HONGKAI Máquinas para Cabos
Pedro Ele.
Diretor de Vendas Internacionais e Projetos
Dos requisitos do cabo
para um plano de produção claro.
Ajudo fabricantes de cabos internacionais a conectar seu produto-alvo, processo de produção e escopo de equipamentos.
Com sede na China · Working internationally

Onde posso apoiar o seu projeto.
Meu trabalho começa com o cabo que você deseja fabricar e as condições da sua fábrica.
I coordinate requirement clarification, equipment configuration and technical-commercial proposals, then follow delivery preparation and after-sales communication with the relevant teams.
Veja como trabalhamos juntos ↓Cabo de fibra óptica
Coloring, loose tube, SZ stranding, reinforcement and sheathing.
Cabo LAN
Insulation extrusion, pair twisting, cabling and sheath extrusion.
Cabo de baixa tensão
Conductor processing, stranding, insulation and production-line integration.
Across these projects: layout, utilities, equipment interfaces, spare parts and ongoing coordination.
Working together
A clear next step.
At every project stage.
Select a stage to see what we clarify together.
What cable do you want to produce?
A cable drawing, product specification or target application gives us a useful starting point.
- Clarify cable structure, materials and required performance
- Identify the relevant manufacturing route
- List the information that still needs confirmation
Next working document A product brief and open technical questions.
Which equipment fits the production route?
Once the target products are clearer, we connect the process stages with your factory conditions.
- Review product range, output target and materials
- Connect machine scope, interfaces and utilities
- Discuss layout limits and future expansion
Next working document A preliminary equipment scope for technical review.
What should the proposal actually include?
The configuration needs clear responsibilities and supporting technical and commercial documents.
- Align equipment inclusions and supply boundaries
- Clarify factory preparation and acceptance requirements
- Prepare the proposal around the confirmed scope
Next working document A technical-commercial proposal for discussion.
How does the agreed scope move forward?
Project coordination continues through manufacturing, factory checks and delivery preparation.
- Follow manufacturing progress and factory acceptance
- Coordinate packing, shipment and installation preparation
- Conectar dúvidas pós-venda à equipe responsável
Next working document Project progress, preparation and follow-up records.
Equipment selection starts with the target cable and confirmed factory requirements.
Converse sobre seu projeto ↗Enraizado no chão de produção.
Factory, equipment and installation context from HONGKAI's work.
↗
↗
↗Technical answers.
Better prepared conversations.
I write about the questions that arise when selecting cable machinery, understanding processes and planning a factory.
Selected technical guides by Peter He
Browse all technical guides ↗How I prepare and review technical content +
Topics begin with recurring customer and project questions. Machine data is checked against available technical documentation, and questions that need engineering confirmation are referred to the relevant team.
Articles help prepare a useful discussion. The final equipment configuration and acceptance criteria depend on the confirmed project scope. Content is reviewed when equipment or project practices change.
What cable do you
want to make?
Share your starting point. We can clarify the process, equipment scope and questions to resolve next.
Converse sobre seu projeto ↗peterhe@hkcablemachine.com








