{"id":17453,"date":"2026-09-23T16:12:50","date_gmt":"2026-09-23T08:12:50","guid":{"rendered":"https:\/\/hkcablemachine.com\/?p=17453"},"modified":"2026-09-23T16:12:50","modified_gmt":"2026-09-23T08:12:50","slug":"copper-wire-drawing-machine-selection-guide","status":"publish","type":"post","link":"https:\/\/hkcablemachine.com\/vi\/copper-wire-drawing-machine-selection-guide\/","title":{"rendered":"Nh\u00e0 m\u00e1y c\u00e1p c\u1ee7a b\u1ea1n n\u00ean mua d\u00e2y \u0111\u1ed3ng hay t\u1ef1 k\u00e9o d\u00e2y?"},"content":{"rendered":"<p>A cable factory considering a copper wire drawing machine should start with its wire demand, not a machine catalogue. The first decision is whether to keep buying wire at the required size or bring some of that work in-house.<\/p>\n<p><strong>Before comparing machines, confirm how much copper the factory uses each month, which wire sizes it needs and whether the finished wire must be annealed. Then compare the full cost of buying wire with the cost of producing acceptable wire in-house.<\/strong><\/p>\n<p>This guide helps factory owners and technical buyers make that comparison. It does not assume that every cable factory needs a drawing line, or that one monthly volume guarantees savings.<\/p>\n<h2>L\u01b0\u1ee3ng \u0111\u1ed3ng s\u1eed d\u1ee5ng h\u00e0ng th\u00e1ng c\u00f3 \u0111\u1ee7 cao \u0111\u1ec3 \u0111\u00e1nh gi\u00e1 vi\u1ec7c k\u00e9o s\u1ee3i t\u1ea1i ch\u1ed7 kh\u00f4ng?<\/h2>\n<p>In HONGKAI&#8217;s buying discussions, copper use of around four metric tonnes per month is an initial reference for evaluating in-house drawing. That figure comes from practical sales-planning experience, not a universal minimum or a calculated break-even point. It does not prove that a particular machine will save money.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/copper-drawing-full-cost-comparison.webp\" alt=\"So s\u00e1nh chi ph\u00ed d\u00e2y \u0111\u1ed3ng mua ngo\u00e0i v\u00e0 chi ph\u00ed k\u00e9o s\u1ee3i trong nh\u00e0 s\u1eed d\u1ee5ng c\u00f9ng th\u00f4ng s\u1ed1 k\u1ef9 thu\u1eadt d\u00e2y v\u00e0 nhu c\u1ea7u nh\u01b0 nhau\" title=\"\"><\/p>\n<p><em>S\u01a1 \u0111\u1ed3 l\u1eadp k\u1ebf ho\u1ea1ch: so s\u00e1nh t\u1ed5ng chi ph\u00ed \u0111\u1ea7y \u0111\u1ee7 d\u1ef1a tr\u00ean c\u00f9ng c\u00e1c gi\u1ea3 \u0111\u1ecbnh v\u1ec1 nhu c\u1ea7u. \u0110\u00e2y kh\u00f4ng ph\u1ea3i l\u00e0 ph\u00e9p t\u00ednh h\u00f2a v\u1ed1n hay tuy\u00ean b\u1ed1 ti\u1ebft ki\u1ec7m.<\/em><\/p>\n<p>Separate actual recurring demand from a hoped-for production target. Record how much wire the factory needs at each diameter, and whether that volume is steady or changes with individual orders. A large catalogue capacity is not useful if the factory cannot use the output.<\/p>\n<p>Compare the delivered cost of ready-to-use copper wire with the cost of suitable feedstock plus drawing. Include labour, electricity, dies, drawing fluid, maintenance, rejected material and the cost of owning the equipment. Annealing, when required, also belongs in the comparison. Transport, waiting time and the cost of purchasing different sizes may matter, but their value must come from the factory&#8217;s actual purchasing records.<\/p>\n<p>Buying wire remains a serious option when demand is uncertain or the full operating cost has not been established. Reaching the planning reference is a reason to obtain quotations and compare costs, not a reason to place an equipment order automatically. For a first network cable factory, the <a href=\"https:\/\/hkcablemachine.com\/start-network-cable-manufacturing-business\/\">h\u01b0\u1edbng d\u1eabn l\u1eadp k\u1ebf ho\u1ea1ch kinh doanh c\u00e1p m\u1ea1ng<\/a> gi\u1ea3i th\u00edch c\u00e1ch c\u00e1c \u0111\u01a1n h\u00e0ng v\u00e0 nhu c\u1ea7u th\u1ecb tr\u01b0\u1eddng n\u00ean \u0111\u01b0\u1ee3c xem x\u00e9t tr\u01b0\u1edbc khi l\u1ef1a ch\u1ecdn thi\u1ebft b\u1ecb.<\/p>\n<h2>Ghi l\u1ea1i c\u00e1c k\u00edch c\u1ee1 d\u00e2y d\u1eabn y\u00eau c\u1ea7u v\u00e0 v\u1eadt li\u1ec7u ban \u0111\u1ea7u<\/h2>\n<p><strong>M\u00e1y k\u00e9o s\u1ee3i ph\u1ea3i ph\u00f9 h\u1ee3p \u0111\u1ed3ng th\u1eddi v\u1edbi c\u1ea3 v\u1eadt li\u1ec7u \u0111\u01b0a v\u00e0o v\u00e0 lo\u1ea1i d\u00e2y y\u00eau c\u1ea7u \u0111\u1ea7u ra. Ch\u1ec9 bi\u1ebft \u0111\u01b0\u1eddng k\u00ednh th\u00e0nh ph\u1ea9m th\u00f4i l\u00e0 ch\u01b0a \u0111\u1ee7 \u0111\u1ec3 l\u1ef1a ch\u1ecdn m\u00e1y.<\/strong><\/p>\n<p>Write down the purchased material, its diameter and condition, the required final wire diameter, and the monthly quantity for each size. If those details are not yet known, first settle the wire specification rather than choosing between machine names.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/copper-drawing-material-starting-points.webp\" alt=\"Ba \u0111i\u1ec3m xu\u1ea5t ph\u00e1t v\u1eadt li\u1ec7u \u0111\u1ed3ng: d\u00e2y s\u1eb5n s\u00e0ng s\u1eed d\u1ee5ng, d\u00e2y d\u00e0y h\u01a1n c\u1ea7n k\u00e9o s\u1ee3i, v\u00e0 thanh \u0111\u1ed3ng c\u1ea7n c\u00e1n nh\u1ecf\" title=\"\"><\/p>\n<p><em>S\u01a1 \u0111\u1ed3 ph\u1ea1m vi \u0111\u01a1n gi\u1ea3n h\u00f3a, kh\u00f4ng ph\u1ea3i b\u1ed1 tr\u00ed tuy\u1ebfn c\u1ed1 \u0111\u1ecbnh. C\u00e1c y\u00eau c\u1ea7u v\u1ec1 \u1ee7 v\u00e0 thu d\u00e2y ph\u1ea3i \u0111\u01b0\u1ee3c th\u1ed1ng nh\u1ea5t cho tuy\u1ebfn \u0111\u00e3 ch\u1ecdn.<\/em><\/p>\n<p>B\u1ea3ng sau ph\u00e2n chia ba tuy\u1ebfn mua h\u00e0ng. \u0110\u00e2y kh\u00f4ng ph\u1ea3i l\u00e0 danh s\u00e1ch thi\u1ebft b\u1ecb c\u1ed1 \u0111\u1ecbnh cho m\u1ecdi nh\u00e0 m\u00e1y.<\/p>\n<table>\n<thead>\n<tr>\n<th>Nh\u1eefng g\u00ec nh\u00e0 m\u00e1y mua<\/th>\n<th>C\u00f4ng vi\u1ec7c \u0111\u01b0\u1ee3c gi\u1eef b\u00ean trong nh\u00e0 m\u00e1y<\/th>\n<th>C\u00e2u h\u1ecfi ch\u00ednh tr\u01b0\u1edbc khi l\u1ef1a ch\u1ecdn<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>D\u00e2y \u0111\u1ed3ng \u0111\u00e3 \u0111\u1ea1t \u0111\u01b0\u1eddng k\u00ednh v\u00e0 t\u00ecnh tr\u1ea1ng y\u00eau c\u1ea7u<\/td>\n<td>Ki\u1ec3m tra \u0111\u1ea7u v\u00e0o v\u00e0 quy tr\u00ecnh s\u1ea3n xu\u1ea5t c\u00e1p ti\u1ebfp theo; k\u00e9o s\u1ee3i n\u1eb1m ngo\u00e0i ph\u1ea1m vi n\u00e0y<\/td>\n<td>Nh\u00e0 cung c\u1ea5p c\u00f3 th\u1ec3 giao d\u00e2y, s\u1ed1 l\u01b0\u1ee3ng v\u00e0 bao b\u00ec y\u00eau c\u1ea7u m\u1ed9t c\u00e1ch \u0111\u00e1ng tin c\u1eady kh\u00f4ng?<\/td>\n<\/tr>\n<tr>\n<td>D\u00e2y \u0111\u1ed3ng v\u1eabn c\u1ea7n gi\u1ea3m \u0111\u01b0\u1eddng k\u00ednh<\/td>\n<td>C\u00e1c c\u00f4ng \u0111o\u1ea1n k\u00e9o s\u1ee3i c\u1ea7n thi\u1ebft \u0111\u1ec3 \u0111\u1ea1t \u0111\u01b0\u1ee3c m\u1ee5c ti\u00eau, c\u1ed9ng v\u1edbi ph\u1ea1m vi \u1ee7 v\u00e0 thu cu\u1ed9n \u0111\u00e3 \u0111\u01b0\u1ee3c th\u1ecfa thu\u1eadn<\/td>\n<td>Does the selected machine accept the purchased wire and produce the required output?<\/td>\n<\/tr>\n<tr>\n<td>Copper rod<\/td>\n<td>Rod breakdown, with further drawing where needed for the final wire specification<\/td>\n<td>Is the broader process justified by real demand, available skills and the full operating cost?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Rod breakdown reduces rod into smaller wire. Further drawing may be required to reach the final size. Intermediate and fine drawing are useful machine categories, but their names alone do not specify a complete route. Manufacturer product ranges distinguish drawing machines, annealers and take-up equipment as separate parts of the production system.<sup id=\"fnref1:1\"><a href=\"#fn:1\" class=\"footnote-ref\">1<\/a><\/sup><\/p>\n<p>For a new factory, buying ready-to-use wire can be a practical starting point if there is a dependable source. Request the same written wire specification from the material supplier that you would use to accept wire from an in-house line. Buying wire transfers a process to a supplier; it does not remove the need to verify the output.<\/p>\n<p>If a supplier proposes more than one drawing stage, ask what each stage receives and produces. For a stranded conductor, specify the diameter of the individual wires, not just the total conductor cross-section.<\/p>\n<p>Do not assume that the words \u201cintermediate\u201d or \u201cfine\u201d have identical limits in every catalogue. Ask for a written operating range for the offered model and the exact route needed for your main products. HONGKAI&#8217;s <a href=\"https:\/\/hkcablemachine.com\/intermediate-wire-drawing-machine-for-copper-rod\/\">intermediate drawing equipment reference<\/a> is a starting point for that discussion, not confirmation of a project&#8217;s final configuration. A range that covers a small trial sample still needs to be checked against the planned production mix.<\/p>\n<p>The input copper also matters. BECHEM&#8217;s technical guide identifies incoming rod quality and the drawing emulsion as important to the drawing process.<sup id=\"fnref1:2\"><a href=\"#fn:2\" class=\"footnote-ref\">2<\/a><\/sup> Keep the feedstock supplier, material batch and actual input size in the trial record, so a change in the raw material is not confused with a change in machine performance.<\/p>\n<h2>Does the Finished Wire Need Annealing?<\/h2>\n<p>Drawing makes the wire smaller, but it also hardens the copper through deformation. Annealing is used to soften the drawn wire when the required finished condition calls for it. BECHEM&#8217;s technical guide describes this soft-annealing purpose and an inline drawing, annealing and spooling route.<sup id=\"fnref2:2\"><a href=\"#fn:2\" class=\"footnote-ref\">2<\/a><\/sup> That example does not mean every purchase needs the same arrangement.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/copper-drawing-annealing-decision.webp\" alt=\"S\u01a1 \u0111\u1ed3 ra quy\u1ebft \u0111\u1ecbnh c\u1ee7a ng\u01b0\u1eddi mua li\u00ean k\u1ebft \u0111i\u1ec1u ki\u1ec7n d\u00e2y th\u00e0nh ph\u1ea9m y\u00eau c\u1ea7u v\u1edbi vi\u1ec7c c\u00f3 bao g\u1ed3m \u1ee7 hay kh\u00f4ng v\u00e0 c\u00e1ch th\u1ee9c x\u00e1c minh \u0111\u1ea7u ra\" title=\"\"><\/p>\n<p><em>Decision illustration: specify the required wire condition before choosing the annealing scope. This is not an annealer setup instruction.<\/em><\/p>\n<p>For a buyer, the useful question is what condition the next process or final product requires. Specify the required wire condition and applicable mechanical properties, such as elongation and tensile strength where the product specification calls for them. Do not describe acceptance only as \u201cnot brittle\u201d or \u201csoft enough\u201d. Ask the supplier which tests will demonstrate the agreed condition.<\/p>\n<p>The proposal should state whether annealing is included and where it occurs. Online or separate annealing must be selected for the actual route; this guide does not prescribe one arrangement. A drawing-only price and a drawing-and-annealing price do not cover the same work.<\/p>\n<p>The finished package is another interface. Record the spool dimensions, usable loading requirement and the next machine&#8217;s pay-off arrangement. A spool that leaves the drawing line successfully still has to work at the insulation, bunching or other downstream process. For a bunched conductor, the <a href=\"https:\/\/hkcablemachine.com\/wire-bunching-machine-selection-guide\/\">h\u01b0\u1edbng d\u1eabn l\u1ef1a ch\u1ecdn m\u00e1y b\u00f3 d\u00e2y<\/a> explains the input-wire and package information needed at that next stage.<\/p>\n<p>Use one scope sheet for the drawing machine, annealing equipment, take-up, dies, cooling or fluid system, and required utilities. Mark each item as included, supplied separately or provided by the buyer. This is a scope comparison, not a claim that every project needs every accessory.<\/p>\n<h2>Compare Accepted Output, Not Only Metres per Minute<\/h2>\n<p>A line-speed figure tells you how quickly wire moves. It does not, by itself, tell you how much usable copper the factory produces during a shift. Wire diameter, number of wires, running time and rejected material all affect that comparison.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/copper-drawing-accepted-output.webp\" alt=\"\u0110\u1ea7u ra d\u00e2y \u0111\u1ed3ng \u0111\u1ea1t y\u00eau c\u1ea7u b\u1eb1ng t\u1ed5ng \u0111\u1ea7u ra tr\u1eeb \u0111i \u0111\u1ea7u ra b\u1ecb lo\u1ea1i, v\u1edbi th\u1eddi gian ch\u1ea1y m\u00e1y, c\u00e1c l\u1ea7n d\u1eebng v\u00e0 chuy\u1ec3n \u0111\u1ed5i \u0111\u01b0\u1ee3c t\u00ednh v\u00e0o to\u00e0n b\u1ed9 qu\u00e1 tr\u00ecnh th\u1eed nghi\u1ec7m\" title=\"\"><\/p>\n<p><em>Minh h\u1ecda b\u1ea3ng ghi \u0111\u1ea7u ra kh\u00f4ng c\u00f3 k\u1ebft qu\u1ea3 m\u1eabu. Gi\u1eef nguy\u00ean s\u1ed1 l\u01b0\u1ee3ng trong c\u00f9ng \u0111\u01a1n v\u1ecb v\u00e0 th\u1ed1ng nh\u1ea5t c\u00e1ch t\u00ednh v\u1eadt li\u1ec7u b\u1ecb lo\u1ea1i v\u00e0 v\u1eadt li\u1ec7u \u0111\u01b0\u1ee3c l\u00e0m l\u1ea1i.<\/em><\/p>\n<p>Ask for an output record for the diameter and material you intend to run. Keep two figures separate: accepted output during stable running, and accepted output over the full agreed trial period. The second includes the effect of recorded stops and changeovers.<\/p>\n<p>M\u1ed9t b\u1ea3n ghi so s\u00e1nh h\u1eefu \u00edch bao g\u1ed3m:<\/p>\n<ul>\n<li>V\u1eadt li\u1ec7u \u0111\u1ea7u v\u00e0o v\u00e0 \u0111\u01b0\u1eddng k\u00ednh, \u0111\u01b0\u1eddng k\u00ednh d\u00e2y m\u1ee5c ti\u00eau v\u00e0 s\u1ed1 l\u01b0\u1ee3ng d\u00e2y \u0111\u01b0\u1ee3c k\u00e9o.<\/li>\n<li>T\u1ed1c \u0111\u1ed9 ch\u1ea1y th\u1ef1c t\u1ebf, th\u1eddi gian th\u1eed nghi\u1ec7m \u0111\u00e3 tr\u00f4i qua, c\u00e1c l\u1ea7n d\u1eebng v\u00e0 l\u00fd do cho t\u1eebng l\u1ea7n d\u1eebng.<\/li>\n<li>S\u1ea3n l\u01b0\u1ee3ng t\u1ed5ng, s\u1ea3n l\u01b0\u1ee3ng b\u1ecb lo\u1ea1i v\u00e0 s\u1ea3n l\u01b0\u1ee3ng \u0111\u01b0\u1ee3c ch\u1ea5p nh\u1eadn, k\u00e8m theo ph\u01b0\u01a1ng ph\u00e1p c\u00e2n ho\u1eb7c \u0111\u1ebfm.<\/li>\n<li>C\u1ee5m \u1ee7 v\u00e0 cu\u1ed9n \u0111\u1ea7u ra \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng trong qu\u00e1 tr\u00ecnh ch\u1ea1y.<\/li>\n<\/ul>\n<p>These are proposed buyer records, not universal acceptance limits. Set the sample requirements and trial duration in the purchase agreement. If a supplier offers only a maximum speed without the associated product and test conditions, the factory still lacks the information needed for capacity planning.<\/p>\n<p>Tr\u00e1nh vi\u1ec7c cho r\u1eb1ng m\u1ed9t l\u1ea7n th\u1eed nghi\u1ec7m c\u00f3 th\u1ec3 ch\u1ee9ng minh cho m\u1ecdi \u0111\u01b0\u1eddng k\u00ednh trong catalogue. H\u00e3y ch\u1ecdn c\u00e1c s\u1ea3n ph\u1ea9m th\u1eed nghi\u1ec7m ph\u1ea3n \u00e1nh \u0111\u00fang m\u1ee5c \u0111\u00edch mua h\u00e0ng v\u00e0 th\u1ed1ng nh\u1ea5t c\u00e1ch th\u1ee9c ch\u1ee9ng minh cho c\u00e1c k\u00edch c\u1ee1 kh\u00e1c.<\/p>\n<h2>Decide Which Responsibilities Your Factory Is Ready to Own<\/h2>\n<p>The final choice is a boundary decision. Buying finished wire keeps drawing with the material supplier. Buying intermediate wire brings part of that work inside. Starting with rod brings a wider processing route into the project.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/copper-drawing-process-ownership.webp\" alt=\"So s\u00e1nh tr\u00e1ch nhi\u1ec7m cho th\u1ea5y ho\u1ea1t \u0111\u1ed9ng v\u1ebd, v\u1eadn h\u00e0nh v\u00e0 b\u1ea3o tr\u00ec thu\u1ed9c v\u1ec1 nh\u00e0 cung c\u1ea5p ho\u1eb7c nh\u00e0 m\u00e1y, trong khi vi\u1ec7c ki\u1ec3m tra \u0111\u1ea7u v\u00e0o mua h\u00e0ng v\u1eabn thu\u1ed9c v\u1ec1 ng\u01b0\u1eddi mua\" title=\"\"><\/p>\n<p><em>S\u01a1 \u0111\u1ed3 tr\u00e1ch nhi\u1ec7m \u0111\u01a1n gi\u1ea3n h\u00f3a cho d\u00e2y th\u00e0nh ph\u1ea9m mua ngo\u00e0i so v\u1edbi c\u00f4ng \u0111o\u1ea1n k\u00e9o s\u1ee3i n\u1ed9i b\u1ed9. C\u1ea3 hai tuy\u1ebfn \u0111\u01b0\u1eddng v\u1eabn c\u1ea7n ki\u1ec3m tra v\u1eadt li\u1ec7u v\u00e0 t\u00ednh ph\u00f9 h\u1ee3p cho c\u00e1c c\u00f4ng \u0111o\u1ea1n ti\u1ebfp theo.<\/em><\/p>\n<p>Keep purchased wire as a serious option when demand is still uncertain or the factory has not yet budgeted for drawing operation and quality control. Evaluate an in-house stage when the product mix and material demand are clear enough to compare complete costs and responsibilities.<\/p>\n<p>M\u1ed9t giai \u0111o\u1ea1n n\u1ed9i b\u1ed9 c\u0169ng c\u1ea7n c\u00f3 m\u1ed9t ch\u1ee7 s\u1edf h\u1eefu \u0111\u01b0\u1ee3c ch\u1ec9 \u0111\u1ecbnh \u0111\u1ec3 b\u1ea3o tr\u00ec v\u00e0 ph\u1ee5 t\u00f9ng. Giai \u0111o\u1ea1n <a href=\"https:\/\/hkcablemachine.com\/cable-production-line-maintenance-spare-parts\/\">h\u01b0\u1edbng d\u1eabn l\u1eadp k\u1ebf ho\u1ea1ch b\u1ea3o tr\u00ec d\u00e2y chuy\u1ec1n c\u00e1p<\/a> helps define that responsibility; it is not a universal spare-parts list for every drawing machine.<\/p>\n<p>Use the same wire specification and demand assumptions for both purchasing routes. Keep the supplier&#8217;s confirmed scope separate from options that still need a quotation. Neither an attractive machine price nor a generic savings percentage settles the make-or-buy decision.<\/p>\n<p>Before accepting a drawing proposal, tie the trial results to the agreed finished-wire specification. Relevant items to define can include diameter, surface condition, electrical resistance and mechanical properties, together with the spool requirements. Select the actual tests and limits from the intended product specification, rather than borrowing numbers from an unrelated cable.<\/p>\n<p>The result should be a clear decision: what copper enters the factory, what operations the factory owns, and what verified wire leaves those operations. Only then does comparing individual drawing machines become useful.<\/p>\n<div class=\"footnotes\">\n<hr \/>\n<ol>\n<li id=\"fn:1\">\n<p><a href=\"https:\/\/www.niehoff-gmbh.info\/en\/products\" rel=\"nofollow noopener\" target=\"_blank\">D\u1ea3i s\u1ea3n ph\u1ea9m NIEHOFF<\/a> ph\u00e2n bi\u1ec7t thi\u1ebft b\u1ecb k\u00e9o r\u00fat thanh, k\u00e9o d\u00e2y \u0111\u01a1n, k\u00e9o \u0111a s\u1ee3i, \u1ee7 v\u00e0 thu cu\u1ed9n. \u0110\u00e2y l\u00e0 t\u00e0i li\u1ec7u tham kh\u1ea3o v\u1ec1 ph\u1ea1m vi quy tr\u00ecnh, kh\u00f4ng ph\u1ea3i b\u1eb1ng ch\u1ee9ng v\u1ec1 hi\u1ec7u su\u1ea5t c\u1ee7a model HONGKAI.\u00a0<a href=\"#fnref1:1\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:2\">\n<p><a href=\"https:\/\/www.bechem.de\/_Resources\/Persistent\/d\/d\/8\/a\/dd8ab883aa680d193e272b78e3dc7d0ca77920c0\/BECHEM_Wire_Drawing_en.pdf\" rel=\"nofollow noopener\" target=\"_blank\">BECHEM, Gi\u1ea3i ph\u00e1p b\u00f4i tr\u01a1n cho k\u00e9o d\u00e2y<\/a>, printed pages 08\u201309, discusses incoming rod, drawing fluids and the drawing\/annealing\/spooling sequence. Its product-specific figures are not HONGKAI specifications.&#160;<a href=\"#fnref1:2\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a> <a href=\"#fnref2:2\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<\/ol>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>B\u1eaft \u0111\u1ea7u t\u1eeb m\u1ee9c s\u1eed d\u1ee5ng \u0111\u1ed3ng h\u00e0ng th\u00e1ng, k\u00edch c\u1ee1 d\u00e2y d\u1eabn y\u00eau c\u1ea7u v\u00e0 nhu c\u1ea7u \u1ee7 tr\u01b0\u1edbc khi quy\u1ebft \u0111\u1ecbnh xem nh\u00e0 m\u00e1y c\u00e1p n\u00ean mua d\u00e2y hay \u0111\u1ea7u t\u01b0 v\u00e0o thi\u1ebft b\u1ecb k\u00e9o s\u1ee3i.<\/p>","protected":false},"author":1,"featured_media":17455,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_angie_page":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"page_builder":"","thumbnail_url":"","footnotes":""},"categories":[879,893],"tags":[],"buyer-route":[],"process":[],"class_list":["post-17453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-knowledge","category-wire-drawing-machine"],"acf":[],"_links":{"self":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts\/17453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/comments?post=17453"}],"version-history":[{"count":2,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts\/17453\/revisions"}],"predecessor-version":[{"id":17461,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts\/17453\/revisions\/17461"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/media\/17455"}],"wp:attachment":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/media?parent=17453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/categories?post=17453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/tags?post=17453"},{"taxonomy":"buyer-route","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/buyer-route?post=17453"},{"taxonomy":"process","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/process?post=17453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}