Panorama lebar penuh · tidak ada peralatan yang dipotong
GYXTPY Jalur Produksi Kabel Tabung Tengah
Apa yang dihasilkan rute referensi ini? A compact outdoor GYXTPY cable with colored optical fibers inside a jelly-filled central PBT loose tube, two parallel strength members positioned beside the tube, and a black PE outer sheath. The final fiber count, tube size, reinforcement material and cable dimensions follow the approved cable drawing.
- Rute produksi
- HK-235 → HK-50 → HK-90 GYXTPY
- Konstruksi inti
- Tabung longgar pusat yang diisi jel PBT
- Proses utama
- Pewarnaan serat · ekstrusi tabung longgar · penempatan penguat · pelapisan PE
- Batas referensi
- Tidak ada pelintiran SZ dan tidak ada pelindung pita baja pada rute referensi ini
Panorama lebar penuh · tidak ada peralatan yang dipotong
Baca kabel tabung pusat kompak dari dalam ke luar.
Buka tampilan terurai, pilih komponen, dan lihat tahap produksi mana dari tiga tahap yang mempersiapkan, membentuk, atau mengintegrasikannya menjadi kabel oval kecil GYXTPY yang selesai.
01
Referensi terpasang
Tiga tahap membentuk kabel referensi GYXTPY.
Pilih lapisan di atas untuk menyoroti tahap yang menyiapkan, membentuk, atau mengintegrasikannya.
Tinjau konfigurasi produksi untuk lapisan kabel yang dipilih.
Pilihan lapisan kabel dari Bagian 02 dibawa ke sini. Tinjau tahap produksi yang dipetakan, lalu periksa rute referensi tiga tahap GYXTPY yang lengkap.
HK-235
Pewarnaan dan penggulungan ulang serat optik
Siapkan dan identifikasi serat optik sebelum pembentukan tabung longgar sentral.
- Input
- Serat optik telanjang yang dikonfirmasi pembeli
- Output
- Serat optik berwarna dan telah digulung ulang
- Posisi rute
- Tahap 01 · Hulu dari pembentukan tabung longgar
Siapkan serat optik berwarna
Siapkan input serat optik yang disetujui untuk tahap tabung longgar sentral.
Persiapan serat optik
Tahap ini mencakup fungsi pewarnaan referensi dan pemutaran ulang sebelum pembentukan tabung longgar.
Spesifikasi dan format penanganan serat
Konfirmasi jenis serat, urutan warna, jumlah, dan format reel sesuai persyaratan proyek.
Jumlah mesin, dimensi, kinerja, sistem pendukung, dan susunan akhir dikonfirmasi berdasarkan konstruksi kabel dan persyaratan proyek.
Lihat rute produksi kabel tabung pusat GYXTPY beroperasi.
Video proses HONGKAI ini memberikan referensi visual praktis untuk rute kabel tabung pusat GYXTPY. Gunakan untuk meninjau urutan mesin dan aliran material bersama konfigurasi referensi tiga tahap di atas.
Define the GYXTPY project boundary before the route is finalized.
Rute tiga tahap di atas adalah konfigurasi referensi, bukan cakupan pasokan kontraktual. Tanggung jawab pembeli, HONGKAI, dan bersama menjadi final hanya dalam proposal teknis atau perjanjian yang disetujui.
Tidak ada yang di bawah ini dianggap termasuk, dikeluarkan, disediakan pembeli, atau disediakan HONGKAI- sampai dikonfirmasi secara tertulis.
Membuka grup hanya menampilkan detailnya; tidak mengonfirmasi lingkup.
01 Pembeli menyiapkan Tanggung jawab pembeli Informasi proyek, produk, dan lokasi untuk tinjauan teknis 4 items
Informasi HONGKAI harus ditinjau sebelum menetapkan rute produksi dan konfigurasi peralatan referensi.
- Gambar kabel dan persyaratan produk target untuk ditinjau Untuk dikonfirmasi
- Bahan awal, grade, dan format pasokan Untuk dikonfirmasi
- Ruang pabrik, utilitas, akses, dan kondisi pemasangan Untuk dikonfirmasi
- Informasi peralatan yang ada dan antarmuka hulu/hilir Untuk dikonfirmasi
02 Didefinisikan dalam proposal tertulis Tanggung jawab HONGKAI Konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip 4 items
HONGKAI menentukan konfigurasi yang direkomendasikan dan batasan pasokan yang dikutip setelah meninjau input proyek yang tersedia.
- Rute produksi yang direkomendasikan dan konfigurasi peralatan referensi Untuk dikonfirmasi
- Daftar peralatan yang dikutip dan batasan sumber peralatan Untuk dikonfirmasi
- Antarmuka yang diperlukan untuk peralatan yang dikutip Untuk dikonfirmasi
- Lingkup dokumentasi, commissioning, pelatihan, dan pascapenjualan yang dinyatakan dalam proposal Untuk dikonfirmasi
03 Dikonfirmasi bersama Konfirmasi bersama Antarmuka teknis, penerimaan, dan koordinasi proyek 4 items
Antarmuka teknis, penerimaan, dan koordinasi proyek memerlukan konfirmasi tertulis dari kedua tim proyek.
- Rute proses akhir dan konfigurasi peralatan Untuk dikonfirmasi
- Tata letak, pembagian antarmuka, dan kondisi kesiapan lokasi Untuk dikonfirmasi
- Kriteria penerimaan, kondisi pengujian, dan metode pengambilan sampel Untuk dikonfirmasi
- Jadwal pengiriman, pemasangan, uji coba, perubahan, dan penandatanganan akhir Untuk dikonfirmasi
Tentukan masukan yang diperlukan untuk meninjau rute produksi GYXTPY.
Pilih topik perencanaan yang siap Anda diskusikan selama tinjauan teknis pertama. Pemilihan menandai topik tinjauan saja; tidak mengesahkan nilai teknis, jumlah peralatan, grade bahan, target kinerja, atau lingkup pasokan.
Tinjau referensi GYXTPY yang tersedia dan hal-hal yang masih perlu dikonfirmasi.
Gambar-gambar ini menggambarkan tahap HK-235, HK-50, dan HK-90 yang dipetakan ke rute GYXTPY saat ini. Ini adalah visual referensi, bukan daftar peralatan akhir, tata letak pabrik, komitmen kinerja, atau catatan penerimaan.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-235 fiber preparation reference
Peralatan referensi untuk mempersiapkan serat optik berwarna sebelum ekstrusi tabung longgar. Jumlah serat akhir, jumlah unit, antarmuka payoff, dan persyaratan operasi tetap spesifik proyek.
Gambar tahap produksi ini hanya menggambarkan arah perencanaan tiga tahap saat ini. Jumlah, urutan, dimensi, pasokan, kinerja, dan penerimaan peralatan akhir ditentukan hanya oleh kesepakatan teknis yang disetujui bersama.
Perspektif pelanggan terhadap rute produksi tiga tahap GYXTPY.
The feedback focuses on the compact small-oval construction, connected stage handoffs, material inputs and the project-planning boundary. HK-235 → HK-50 → HK-90
For the GYXTPY Cable Production Line, the three-stage route made the project easier to review. We could follow fiber preparation, jelly-filled central-tube extrusion and the final parallel-strength-member sheathing stage as one connected process.
Starting from the small-oval cable drawing helped our team focus on fiber count, PBT tube dimensions, filling compound, strength-member material and finished sheath geometry before discussing equipment scope.
The planning checklist kept tooling, reel sizes, utilities, workshop layout, inspection points and acceptance conditions visible. That gave us a practical basis for reviewing the final GYXTPY configuration.
Names, roles and photos follow existing HONGKAI customer records. The GYXTPY-specific wording summarizes the technical priorities represented in these small-oval central-tube project perspectives.
Clarify the GYXTPY route before requesting a proposal.
These answers connect the small-oval central-tube construction to the three-stage reference route and the inputs needed for engineering review.
Konstruksi kabel apa yang menjadi dasar rute GYXTPY ini?
The reference cable places colored optical fibers and filling compound inside one central PBT loose tube. Two parallel steel-wire or FRP strength members sit beside the tube, and a PE sheath forms the compact small-oval profile. Final dimensions and material grades must follow the approved cable drawing.
Mengapa rute referensi menggunakan tiga tahap produksi?
HK-235 prepares the fiber input, HK-50 extrudes the jelly-filled central PBT loose tube, and HK-90 positions the two parallel strength members before forming the small-oval PE sheath. The stage boundaries keep material inputs and equipment interfaces visible during review.
Apakah tahap persiapan serat HK-235 selalu diperlukan?
Not always. A project may begin at HK-50 when qualified colored fibers arrive in the required package and are ready for loose-tube production. If coloring, rewinding or payout-package preparation is needed, the HK-235 stage should be reviewed with the fiber input data.
Bagaimana kita memilih kawat baja atau FRP untuk anggota kekuatan paralel?
The approved cable specification determines the strength-member material, diameter, spacing and supply package. These inputs affect payoff design, positioning guides, extrusion tooling and the finished small-oval geometry, so they must be reviewed before the line is fixed.
Apakah HK-235, HK-50 dan HK-90 merupakan konfigurasi peralatan akhir?
Tidak. Mereka mengidentifikasi tahapan proses referensi. Format final payoff dan take-up, peralatan, kontrol, pendinginan, pengukuran, utilitas, tata letak lini, dan sistem opsional ditentukan setelah tinjauan desain kabel, paket material, target output, dan kondisi pabrik.
Apakah peralatan yang sudah ada atau bahan yang disediakan pembeli dapat diintegrasikan?
Berpotensi, tergantung pada tinjauan antarmuka. HONGKAI harus memeriksa dimensi paket, rentang tegangan, tinggi lini, sinyal kontrol, utilitas, kondisi operasi, dan tes yang diperlukan sebelum peralatan yang ada atau bahan yang disediakan pembeli memasuki rute yang diusulkan.
Informasi apa yang diperlukan untuk proposal lini akhir?
Silakan berikan desain kabel, jumlah serat, dimensi tabung dan selesai, daftar material, pilihan elemen penguat, target output, ukuran gulungan, tata letak pabrik, utilitas yang tersedia, campuran produk, dan jadwal proyek. Item yang tidak diketahui dapat diidentifikasi untuk tinjauan teknis.
Bagaimana definisi inspeksi, FAT, pemasangan, dan pelatihan?
Titik inspeksi, sampel, bahan uji, kondisi FAT, kriteria penerimaan, dokumentasi, instalasi, commissioning, pelatihan, dan tanggung jawab di lokasi dituliskan dalam proposal proyek dan perjanjian komersial untuk dikonfirmasi oleh kedua tim.
Konstruksi kabel akhir, peralatan, kinerja, kriteria penerimaan, dan cakupan pasokan ditentukan dalam perjanjian teknis dan komersial yang ditandatangani.
Rencanakan proyek produksi kabel GYXTPY Anda.
Bagikan desain kabel oval kecil, jumlah serat, dimensi tabung pusat, senyawa pengisi, pilihan elemen penguat, output yang direncanakan, dan kondisi pabrik. HONGKAI akan meninjau rute tiga tahap, antarmuka peralatan, dan item teknis terbuka sebelum menyusun proposal khusus proyek.
Apa yang akan ditinjau HONGKAI
- Rencana produk target
- Kelompok kabel, konstruksi, jumlah serat, dan persyaratan material
- Rute proses
- Bahan awal, proses yang diperlukan, dan antarmuka peralatan
- Target kapasitas
- Campuran produk, output yang diharapkan, dan kecepatan garis target
- Kondisi pabrik
- Ruang tersedia, utilitas, peralatan yang ada, dan kebutuhan pengujian
- Tahap proyek
- Perencanaan, penganggaran, persiapan pabrik, atau ekspansi produksi
- Status tinjauan
- Penilaian awal · Diperlukan konfirmasi teknis
Apa yang perlu disiapkan · item 6
- Jenis kabel target, sampel referensi, atau gambar yang tersedia
- Jumlah serat, struktur kabel, dan persyaratan material
- Bahan awal dan proses produksi yang diperlukan
- Target output, product mix atau kecepatan lini yang diharapkan
- Peralatan yang ada, ukuran reel, dan tata letak pabrik yang tersedia
- Utilitas, persyaratan pengujian, dan jadwal proyek yang direncanakan
Belum ada spesifikasi lengkap? Bagikan produk target dan asumsi saat ini Anda. Nilai yang tidak diketahui dapat dijelaskan sebagai input teknis terbuka.
Informasi yang diserahkan di sini mendukung tinjauan teknis awal. Konfigurasi peralatan akhir, kinerja, harga, jadwal pengiriman, dan cakupan pasokan hanya dikonfirmasi dalam proposal atau perjanjian yang disetujui.
Ringkasan Proyek Produksi Kabel Serat Optik
Katakan kepada kami produk kabel yang direncanakan, kapasitas target, dan tahap investasi saat ini. Informasi sebagian pun diterima, dan Anda dapat mengunggah gambar kabel bila tersedia.