PROCESS ROUTE

Make the profile match the cable construction

Extrude and collect the plastic cross separator used by a specified LAN cable construction. Match the profile tooling, material, cooling and receiving package to the separator drawing and its downstream cabling feed.

This line is relevant when the approved LAN cable drawing requires a cross separator and the factory plans to manufacture that profile. The starting point is the actual cross section, material and tolerance. Tooling, temperature control, cooling and take-up should be reviewed as a connected profile-production route. Its receiving reel must also suit separator feeding at the cabling stage. A separator-production line and the separator feed on the assembly machine are different parts of the factory scope.

Incoming material

Approved separator compound and profile drawing

Finished output

Reeled cross separator for cable-core assembly

Select by

Profile dimensions, material and feed package

Line scope

Confirmed from the approved cable drawing and project inputs

Cross-shaped separator profile for four-pair CAT6 UTP cable
CAT6 cable cross-section with a separator. Use the actual drawing to confirm whether your cable requires one.

A separator profile serves the cable construction

The cross-section reference shows why the separator belongs in the cable drawing. Specify its profile, dimensions and material, then match its receiving package to the cabling feed arrangement.

Follow the production process

STAGE 01

Define the separator

Provide the actual profile drawing and compound. Confirm the separator dimensions and its position in the cable core before selecting extrusion tooling.

STAGE 02

Extrude and cool the profile

Coordinate material feeding, profile tooling, temperature control and cooling with the required profile dimensions.

STAGE 03

Collect for the cabling stage

Specify haul-off, length measurement, storage and take-up. The finished separator package must match the selected cabling feed arrangement.

What a well-defined line gives your project

A profile tied to the cable drawing

Use the required separator geometry and orientation as selection inputs. This connects the extrusion tooling to the core that will receive the profile.

A visible material-transfer interface

Specify storage, take-up and cabling pay-off packages together. The separator becomes an identified incoming material for assembly.

A profile-specific working target

Assess output with the selected compound, tooling and cooling arrangement. This creates a production basis for that profile rather than an assumption from the model name.

03

LINE EQUIPMENT

Equipment duties and configuration

Review each module by its function and the project input it needs. Use the documented arrangement as a configuration reference.

Separator extruder with pellet hopper, profile die, PLC cabinet and the start of the cooling trough
Separator-line arrangement. Profile tooling, auxiliaries and layout are project specific.

Review the separator extrusion arrangement

Connect compound feeding, profile tooling, cooling, haul-off and collection around the selected separator. The receiving package must work with the downstream cabling operation.

Material feeding and project-selected drying

Supply the approved profile compound and identify any material-preparation or drying duty. Confirm which equipment and material responsibilities are included.

Profile extruder and cross-separator tooling

Form the selected cross section with the extruder and profile tooling. Use the actual separator drawing and tolerances to define the tooling duty.

Temperature and line controls

Identify the temperature and line-control requirements for the selected material and profile. Document the working basis to be reviewed during acceptance.

Cooling and drying arrangement

Specify the cooling and drying arrangement around the extruded geometry. Review the required water interfaces and handling of the profile.

Agreed profile or dimensional inspection

The reference includes a laser diameter gauge. Check the actual cross-section dimensions and profile tolerances with an agreed inspection method; a diameter reading alone does not establish every dimension of a cross separator.

Haul-off, length counting and separator take-up

The documented downstream route uses a 400 mm double-wheel capstan, a 9 m accumulator with electronic meter counting, and dual-shaft take-up for 400-630 mm reels. Match the collected separator to the cabling feed.

Configuration reference

HK-50 PLC cross-separator reference

  • 50 mm main screw, L/D 26:1; documented screw range 10-110 rpm.
  • 25 kg dryer/loader, PLC and HMI line control, and separator profile tooling.
  • 1.5 m movable warm-water trough plus 8 m fixed cooling; laser diameter gauge.
  • 400 mm double-wheel capstan, 9 m accumulator with meter counter, and dual-shaft take-up for 400-630 mm reels.

The reference project lists 120 m/min for separator production. A separate 450 m/min equipment/design figure is not the working guarantee for every cross profile. Confirm the compound, drawing and acceptance point.

Choose the configuration route

Cable drawing requires a separator
Define its cross section, compound, orientation and receiving package. Use those inputs to review the extrusion and cabling-feed scopes.

Separator is sourced externally
The assembly line still needs a defined feed package and handling interface. Confirm that interface even when profile extrusion is outside the equipment order.

Different separator profiles
Provide each proposed profile and material. Review tooling, cooling, changeover and the working basis for each rather than assuming one model covers every geometry.

04

FACTORY INPUTS

Define the line before comparing quotations

Use the same cable, material and receiving-package requirements when comparing configurations. Unknown items can remain questions for the review.

Your selection brief

Profile drawing
Specify the cross shape, dimensions, tolerance and the required orientation within the cable core.

Material and process
Provide the compound specification, cooling requirements and the working output target for that profile.

Receiving and feeding
Define separator reel dimensions, take-up handling and the interface to the cable-assembly pay-off.

Inputs to include

Cross section

Profile drawing, dimensions, tolerance and orientation in the cable core.

Compound

Exact material specification and preparation requirements.

Tooling scope

Profiles to be produced and the corresponding tooling or changeover duties.

Working target

Required output for the defined profile and material.

Receiving reel

Separator package, storage and cabling pay-off dimensions.

Inspection

Profile-measurement method, samples and acceptance records.

05

SUPPLY SCOPE & QUALITY

Agree supply scope and acceptance

Put the selected equipment, plant interfaces and product-specific checks into the written proposal.

ACCEPTANCE CHECKPOINTS

Checks to agree

  • Agree profile dimensions and the inspection method for the actual cross section.
  • Review cooling and handling against the separator geometry.
  • Check the assembled cable construction and its electrical acceptance separately.

SUPPLY BOUNDARY

Scope to confirm

Separator extrusion prepares an upstream material stream. The separator feed at the cabling machine is a separate interface that must also appear in the complete factory proposal.

Define the acceptance sequence

Trial basis

Agree the profile drawing, compound and tooling for the representative separator trial.

Line and product checks

Review dimensions, cooling, handling and the receiving package at the selected operating point.

Records and transfer

Record the profile results and its cabling-feed interface; define assembled-cable electrical acceptance in the full cable project.

07

REFERENCE PRICING

Plan your equipment budget

Review the EXW reference price for the named configuration, then request a quotation against your cable drawing, output target and required supply scope.

HK-50 cross-separator extrusion configuration

USD 27,500

Per reference line

EXW. Taxes excluded.

Confirm your quotation scope

The documented 50 mm separator-profile extrusion arrangement.

Prices are in USD on an EXW basis and exclude taxes. They apply to the named reference configurations. Final price and validity depend on the agreed equipment, tooling, auxiliaries and project requirements.

Confirm the supply boundary and delivery arrangements in the quotation.

08

CUSTOMER FEEDBACK

Good value, with one project team

Feedback from Devang Shah on HONGKAI’s LAN cable equipment and one-stop project service for Channeltech Systems in India.

5 / 5
Rated 5 out of 5

Devang Shah

Channeltech Systems
India

1 customer review
LAN cable equipment project

Equipment value and project support

HONGKAI’s LAN cable production equipment offers good value for money. The service is good, and the one-stop solution saved time for our project.

English summary of customer feedback.

09

QUESTIONS BEFORE SELECTION

Questions before selecting the line

Clarify configuration choices, material duties and process boundaries before turning a reference arrangement into an equipment order.

This line manufactures the separator profile. The cabling line assembles the twisted pairs and feeds the separator when required by the cable drawing.

The approved cable construction determines whether one is required. Include the material and equipment route for that specific design.

Confirm the working output with the selected compound, profile tooling, cooling and take-up. A maximum or reference figure is not a profile-specific production guarantee.

It identifies the documented PLC-controlled line and 50 mm main screw. The actual profile, material, tooling, cooling and working target still define the selected configuration.

Confirm its profile and compound specification, receiving package and feed arrangement on the assembly machine. The feed interface remains part of the cable-core route.

Send a separate drawing and material specification for each profile. Identify the required tooling, product mix and changeover duties so the configuration review has a defined basis.

10

PROJECT ENQUIRY

Request a line configuration

LAN Cross-Separator Extrusion Line

Provide the separator cross-section, compound, tolerances, working target and reel drawings. Identify the cabling machine that will receive the separator and whether more than one profile is planned.

Use the review to agree

  • The equipment arrangement and selected configuration route.
  • Incoming material, receiving package and plant interfaces.
  • The working target, supplied instruments and acceptance basis.

Send the information you already have. Mark undecided requirements for discussion rather than guessing a specification.

Send your project requirements

Ask for quote

we will reply you within 24 hours!!!

WhatsApp