ASU Cable Production Line for Central Loose-Tube Aerial Cable

What does this production route produce? This reference solution is for ASU (auto-supporting unitube) aerial optical cable with one central loose tube and two dielectric FRP strength members. When approved pre-colored fiber is supplied, HK-50 forms the jelly-filled PBT loose tube. The HK-90 ASU line then positions the FRP members, integrates the ripcord and applies the PE outer sheath. Final cable construction, span class, materials and equipment scope follow the approved cable drawing and target-market requirements. Brazil is a major market for HONGKAI's ASU production-line projects; each proposal is still matched to the approved cable design, target span and local project requirements.

উৎপাদন পথ
HK-50 → HK-90 ASU
নিয়ন্ত্রণ পদ্ধতি
Coordinated controls reviewed for each production stage
মূল প্রক্রিয়াগুলি
PBT loose-tube extrusion · dual-FRP positioning · ASU forming · PE sheathing
উপযুক্ত কেবল পরিসর
ASU central loose-tube aerial cable · two parallel FRP members · span and final design confirmed per project
02 ASU cable anatomy

Read the ASU cable from the inside out.

Open the new exploded view, select a component, and see which of the two core production stages forms or integrates it into the finished all-dielectric aerial cable.

Engineering exploded-view plate Reference central loose-tube ASU construction
ASU fiber optic cable 3D structure showing the central loose tube and two parallel FRP strength members 01 Assembled reference
Overview · switch views without leaving this section All cable components remain visible while excess white margin is reduced.
Structure-to-process route

Two core stages form the reference ASU cable.

Select a layer above to highlight the stage that prepares, forms or integrates it.

01HK-50 · Loose-tube extrusionForm the jelly-filled PBT loose tube around colored fibers.
02HK-90 ASU · SZ forming + sheathPosition two FRP rods and the ripcord, then extrude the PE jacket.
Reference boundary: this generated exploded render explains the layer relationship, not a final manufacturing drawing. The generated image is a structure explainer; confirm fiber count, jelly system, FRP diameter and spacing, ripcord position, jacket material and all dimensions against the approved cable drawing.
03 রেফারেন্স কনফিগারেশন

Review the production configuration for the selected cable layer.

The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete two-stage ASU reference route.

Carried from cable structure No cable layer selected Start from the cable structure above, or review the full reference route below.
Choose a cable layer
রেফারেন্স উত্পাদন লাইনের ছবি Reference image · Project-specific layout
HONGKAI HK-50 PBT loose-tube production line used as the first core ASU production stage
Selected stage image PBT loose-tube production
রেফারেন্স রুট শুরু

HK-50

PBT loose-tube production

Combine colored fibers, filling compound and PBT material into the required central loose tube.

ইনপুট
Approved colored optical fibers + filling compound + PBT
আউটপুট
Jelly-filled PBT loose tube
রুট অবস্থান
Stage 01 · Central loose-tube formation
রেফারেন্স উত্পাদন পর্যায়
প্রক্রিয়া ভূমিকা

Form the jelly-filled PBT loose tube

Control fiber pay-off, filling-compound metering, PBT extrusion, cooling and take-up.

রেফারেন্স পরিসর

Fiber feeding · jelly filling · PBT extrusion

This stage forms the single loose tube used at the center of the reference ASU construction.

প্রস্তাবের আগে নিশ্চিত করুন

Fiber count, tube geometry and material system

Confirm fiber count, fiber input format, tube dimensions, PBT grade and filling compound.

Reference route only. Final equipment scope follows the approved cable drawing.

মেশিনের পরিমাণ, মাপ, কর্মক্ষমতা, সহায়ক সিস্টেম এবং চূড়ান্ত বিন্যাস কেবল নির্মাণ এবং প্রকল্পের প্রয়োজনীয়তা থেকে নিশ্চিত করা হয়।.

03B Stage 02 process video

See the ASU-specific downstream production line in operation.

This official HONGKAI video demonstrates the HK-90 ASU-specific downstream line. It gives buyers a practical view of Stage 02 after the central PBT loose tube has been completed on HK-50.

HONGKAI video · ASU Stage 02 process reference ইউটিউবে দেখুন
Reference boundary: the video shows an ASU HK-90-specific forming and sheathing process, but it does not confirm the final machine quantities, arrangement, capacity, interfaces, supplied scope, acceptance result or project performance. If the embedded player is unavailable, use "Watch on YouTube" above.
04 প্রকল্পের দায়িত্ব

Define the ASU project boundary before the route is finalized.

The two-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.

পরিসরের অবস্থা প্রকৌশল পর্যালোচনা প্রয়োজন

Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.

দায়িত্ব ম্যাট্রিক্স Review all three responsibility groups

Opening a group only reveals its details; it does not confirm scope.

Buyer prepares Buyer responsibility পরওজেইসিটি, প্রোডাক্টটিরওদুটিইনস্ট্রুমেন্টেশনসিটি একটিঅ্যান্ডসিটি সিস্টেমযাতৈরি ইনফর্মেশনইনফরম্যাটিওন ফরইনফর্মেশনএবংইনস্ট্রুমেন্টেশনইনফরইনফর্মেশন ফর ইনফর্মেশন এনজিনিয়ারিংইনফর্মেশনএবংইনফর্মেশন ইনফর্মেশনইনইরিংইনইনফর্মেশনএবং রিভিউইয়েওয়েইআছেওয়ে 4 items

Information HONGKAI must review before fixing the production route and reference equipment configuration.

  • Target cable drawing and product requirements for review নিশ্চিত করা হবে
  • Starting materials, grades and supply formats নিশ্চিত করা হবে
  • Factory space, utilities, access and installation conditions নিশ্চিত করা হবে
  • Existing equipment and upstream/downstream interface information নিশ্চিত করা হবে
Defined in the written proposal HONGKAI responsibility Recommended configuration and quoted supply boundary 4 items

HONGKAI defines the recommended configuration and quoted supply boundary after reviewing the available project inputs.

  • Recommended production route and reference equipment configuration নিশ্চিত করা হবে
  • Quoted equipment list and equipment-source boundary নিশ্চিত করা হবে
  • Required interfaces for the quoted equipment নিশ্চিত করা হবে
  • Documentation, commissioning, training and after-sales scope stated in the proposal নিশ্চিত করা হবে
একসাথে নিশ্চিত করা হয়েছে যৌথ নিশ্চিতকরণ Technical interfaces, acceptance and project coordination 4 items

Technical interfaces, acceptance and project coordination require written confirmation from both project teams.

  • Final process route and equipment configuration নিশ্চিত করা হবে
  • Layout, iনতেরফ্যাক্টরিতেএকটিস্প্লিটযা স্প্লিটপদ্ধতিতেঅ্যান্ডসাইটেস্থাপনকরাহয়এবংসাইটেস্থাপনসাইটেস্থাপন-রিয়েডিনেশনপ্রক্রিয়ায়ব্যবহৃতহয়এবংসাইটেস্থাপনকরাহয়সাইটেস্থাপন কন্ডিটরগুলোসাইটেস্থাপনকরাহয়এবংসাইটেস্থাপনকরা নিশ্চিত করা হবে
  • গ্রহণযোগ্যতা মাপদণ্ড, পরীক্ষার শর্ত এবং নমুনা পদ্ধতি নিশ্চিত করা হবে
  • Delivery, installation, trial schedule, changes and final sign-off নিশ্চিত করা হবে

05 পরিকল্পনার ইনপুট

Identify the inputs needed to review the ASU production route.

Select the planning topics you are ready to discuss during the first engineering review. A selection marks a review topic only; it does not approve a technical value, equipment quantity, material grade, performance target or supply scope.

পর্যালোচনার জন্য উৎপাদন লাইন পরিকল্পনা বিষয়গুলি নির্বাচন করুন
06 রেফারেন্স এবং যাচাইকরণ

Review the available ASU references and what still needs confirmation.

These images illustrate the HK-50 and HK-90 ASU stages mapped to the current ASU route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.

অনুচ্ছেদ 05-এর প্রেক্ষাপট এগিয়ে নেওয়া হয়েছে HK-50 loose-tube extrusion → HK-90 ASU dual-FRP positioning, SZ forming and PE sheathing

No planning topics selected yet. Return to Section 05 to add review priorities.

Reference image of the HK-50 PBT loose-tube production line used for the first ASU production stage
Stage 01 reference
Not final arrangement
Reference available

HK-50 PBT loose-tube line reference

Reference line for forming the central jelly-filled PBT loose tube. Final fiber input, filling system, active positions, tube geometry and operating requirements remain project-specific.

These production-stage images illustrate the current two-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.

Selected ASU production-stage reference image
Stage 01 reference

HK-50 PBT loose-tube line reference

1 of 2
Brazil ASU customer feedback

What Brazil customers value in an ASU project discussion.

Brazil is a strong market for HONGKAI's ASU production-line projects. The feedback below has been edited by HONGKAI to reflect customer-approved project experience and the facts supported by the public project records. HK-50 → HK-90 ASU

07 Route FAQ

Clarify the route before requesting a proposal.

These answers define the ASU reference route, what the supplied images can demonstrate, and what still requires project confirmation.

এই রেফারেন্স রুটটি কোন ASU কেবল নির্মাণের উপর ভিত্তি করে?

The reference construction uses colored optical fibers in one jelly-filled PBT loose tube, exactly two parallel FRP strength rods, one ripcord and a black PE outer sheath. Fiber count, water-blocking design, dimensions, FRP spacing, span class and material grades must follow the approved cable drawing and the target-market requirements.

দুই-পর্যায়ের পথটি পূর্ব রঙিন অপটিক্যাল ফাইবার ধরে নেয়?

Yes. The core ASU route shown here begins at HK-50 with approved colored fibers in the required package. If the project starts from bare fiber, an upstream coloring and rewinding stage can be evaluated separately from this two-stage core route.

কেন পৃষ্ঠাটিতে দুটি কোর উৎপাদন পর্যায় দেখানো হচ্ছে?

HK-50 forms the central jelly-filled PBT loose tube. The dedicated HK-90 ASU line then coordinates loose-tube feeding, two parallel FRP pay-offs, the project-specific forming and binding arrangement, ripcord placement, PE extrusion, cooling, measurement, accumulation and take-up.

HK-50 এবং HK-90 ASU কি চূড়ান্ত সরঞ্জাম কনফিগারেশন?

No. They are reference production-stage models used to explain the process route. Final module quantities, dimensions, controls, utilities, optional systems and equipment interfaces are confirmed only after reviewing the cable drawing, materials, capacity target and factory conditions.

বিদ্যমান সরঞ্জাম বা ক্রেতাকর্তৃক সরবরাহিত উপকরণগুলি একীভূত করা যাবে কি?

Potentially, subject to technical review. HONGKAI must confirm material package sizes, tension ranges, line interfaces, control signals, dimensions, utilities, operating conditions and required tests before existing equipment or buyer-supplied materials are included in the proposed route.

লাইন স্পিড এবং উৎপাদন ক্ষমতা নিশ্চিত করতে কোন তথ্য প্রয়োজন?

Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target stable output, reel sizes, shift pattern, available utilities, factory layout and project schedule. Span class is a finished-cable design and validation result, not a fixed machine parameter. This page does not assume a standard project capacity or a universal 90 m/min result.

মেশিনের ছবি এবং প্রক্রিয়ার ভিডিও কি চূড়ান্ত সরবরাহ করা সরঞ্জাম?

No. The images illustrate the HK-50 and HK-90 ASU reference stages. The related ASU video demonstrates the dedicated downstream line; it is not a final arrangement, a performance result or an acceptance record.

পরীক্ষা, FAT, ইনস্টলেশন এবং প্রশিক্ষণ কি অন্তর্ভুক্ত?

Name the target cable standard or customer specification first. Inspection points, FAT sample conditions, finished-cable tests, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Cable-standard compliance depends on the approved design, qualified materials, process validation and finished-cable testing; it is not a certification of the machine itself.

এফআইএনএএল সিএবিএলই সিওএনএসটিআরইউসিটিআইওএন, পিইআরএফওআরএমএএনসিই, ইকুইপমেন্টটিযাআপনারপ্রয়োজন। অ্যাকসেপ্টেডক্রাইটেরিয়া। একটিঅত্যাধুনিকক্রাইটেরিয়াযাপ্রতিযোগিতামূলকদামেউপলব্ধ। ক্রাইটেরিয়াটিসঠিকভাবেকাজকরে। এটিআপনারজন্য একটিএবং সুপারসহজউপায়যারমাধ্যমেআপনিস্কোপপেতেপারেন। এটিআপনারজন্যঅপেক্ষাকৃতসহজএবং নির্দিষ্টফিচারগুলোযুক্তযাআপনারপ্রয়োজন। এটিঅনলাইনেউপলব্ধযা আপনারজন্য থেকেমাত্র কয়েকমিনিটসময়নেবে। এটিঅত্যন্তসহজ এবংপ্রয়োজনীয়অ্যাপ্রোভডপ্রক্রিয়াগুলোঅনুসরণকরেযাআপনার থেকেসময়সাশ্রয়করবে। এটিঅত্যন্তকার্যকর একটিএবং কম্পিটিটিভদামেউপলব্ধকম্পোনেন্টগুলোযাআপনারপ্রয়োজন। এগুলোঅত্যন্তগুণমানসম্পন্নএবংযুক্তিসঙ্গতদামেপাওয়াযায়। এটিএকটিদারুণবিকল্প__。.

08 বিনিয়োগ জিজ্ঞাসা

আপনার ফাইবার অপটিক্যাল ক্যাবল উৎপাদন বিনিয়োগ পরিকল্পনা করুন।.

আপনার লক্ষ্য ক্যাবল পরিবার, পরিকল্পিত ক্ষমতা, কারখানার অবস্থা এবং বর্তমান প্রকল্পের পর্যায় শেয়ার করুন। HONGKAI প্রক্রিয়া রুট, সরঞ্জাম পরিসর, সিস্টেম ইন্টারফেস এবং খোলা প্রযুক্তিগত বিষয়গুলি পর্যালোচনা করবে এবং তারপরে প্রকল্প-নির্দিষ্ট প্রস্তাব প্রস্তুত করবে।.

Current page context ASU central loose-tube aerial cable · HK-50 → HK-90 ASU reference route This context accompanies the enquiry as a reference. It does not confirm the final production route or equipment configuration. Planning inputs remain open · No supporting stage carried forward

HONGKAI কী পর্যালোচনা করবে

লক্ষ্য পণ্য পরিকল্পনা
Cable families, constructions, fiber counts and material requirements
প্রক্রিয়া পথ
শুরুর উপাদান, প্রয়োজনীয় প্রক্রিয়া এবং সরঞ্জাম ইন্টারফেস
ক্ষমতা লক্ষ্য
পণ্য মিশ্রণ, প্রত্যাশিত আউটপুট এবং লক্ষ্য লাইন গতি
কারখানার অবস্থা
উপলব্ধ স্থান, ইউটিলিটি, বিদ্যমান সরঞ্জাম এবং পরীক্ষার প্রয়োজনীয়তা
প্রকল্পের পর্যায়
পরিকল্পনা, বাজেট নির্ধারণ, কারখানা প্রস্তুতি বা উৎপাদন বিস্তার
Review status
Preliminary assessment · Technical confirmation required
প্রস্তুতির জন্য কী প্রয়োজন · 6 আইটেম
  • লক্ষ্য কেবল প্রকার, রেফারেন্স নমুনা বা উপলব্ধ ড্রয়িং
  • ফাইবার সংখ্যা, কেবল গঠন এবং উপাদানের প্রয়োজনীয়তা
  • শুরুর উপাদান এবং প্রয়োজনীয় উৎপাদন প্রক্রিয়া
  • লক্ষ্য আউটপুট, পণ্য মিশ্রণ বা প্রত্যাশিত লাইন গতি
  • বিদ্যমান সরঞ্জাম, রিল আকার এবং উপলব্ধ কারখানার বিন্যাস
  • ইউটিলিটি, পরীক্ষার প্রয়োজনীয়তা এবং পরিকল্পিত প্রকল্পের সময়সূচী

No complete specification yet? Share your target products and current assumptions. Unconfirmed items can remain “To be confirmed”.

এখানে জমা দেওয়া তথ্যটি একটি প্রাথমিক প্রযুক্তিগত পর্যালোচনার সমর্থন করে। চূড়ান্ত সরঞ্জাম কনফিগারেশন, কর্মক্ষমতা, মূল্য, ডেলিভারি সময়সূচী এবং সরবরাহ পরিসর শুধুমাত্র অনুমোদিত প্রস্তাব বা চুক্তিতে নিশ্চিত করা হয়।.

বিনিয়োগ প্রকল্পের সংক্ষিপ্তসার

ফাইবার অপটিক কেবল উৎপাদন প্রকল্পের সংক্ষিপ্তসার

আপনার পরিকল্পিত কেবল পণ্য, লক্ষ্য ক্ষমতা এবং বর্তমান বিনিয়োগ পর্যায় আমাদের জানান। আংশিক তথ্য স্বাগতম, এবং উপলব্ধ হলে আপনি একটি কেবল ড্রয়িং আপলোড করতে পারেন।.

যোগাযোগের প্রেক্ষাপট

ক্যাবল এবং প্রয়োগ

প্রকল্প পরিসর

ফাইলগুলি টেনে আনুন, আপলোডের জন্য ফাইল নির্বাচন করুন
যদি উপলব্ধ হয় তবে একটি কেবল ড্রয়িং, পণ্য নমুনার ছবি বা প্রযুক্তিগত স্পেসিফিকেশন আপলোড করুন।.

উদ্ধৃতি জন্য জিজ্ঞাসা করুন

আমরা আপনাকে 24 ঘন্টার মধ্যে উত্তর দেব!!!