GJFV Cable Production Line

What does this production line do? This line applies the aramid-yarn strength package and extrudes the LSZH outer jacket for confirmed GJFV indoor fiber optic cable constructions. Final configuration follows the approved cable drawing and project requirements.

Line model
HK-50
Control system
IPC+PLC Control
Main process
Aramid yarn application and LSZH jacket extrusion
Suitable cable range
GJFV indoor fiber optic cable · Final construction confirmed per project
02 Cable structure → process

Open this GJFV cable and trace every layer to production.

Start with the assembled cable, open the rendered 3D exploded structure, then select a layer to see the process and equipment it affects on the HK-50 line.

Interactive structure preview Reference GJFV construction
Illustrative assembled GJFV cable structure preview
Click the cable to open its structure
Exploded spacing is illustrative; final materials and dimensions require the approved cable drawing. Rendered interaction preview · GLB model pending

The displayed construction uses colored optical fibers directly; it is not a tight-buffered-fiber construction. A different tight-buffered GJFV specification requires an upstream HK-30 line before aramid application and LSZH jacketing on the HK-50. Selecting a layer explains the route; it does not submit or change the customer enquiry.

See the equipment mapped to the selected production step.

The layer selected in Section 02 opens its production step and primary equipment here. Supporting modules used within the same stage remain available for review.

SELECTED IN SECTION 02
Cable layer Choose a layer above Production step Not selected Equipment detail Not selected

Choose one reviewed cable layer in Section 02. This section will then open its mapped equipment automatically.

Change layer in Section 02
RELATED PRODUCTION LINE

GJFV Cable Production Line

HK-50 · IPC+PLC Control · Direct optical-fiber route

Route
One HK-50 final-cable line
Status
Reference configuration · Confirmation required
REFERENCE MODULE · 01 Checking equipment image
MODULE 01 · OPTICAL FIBER INPUT

Reference fiber payoff and tension cabinets

Presents the confirmed optical fiber packages to the HK-50 line at controlled tension.

Supports process
Stage 01 · Optical fiber input
Receives
Buyer-confirmed optical fiber packages
Hands off to
Aramid yarn application stage
Confirm before proposal
Package format, head count and tension range
REFERENCE ONLY

Final payoff interface and quantity require confirmation.

CONFIGURATION BOUNDARY No equipment scope is final until the cable drawing and project inputs are approved.

Confirm fiber count, fiber-package format, aramid construction, LSZH compound, finished diameter, target speed, reel range, utilities and factory layout before issuing the final proposal.

Review project responsibility

Module 1 of 7 selected: Reference fiber payoff and tension cabinets.

03B Related process video

See a similar mini optical-cable extrusion line in operation.

This HONGKAI factory video shows a compact optical-cable extrusion line that is closely comparable to the production route reviewed above. It helps buyers understand the process in motion before the project responsibility and final configuration are defined.

Page reference configuration GJFV Cable Production Line · HK-50 reference route This video demonstrates a comparable mini-line process; it is not the exact HK-50 equipment arrangement shown on this page.
HONGKAI factory video · process reference Watch on YouTube
Video summary: a compact optical-cable extrusion line operating in a factory setting. Audio note: background music only; no configuration information is communicated by sound. This is reference process footage only; the final HK-50 equipment sequence, interfaces, capacity and supply scope require engineering review and written project confirmation.
04 Project responsibility

Define the project boundary before the line is finalized.

The equipment shown above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and shared responsibilities become final only in the approved technical proposal.

Scope status Engineering review required

No item below should be treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.

Responsibility matrix Review all three responsibility groups

Opening a group only reveals its details; it does not confirm scope.

Buyer prepares Buyer responsibility Project and site information for engineering review 4 items

Project and site information HONGKAI must review before fixing the production-line configuration.

  • Approved cable drawing, target performance and input route To be confirmed
  • Raw-material grades, supply format and local availability To be confirmed
  • Utilities, floor space, access and installation conditions To be confirmed
  • Existing upstream and downstream equipment interfaces To be confirmed
HONGKAI defines after review HONGKAI responsibility Quoted configuration and service boundary 4 items

The exact equipment and service package is documented after the product, process and site inputs are reviewed.

  • Recommended process and reference equipment configuration To be confirmed
  • Quoted equipment list and equipment-source boundary To be confirmed
  • Required interfaces for the quoted equipment To be confirmed
  • Documentation, commissioning, training and after-sales scope To be confirmed
Confirmed together Joint confirmation Written interface, acceptance and schedule decisions 4 items

Interface, acceptance and schedule decisions require written agreement from both project teams.

  • Acceptance criteria, test conditions and sampling method To be confirmed
  • Layout and responsibility at each equipment interface To be confirmed
  • Delivery, site-readiness and trial-production schedule To be confirmed
  • Change control and final technical sign-off To be confirmed

05 Planning inputs

Confirm the inputs needed to configure this GJFV line.

Select the planning topics you can discuss during the first engineering review. No technical value, equipment quantity or interface is approved by making a selection here.

Current illustrated route Colored optical fibers → HK-50 GJFV Cable Production Line

This is the direct-fiber route reviewed in Sections 02–03. A tight-buffered GJFV construction is a different route and may require an upstream HK-30 before the HK-50.

Select the production-line planning topics to review
06 Reference & verification

Review the available references and what still needs confirmation.

The 3D render illustrates the direct-colored-fiber GJFV route mapped to an HK-50 reference configuration. It is not a final equipment list, layout drawing, performance commitment or acceptance record.

Section 05 context carried forward Colored optical fibers → HK-50 reference route

No planning topics are currently selected for review.

0 topics carried
3D reference render of the HK-50 GJFV cable production line arrangement
Reference visualization
Reference visualization

HK-50 reference line arrangement

This render shows the current direct-fiber planning direction: colored optical fibers enter through the payoff and tension stage, followed by aramid-yarn application, LSZH jacketing and downstream handling. Final module quantities, interfaces, dimensions and factory layout remain project-specific.

Illustrative cable machinery production environment
Illustrative context
Not project evidence
Source verification pending

Production-environment context

This HONGKAI-hosted image provides general production context only. Its exact factory, project and customer provenance is not verified, so it must not be treated as a customer case, inspection result or acceptance record.

Reference renders and context images illustrate a planning direction only. Only the mutually approved technical agreement defines final supply, performance and acceptance.

Reference visualization

HK-50 reference line arrangement

1 of 2
07 FAQ

Clarify the route before requesting a quote.

The answers below define what is known for this GJFV reference route and what still needs project confirmation.

What cable construction is this line based on?

The current reference route uses colored optical fibers as the input, applies aramid yarn and then extrudes the LSZH outer jacket. The approved cable drawing remains the final basis for the process and equipment configuration.

Does this line also make tight-buffered fiber?

Not in the direct-fiber route shown on this page. If the selected GJFV construction uses tight-buffered fibers, an upstream tight-buffer production line such as the HK-30 reference route is required before the HK-50 GJFV cable production line.

Is HK-50 the final equipment configuration?

HK-50 is the reference production-line model for this page. Modules, sizing, utilities, controls and optional systems are finalized only after HONGKAI reviews the cable structure, materials, target capacity and factory conditions.

What information is needed for a technical proposal?

Please provide the cable drawing or specification, fiber count and input package format, finished cable diameter, material requirements, target line speed or capacity, reel sizes, utilities, available factory space, testing expectations and the expected project timeline.

Are the machine images and process video the final supplied equipment?

No. The images, renders and related HK-60 process video explain a comparable production concept; they are not the exact HK-50 arrangement for this project. The final equipment list, layout and interfaces are confirmed in the technical proposal and project agreement.

Are installation and training included?

Installation, commissioning, training, travel and on-site responsibility are project-scope items. They must be confirmed in the commercial and technical agreement rather than assumed from this reference page.

08 Investment enquiry

Plan your fiber optic cable production investment.

Share your target cable families, planned capacity, factory conditions and current project stage. HONGKAI will review the process route, equipment scope, system interfaces and open technical items before preparing a project-specific proposal.

What HONGKAI will review

Target product plan
Cable families, structures, fiber counts and material requirements
Process route
Starting materials, required processes and equipment interfaces
Capacity target
Product mix, expected output and target line speed
Factory conditions
Available space, utilities, existing equipment and testing needs
Project stage
Planning, budgeting, factory preparation or production expansion
What to prepare · 6 items
  • Target cable types, reference samples or available drawings
  • Fiber counts, cable structures and material requirements
  • Starting materials and required production processes
  • Target output, product mix or expected line speed
  • Existing equipment, reel sizes and available factory layout
  • Utilities, testing requirements and planned project timeline

No complete specification yet? Share your target products and current assumptions. Unconfirmed items can remain “To be confirmed”.

The information submitted here supports a preliminary technical review. Final equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.

Investment project brief

Fiber Optic Cable Production Project Brief

Tell us your planned cable products, target capacity and current investment stage. Partial information is welcome, and you may upload a cable drawing when available.

Drag & Drop Files, Choose Files to Upload
Allow the customer to upload available cable drawings, specifications or reference documents. Display the accepted file types and file-size limit configured in WPForms.

Ask for quote

we will reply you within 24 hours!!!