GYXTW Cable Production Line
What does this production route produce? This reference solution follows a three-stage route for GYXTW central loose-tube outdoor optical cable. HK-235 colors and rewinds optical fiber, HK-50 extrudes a jelly-filled PBT loose tube, and HK-90 applies parallel steel wires, corrugated metal-tape armor and a PE outer sheath. Final fiber count, armor material and equipment scope follow the approved cable drawing.
- Production route
- HK-235 → HK-50 → HK-90
- Control approach
- HK-235: PLC + HMI · HK-50/HK-90: PLC + IPC
- Main processes
- Fiber coloring · jelly-filled PBT loose-tube extrusion · metal-tape armoring & PE sheathing
- Suitable cable range
- GYXTW central loose-tube outdoor cable · reference 2–12 fibers · final design confirmed per project
Open this GYXTW cable and trace each layer to its production stage.
Start with the assembled cable, open the reviewed structure, then choose one layer. The selected layer maps directly to HK-235, HK-50 or HK-90 and carries that context into the reference configuration.
Prepare colored optical fibers
Prepare the colored optical fibers required by the approved GYXTW cable design.
- Input
- Approved optical-fiber specification
- Output
- Prepared colored optical fibers
HK-235
This stage prepares the colored optical fibers before central loose-tube production.
Fiber preparation HK-50
Loose tube HK-90
Armor + sheath
This structure-to-process map explains the reference route only. Fiber count, material grades, dimensions and final equipment scope are confirmed from the approved cable drawing and project requirements.
Review the production configuration for the selected cable layer.
The cable-layer choice from Section 02 is carried here. Review its mapped production stage, then inspect the complete three-stage GYXTW reference route.
HK-235
Optical fiber coloring and rewinding
Prepare and identify the optical fibers before central loose-tube formation.
- Input
- Buyer-confirmed bare optical fibers
- Output
- Colored, rewound optical fibers
- Route position
- Stage 01 · Upstream of loose-tube formation
Prepare colored optical fibers
Prepare the approved optical-fiber input for the central loose-tube stage.
Optical-fiber preparation
This stage covers the reference coloring and rewinding function before loose-tube formation.
Fiber specification and handling format
Confirm fiber type, color sequence, quantity and reel format from the project requirements.
Machine quantities, dimensions, performance, auxiliary systems and final arrangement are confirmed from the cable construction and project requirements.
See the GYXTW armoring and PE sheathing stage in operation.
This official HONGKAI video demonstrates the downstream HK-90+45 armoring and sheathing process used to complete a GYXTW cable. It gives buyers a practical view of Stage 03 after fiber preparation and central loose-tube production have been completed upstream.
Define the GYXTW project boundary before the route is finalized.
The three-stage route above is a reference configuration, not a contractual supply scope. Buyer, HONGKAI and joint responsibilities become final only in the approved technical proposal or agreement.
Nothing below is treated as included, excluded, buyer-supplied or HONGKAI-supplied until it is confirmed in writing.
Opening a group only reveals its details; it does not confirm scope.
01 Buyer prepares Buyer responsibility Project, product and site information for engineering review 4 items
Information HONGKAI must review before fixing the production route and reference equipment configuration.
- Approved cable construction and target product requirements To be confirmed
- Starting materials, grades and supply formats To be confirmed
- Factory space, utilities, access and installation conditions To be confirmed
- Existing equipment and upstream/downstream interface information To be confirmed
02 Defined in the written proposal HONGKAI responsibility Recommended configuration and quoted supply boundary 4 items
HONGKAI defines the recommended configuration and quoted supply boundary after reviewing the available project inputs.
- Recommended production route and reference equipment configuration To be confirmed
- Quoted equipment list and equipment-source boundary To be confirmed
- Required interfaces for the quoted equipment To be confirmed
- Documentation, commissioning, training and after-sales scope stated in the proposal To be confirmed
03 Confirmed together Joint confirmation Technical interfaces, acceptance and project coordination 4 items
Technical interfaces, acceptance and project coordination require written confirmation from both project teams.
- Final process route and equipment configuration To be confirmed
- Layout, interface split and site-readiness conditions To be confirmed
- Acceptance criteria, test conditions and sampling method To be confirmed
- Delivery, installation, trial schedule, changes and final sign-off To be confirmed
Identify the inputs needed to review the GYXTW production route.
Select the planning topics you are ready to discuss during the first engineering review. A selection marks a review topic only; it does not approve a technical value, equipment quantity, material grade, performance target or supply scope.
Review the available GYXTW references and what still needs confirmation.
These images illustrate the HK-235, HK-50 and HK-90 stages mapped to the current GYXTW route. They are reference visuals, not a final equipment list, factory layout, performance commitment or acceptance record.
No planning topics selected yet. Return to Section 05 to add review priorities.
HK-235 fiber preparation reference
Reference equipment for preparing colored optical fibers before loose-tube extrusion. Final fiber count, number of units, payoff interfaces and operating requirements remain project-specific.
These production-stage images illustrate the current three-stage planning direction only. Final equipment quantity, sequence, dimensions, supply, performance and acceptance are defined only by the mutually approved technical agreement.
Clarify the route before requesting a proposal.
These answers define the GYXTW reference route, what the supplied images can demonstrate, and what still requires project confirmation.
What GYXTW cable construction is this reference route based on?
The reference construction uses colored optical fibers inside a jelly-filled central PBT loose tube, followed by the specified water-blocking package, parallel steel strength members, corrugated steel-tape armor and a PE outer sheath. Fiber count, dimensions and material grades must follow the approved cable drawing.
Is the HK-235 fiber-preparation stage always required?
Not always. If qualified colored fibers are supplied in the required package and are ready for loose-tube production, the reviewed project scope may begin at HK-50. If coloring, rewinding or package preparation is required, the HK-235 reference stage must be evaluated with the fiber input specification.
Why does the page show three production stages?
The reference route separates fiber preparation, central loose-tube formation, and final armoring and sheathing. HK-235 prepares the fiber input, HK-50 forms the jelly-filled central loose tube, and HK-90 completes the outer protection package and PE sheath. Final interfaces between these stages remain project-specific.
Are HK-235, HK-50 and HK-90 the final equipment configuration?
No. They are reference production-stage models used to explain the process route. Final module quantities, dimensions, controls, utilities, optional systems and equipment interfaces are confirmed only after reviewing the cable drawing, materials, capacity target and factory conditions.
Can existing equipment or buyer-supplied materials be integrated?
Potentially, subject to technical review. HONGKAI must confirm material package sizes, tension ranges, line interfaces, control signals, dimensions, utilities, operating conditions and required tests before existing equipment or buyer-supplied materials are included in the proposed route.
What information is needed to confirm line speed and production capacity?
Please provide the cable drawing or specification, fiber count, finished diameter, required materials, product mix, target output, expected operating speed, reel sizes, shift pattern, available utilities, factory layout and project schedule. This reference page does not assume a standard project capacity.
Are the machine images and process video the final supplied equipment?
No. The images illustrate the HK-235, HK-50 and HK-90 reference stages. The related video demonstrates a comparable downstream HK-90+45 armoring and sheathing process only; it is not the complete three-stage project route, a final arrangement, a performance result or an acceptance record.
Are inspection, FAT, installation and training included?
Inspection points, FAT requirements, acceptance criteria, documentation, installation, commissioning, training, travel and on-site responsibility are project-scope items. Their exact content must be defined in the technical proposal and mutually approved commercial agreement.
Final cable construction, performance, equipment, acceptance criteria and supply scope are defined only in the mutually approved technical and commercial agreement.
Plan your fiber optic cable production investment.
Share your target cable families, planned capacity, factory conditions and current project stage. HONGKAI will review the process route, equipment scope, system interfaces and open technical items before preparing a project-specific proposal.
What HONGKAI will review
- Target product plan
- Cable families, constructions, fiber counts and material requirements
- Process route
- Starting materials, required processes and equipment interfaces
- Capacity target
- Product mix, expected output and target line speed
- Factory conditions
- Available space, utilities, existing equipment and testing needs
- Project stage
- Planning, budgeting, factory preparation or production expansion
- Review status
- Preliminary assessment · Technical confirmation required
What to prepare · 6 items
- Target cable types, reference samples or available drawings
- Fiber counts, cable structures and material requirements
- Starting materials and required production processes
- Target output, product mix or expected line speed
- Existing equipment, reel sizes and available factory layout
- Utilities, testing requirements and planned project timeline
No complete specification yet? Share your target products and current assumptions. Unconfirmed items can remain “To be confirmed”.
The information submitted here supports a preliminary technical review. Final equipment configuration, performance, price, delivery schedule and supply scope are confirmed only in an approved proposal or agreement.
Fiber Optic Cable Production Project Brief
Tell us your planned cable products, target capacity and current investment stage. Partial information is welcome, and you may upload a cable drawing when available.