile rather than an assumption from the model name.
03
LINE EQUIPMENT
Equipment duties and configuration
Review each module by its function and the project input it needs. Use the documented arrangement as a configuration reference.
Review the separator extrusion arrangement
Connect compound feeding, profile tooling, cooling, haul-off and collection around the selected separator. The receiving package must work with the downstream cabling operation.
Material feeding and project-selected drying
Supply the approved profile compound and identify any material-preparation or drying duty. Confirm which equipment and material responsibilities are included.
Profile extruder and cross-separator tooling
Form the selected cross section with the extruder and profile tooling. Use the actual separator drawing and tolerances to define the tooling duty.
Temperature and line controls
Identify the temperature and line-control requirements for the selected material and profile. Document the working basis to be reviewed during acceptance.
냉각 및 건조 장치
Specify the cooling and drying arrangement around the extruded geometry. Review the required water interfaces and handling of the profile.
Agreed profile or dimensional inspection
The reference includes a laser diameter gauge. Check the actual cross-section dimensions and profile tolerances with an agreed inspection method; a diameter reading alone does not establish every dimension of a cross separator.
Haul-off, length counting and separator take-up
The documented downstream route uses a 400 mm double-wheel capstan, a 9 m accumulator with electronic meter counting, and dual-shaft take-up for 400-630 mm reels. Match the collected separator to the cabling feed.
Configuration reference
HK-50 PLC cross-separator reference
- 50 mm main screw, L/D 26:1; documented screw range 10-110 rpm.
- 25 kg dryer/loader, PLC and HMI line control, and separator profile tooling.
- 1.5 m movable warm-water trough plus 8 m fixed cooling; laser diameter gauge.
- 400 mm double-wheel capstan, 9 m accumulator with meter counter, and dual-shaft take-up for 400-630 mm reels.
The reference project lists 120 m/min for separator production. A separate 450 m/min equipment/design figure is not the working guarantee for every cross profile. Confirm the compound, drawing and acceptance point.
구성 경로 선택
Cable drawing requires a separator
Define its cross section, compound, orientation and receiving package. Use those inputs to review the extrusion and cabling-feed scopes.
Separator is sourced externally
The assembly line still needs a defined feed package and handling interface. Confirm that interface even when profile extrusion is outside the equipment order.
Different separator profiles
Provide each proposed profile and material. Review tooling, cooling, changeover and the working basis for each rather than assuming one model covers every geometry.
04
FACTORY INPUTS
Define the line before comparing quotations
Use the same cable, material and receiving-package requirements when comparing configurations. Unknown items can remain questions for the review.
Your selection brief
Profile drawing
Specify the cross shape, dimensions, tolerance and the required orientation within the cable core.
Material and process
Provide the compound specification, cooling requirements and the working output target for that profile.
Receiving and feeding
Define separator reel dimensions, take-up handling and the interface to the cable-assembly pay-off.
Inputs to include
Cross section
Profile drawing, dimensions, tolerance and orientation in the cable core.
Compound
Exact material specification and preparation requirements.
Tooling scope
Profiles to be produced and the corresponding tooling or changeover duties.
Working target
Required output for the defined profile and material.
Receiving reel
Separator package, storage and cabling pay-off dimensions.
Inspection
Profile-measurement method, samples and acceptance records.
05
SUPPLY SCOPE & QUALITY
Agree supply scope and acceptance
Put the selected equipment, plant interfaces and product-specific checks into the written proposal.
ACCEPTANCE CHECKPOINTS
Checks to agree
- Agree profile dimensions and the inspection method for the actual cross section.
- Review cooling and handling against the separator geometry.
- Check the assembled cable construction and its electrical acceptance separately.
SUPPLY BOUNDARY
확인할 범위
Separator extrusion prepares an upstream material stream. The separator feed at the cabling machine is a separate interface that must also appear in the complete factory proposal.
Define the acceptance sequence
Trial basis
Agree the profile drawing, compound and tooling for the representative separator trial.
Line and product checks
Review dimensions, cooling, handling and the receiving package at the selected operating point.
Records and transfer
Record the profile results and its cabling-feed interface; define assembled-cable electrical acceptance in the full cable project.
06
RELATED ROUTES
Connect the upstream and downstream stages
Review the material and receiving packages on both sides of this line, then compare the complete LAN cable route.
Incoming operation
The incoming material is the approved separator compound for the selected profile tooling.
Next operation
The output separator is stored and fed into the cable-assembly process when required by the drawing.
Interface to confirm
Confirm both profile production and separator feeding in the factory proposal; they are separate equipment interfaces.
07
REFERENCE PRICING
Plan your equipment budget
Review the EXW reference price for the named configuration, then request a quotation against your cable drawing, output target and required supply scope.
HK-50 cross-separator extrusion configuration
USD 27,500
Per reference line
EXW. Taxes excluded.
Confirm your quotation scope
The documented 50 mm separator-profile extrusion arrangement.
Prices are in USD on an EXW basis and exclude taxes. They apply to the named reference configurations. Final price and validity depend on the agreed equipment, tooling, auxiliaries and project requirements.
Confirm the supply boundary and delivery arrangements in the quotation.
08
CUSTOMER FEEDBACK
Good value, with one project team
Feedback from Devang Shah on HONGKAI’s LAN cable equipment and one-stop project service for Channeltech Systems in India.
Devang Shah
Channeltech Systems
인도
1 customer review
LAN cable equipment project
Equipment value and project support
HONGKAI’s LAN cable production equipment offers good value for money. The service is good, and the one-stop solution saved time for our project.
English summary of customer feedback.
09
QUESTIONS BEFORE SELECTION
Questions before selecting the line
Clarify configuration choices, material duties and process boundaries before turning a reference arrangement into an equipment order.
This line manufactures the separator profile. The cabling line assembles the twisted pairs and feeds the separator when required by the cable drawing.
The approved cable construction determines whether one is required. Include the material and equipment route for that specific design.
Confirm the working output with the selected compound, profile tooling, cooling and take-up. A maximum or reference figure is not a profile-specific production guarantee.
It identifies the documented PLC-controlled line and 50 mm main screw. The actual profile, material, tooling, cooling and working target still define the selected configuration.
Confirm its profile and compound specification, receiving package and feed arrangement on the assembly machine. The feed interface remains part of the cable-core route.
Send a separate drawing and material specification for each profile. Identify the required tooling, product mix and changeover duties so the configuration review has a defined basis.
10
PROJECT ENQUIRY
Request a line configuration
LAN 교차 분리 압출 라인
Provide the separator cross-section, compound, tolerances, working target and reel drawings. Identify the cabling machine that will receive the separator and whether more than one profile is planned.
Use the review to agree
- The equipment arrangement and selected configuration route.
- Incoming material, receiving package and plant interfaces.
- The working target, supplied instruments and acceptance basis.
Send the information you already have. Mark undecided requirements for discussion rather than guessing a specification.





