{"id":13912,"date":"2025-09-22T10:13:59","date_gmt":"2025-09-22T02:13:59","guid":{"rendered":"https:\/\/hkcablemachine.com\/?p=13912"},"modified":"2026-09-08T11:15:20","modified_gmt":"2026-09-08T03:15:20","slug":"how-do-i-find-reliable-cat6-cable-manufacturers","status":"publish","type":"post","link":"https:\/\/hkcablemachine.com\/vi\/how-do-i-find-reliable-cat6-cable-manufacturers\/","title":{"rendered":"C\u00e1ch T\u00ecm Nh\u00e0 S\u1ea3n Xu\u1ea5t C\u00e1p Cat6 Uy T\u00edn t\u1ea1i Trung Qu\u1ed1c"},"content":{"rendered":"<p><!-- hk:guide --><\/p>\n<p>If you import Cat6 cable, sell it under your own brand or buy it for projects, a low price and a sample marked \u201cPASS\u201d are only a starting point. You need to know whether the factory can keep making the cable you approved, at the quality and delivery rate your order needs.<\/p>\n<p><strong>Start with the exact Cat6 model, whether you need bulk cable or finished patch cords, and the tests the product must pass. Then compare supplier identity, sample records, certificate scope, production control and capacity at a proven quality level. Put the same product and test requirements into the first order.<\/strong><\/p>\n<p>H\u01b0\u1edbng d\u1eabn n\u00e0y gi\u00fap b\u1ea1n t\u00ecm \u1ee9ng vi\u00ean, ki\u1ec3m tra b\u1eb1ng ch\u1ee9ng c\u1ee7a h\u1ecd v\u00e0 ph\u00ea duy\u1ec7t \u0111\u01a1n h\u00e0ng \u0111\u1ea7u ti\u00ean \u0111\u01b0\u1ee3c ki\u1ec3m so\u00e1t. H\u01b0\u1edbng d\u1eabn kh\u00f4ng x\u1ebfp h\u1ea1ng c\u00e1c nh\u00e0 m\u00e1y \u0111\u01b0\u1ee3c n\u00eau t\u00ean ho\u1eb7c x\u00e1c nh\u1eadn nh\u00e0 cung c\u1ea5p n\u00e0o.<\/p>\n<h2>X\u00e2y d\u1ef1ng danh s\u00e1ch r\u00fat g\u1ecdn d\u1ef1a tr\u00ean m\u1ed9t \u0111\u1eb7c t\u1ea3 Cat6<\/h2>\n<p><strong>Collect candidate names first, but compare them only after you have defined the same product and test requirements. A factory website, directory entry or introduction is a lead, not proof of reliability.<\/strong><\/p>\n<p>Use online searches, maps, factory websites, supplier directories, trade shows, social media and industry introductions to build an initial list. Record the company, claimed production site, offered cable model and contact. A map listing, exhibition presence or factory video is a lead; it does not establish who owns or operates the production equipment.<\/p>\n<p>Send the same short enquiry to each candidate: exact Cat6 model, bulk cable in boxes or reels versus finished patch cords, construction, market requirements, order quantity, packaging, required tests and delivery target. Request a quotation, matching sample specification and relevant test records. Shortlist the candidates that can connect those items; use the six checks below before committing to an order.<\/p>\n<p>X\u00e1c nh\u1eadn model, h\u00ecnh th\u1ee9c b\u00e1n h\u00e0ng v\u00e0 c\u00e1c ph\u00e9p th\u1eed y\u00eau c\u1ea7u tr\u01b0\u1edbc khi th\u1ea3o lu\u1eadn v\u1ec1 gi\u00e1 ho\u1eb7c quy m\u00f4 c\u1ee7a nh\u00e0 m\u00e1y. \u0110i\u1ec1u \u0111\u00f3 \u0111\u1ea3m b\u1ea3o m\u1ed7i \u1ee9ng vi\u00ean \u0111\u1ec1u c\u00f3 c\u00f9ng y\u00eau c\u1ea7u mua h\u00e0ng \u0111\u1ec3 tr\u1ea3 l\u1eddi.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/cable-uutp.webp\" alt=\"HONGKAI 3D reference of four unscreened twisted pairs with a cross separator inside a blue U\/UTP cable jacket\" title=\"Define the cable construction\" \/><\/p>\n<p><em>Existing HONGKAI 3D reference: four unscreened pairs with a cross separator. This is one illustrative construction, not a universal Cat6 design, a dimensional drawing or proof of compliance. Compare each supplier against the same approved cable specification.<\/em><\/p>\n<table>\n<thead>\n<tr>\n<th>\u0110i\u1ec1u b\u1ea1n \u0111ang mua<\/th>\n<th>\u0110\u1ed3ng \u00fd tr\u01b0\u1edbc khi so s\u00e1nh b\u00e1o gi\u00e1<\/th>\n<th>Y\u00eau c\u1ea7u b\u1eb1ng ch\u1ee9ng ph\u00f9 h\u1ee3p<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>C\u00e1p n\u1eb1m ngang s\u1ed1 l\u01b0\u1ee3ng l\u1edbn trong th\u00f9ng ho\u1eb7c cu\u1ed9n<\/td>\n<td>V\u1eadt li\u1ec7u v\u00e0 c\u1ea5u tr\u00fac ru\u1ed9t d\u1eabn, l\u1edbp c\u00e1ch \u0111i\u1ec7n, thi\u1ebft k\u1ebf \u0111\u00f4i d\u00e2y, l\u1edbp b\u1ecdc ch\u1eafn (n\u1ebfu y\u00eau c\u1ea7u), l\u1edbp v\u1ecf b\u1ecdc ngo\u00e0i v\u00e0 chi\u1ec1u d\u00e0i cu\u1ed9n c\u00e1p<\/td>\n<td>K\u00e9o c\u00e1p, b\u1ea3ng k\u00ea v\u1eadt t\u01b0 (BOM), m\u1eabu \u0111\u00e3 \u0111\u01b0\u1ee3c x\u00e1c \u0111\u1ecbnh, ph\u01b0\u01a1ng ph\u00e1p th\u1eed c\u00e1p v\u00e0 h\u1ed3 s\u01a1 l\u00f4 h\u00e0ng<\/td>\n<\/tr>\n<tr>\n<td>D\u00e2y n\u1ed1i ho\u00e0n thi\u1ec7n<\/td>\n<td>C\u00e1p c\u01a1 s\u1edf, \u0111\u1ea7u n\u1ed1i, \u0111\u1ea7u b\u1ecbt, chi\u1ec1u d\u00e0i th\u00e0nh ph\u1ea9m, y\u00eau c\u1ea7u v\u1ec1 d\u00e2y d\u1eabn v\u00e0 l\u1eafp r\u00e1p<\/td>\n<td>Th\u00f4ng tin \u0111\u1ecbnh danh linh ki\u1ec7n, \u0111\u1eb7c t\u1ea3 l\u1eafp r\u00e1p v\u00e0 b\u00e1o c\u00e1o ki\u1ec3m tra d\u00e2y c\u00e1p th\u00e0nh ph\u1ea9m<\/td>\n<\/tr>\n<tr>\n<td>Li\u00ean k\u1ebft c\u1ed1 \u0111\u1ecbnh ho\u1eb7c k\u00eanh \u0111\u00e3 l\u1eafp \u0111\u1eb7t<\/td>\n<td>C\u00e1p v\u00e0 ph\u1ee5 ki\u1ec7n k\u1ebft n\u1ed1i, s\u01a1 \u0111\u1ed3 k\u1ebft n\u1ed1i, chi\u1ec1u d\u00e0i v\u00e0 ph\u1ea1m vi l\u1eafp \u0111\u1eb7t<\/td>\n<td>T\u1ec7p ki\u1ec3m tra hi\u1ec7n tr\u01b0\u1eddng cho li\u00ean k\u1ebft ho\u1eb7c k\u00eanh \u0111\u00e3 l\u1eafp \u0111\u1eb7t th\u1ef1c t\u1ebf, kh\u00f4ng ph\u1ea3i l\u00e0 b\u1ea3n thay th\u1ebf cho h\u1ed3 s\u01a1 c\u00e1p c\u1ee7a nh\u00e0 m\u00e1y<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Screening and certification are additional specification choices, not separate proof that the product is suitable. Define the screen construction and any required safety listing or performance-verification program for the product you are buying.<\/p>\n<p>TIA published ANSI\/TIA-568.2-E for balanced twisted-pair cabling and components in November 2024.<sup id=\"fnref1:1\"><a href=\"#fn:1\" class=\"footnote-ref\">1<\/a><\/sup> IEC 61156-5:2020 bao g\u1ed3m c\u00e1c c\u00e1p \u0111\u00f4i ho\u1eb7c c\u00e1p b\u1ed1n \u0111\u1ed1i x\u1ee9ng \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng ch\u1ee7 y\u1ebfu cho h\u1ec7 th\u1ed1ng d\u00e2y d\u1eabn ngang trong t\u00f2a nh\u00e0.<sup id=\"fnref1:2\"><a href=\"#fn:2\" class=\"footnote-ref\">2<\/a><\/sup> N\u00eau r\u00f5 t\u00ean t\u00e0i li\u1ec7u \u0111i\u1ec1u ch\u1ec9nh v\u00e0 phi\u00ean b\u1ea3n trong y\u00eau c\u1ea7u; c\u00e1c nh\u00e3n ph\u00ea duy\u1ec7t \u201cCat6,\u201d \u201cTIA\u201d v\u00e0 \u201cIEC\u201d kh\u00f4ng th\u1ec3 thay th\u1ebf cho nhau.<\/p>\n<p>Do not assume box cable and patch cords can be compared by length or a PASS label alone. Fluke&#8217;s guidance explains that patch-cord adapters assess the plug connections differently from channel testing.<sup id=\"fnref1:6\"><a href=\"#fn:6\" class=\"footnote-ref\">3<\/a><\/sup> H\u00e3y kh\u1edbp m\u1eabu, ph\u1ea7n chu\u1ea9n b\u1ecb, c\u00e1c b\u1ed9 chuy\u1ec3n \u0111\u1ed5i v\u00e0 c\u00e1c gi\u1edbi h\u1ea1n \u0111\u00e3 ch\u1ecdn v\u1edbi ph\u00e9p th\u1eed \u0111\u00e3 th\u1ecfa thu\u1eadn. Kh\u00f4ng c\u00f3 c\u00e1ch x\u1ebfp h\u1ea1ng chung chung n\u00e0o mang t\u00ednh \u201cd\u1ec5 h\u01a1n\u201d hay \u201ckh\u00f3 h\u01a1n\u201d m\u00e0 thi\u1ebfu nh\u1eefng chi ti\u1ebft \u0111\u00f3.<\/p>\n<p>Decision criterion: Compare prices only for the same product, packaging and test scope. If one quotation costs less, ask what changed before assuming the factory is more efficient or the sample represents the cheaper offer.<\/p>\n<h2>S\u1eed d\u1ee5ng S\u00e1u C\u1ed5ng Ki\u1ec3m ch\u1ee9ng \u0111\u1ec3 \u0110\u00e1nh gi\u00e1 Nh\u00e0 s\u1ea3n xu\u1ea5t c\u00e1p Cat6<\/h2>\n<p><strong>S\u1eed d\u1ee5ng s\u00e1u b\u01b0\u1edbc ki\u1ec3m tra \u0111\u1ec3 t\u00e1ch bi\u1ec7t c\u00e1c s\u1ef1 th\u1eadt \u0111\u00e3 \u0111\u01b0\u1ee3c ch\u1ee9ng minh kh\u1ecfi c\u00e1c tuy\u00ean b\u1ed1 b\u00e1n h\u00e0ng. M\u1ed9t h\u1ed3 s\u01a1 c\u00f2n thi\u1ebfu c\u00f3 th\u1ec3 kh\u1eafc ph\u1ee5c \u0111\u01b0\u1ee3c, nh\u01b0ng h\u00e3y g\u00e1n r\u00f5 ng\u01b0\u1eddi ch\u1ecbu tr\u00e1ch nhi\u1ec7m v\u00e0 th\u1eddi h\u1ea1n ho\u00e0n th\u00e0nh tr\u01b0\u1edbc khi b\u1ea1n ph\u00ea duy\u1ec7t \u0111\u01a1n h\u00e0ng.<\/strong><\/p>\n<h3>1. Danh t\u00ednh ph\u00e1p l\u00fd: C\u00f4ng ty \u0111\u01b0\u1ee3c b\u00e1o gi\u00e1 c\u00f3 ph\u1ea3i l\u00e0 nh\u00e0 m\u00e1y m\u00e0 b\u1ea1n s\u1ebd mua h\u00e0ng t\u1eeb kh\u00f4ng?<\/h3>\n<p>T\u1ea1i sao \u0111i\u1ec1u n\u00e0y quan tr\u1ecdng: C\u00f4ng ty b\u00e1o gi\u00e1, s\u1ea3n xu\u1ea5t c\u00e1p, nh\u1eadn thanh to\u00e1n v\u00e0 n\u1eafm gi\u1eef ch\u1ee9ng ch\u1ec9 c\u00f3 th\u1ec3 kh\u00f4ng ph\u1ea3i l\u00e0 c\u00f9ng m\u1ed9t \u0111\u01a1n v\u1ecb. B\u1ea1n c\u1ea7n c\u00f3 h\u1ed3 s\u01a1 r\u00f5 r\u00e0ng v\u1ec1 vai tr\u00f2 c\u1ee7a t\u1eebng b\u00ean.<\/p>\n<p>What to ask: Request the legal company name in Chinese and English, registered and production addresses, payment recipient and exporter if different. Ask which production, testing or packing steps are subcontracted.<\/p>\n<p>How to verify: Compare names and addresses across the registration documents, quotation, payment instructions, certificate record and product label. Ask for documents explaining any difference; \u201csame group\u201d alone does not establish who is responsible.<\/p>\n<p>Then check the claimed factory in practice. Ask which equipment is owned, leased or used through a production partner, where it operates, and who controls the work. Connect the actual site and machine identities to production and quality records for the offered cable. If needed, arrange a live walkthrough or an independent site visit; do not rely only on selected photos and edited videos.<\/p>\n<h3>2. Ph\u1ea1m vi s\u1ea3n ph\u1ea9m: M\u1eabu c\u00f3 kh\u1edbp v\u1edbi s\u1ea3n ph\u1ea9m b\u1ea1n s\u1ebd \u0111\u1eb7t h\u00e0ng kh\u00f4ng?<\/h3>\n<p>T\u1ea1i sao \u0111i\u1ec1u n\u00e0y quan tr\u1ecdng: M\u1eabu h\u00e0ng v\u00e0 b\u00e1o gi\u00e1 ph\u1ea3i m\u00f4 t\u1ea3 c\u00f9ng m\u1ed9t lo\u1ea1i c\u00e1p. H\u00e3y ki\u1ec3m tra tr\u1ef1c ti\u1ebfp \u0111i\u1ec1u n\u00e0y thay v\u00ec cho r\u1eb1ng m\u1ed9t m\u1eabu t\u1ed1t ch\u1ee9ng minh m\u1ecdi s\u1ea3n ph\u1ea9m m\u00e0 nh\u00e0 m\u00e1y b\u00e1n ra \u0111\u1ec1u \u0111\u1ea1t ch\u1ea5t l\u01b0\u1ee3ng.<\/p>\n<p>Evidence to request: Keep the drawing, BOM and sample under one agreed revision. Include material identities, conductor construction, dimensions and tolerances, pair lay lengths, any separator or screen, jacket marking and package length. Link the sample ID to its production lot and test file.<\/p>\n<p>If the price, product form or testing scope changes between the sample and the bulk order, ask for an updated specification. Confirm whether the original sample still represents the revised offer before approving it.<\/p>\n<p>Red flags: The sample has no traceable ID; the quotation says only \u201cCat6 UTP 23 AWG\u201d; the factory will decide the compound later; or the sales sample cannot be connected to a production batch, drawing and test record.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/cat6-acceptance-evidence-v2.jpg\" alt=\"Minh h\u1ecda gi\u1ea3i th\u00edch vi\u1ec7c t\u00e1ch bi\u1ec7t thi\u1ebft k\u1ebf c\u00e1p, h\u1ed3 s\u01a1 l\u00f4 s\u1ea3n xu\u1ea5t, x\u00e1c minh s\u1ea3n ph\u1ea9m \u0111\u1ed9c l\u1eadp v\u00e0 b\u1eb1ng ch\u1ee9ng li\u00ean k\u1ebft \u0111\u00e3 l\u1eafp \u0111\u1eb7t\" title=\"Match the evidence to the claim\" \/><\/p>\n<p><em>Explanatory illustration, not a certificate or a real test result. Keep design approval, lot release, independent product verification and installed-link reports separate when checking a supplier&#8217;s claims.<\/em><\/p>\n<h3>3. Khi\u1ebfu n\u1ea1i c\u1ee7a b\u00ean th\u1ee9 ba: C\u00e1c ch\u1ee9ng ch\u1ec9 c\u00f3 c\u00f2n hi\u1ec7u l\u1ef1c v\u00e0 c\u1ee5 th\u1ec3 cho t\u1eebng s\u1ea3n ph\u1ea9m kh\u00f4ng?<\/h3>\n<p>Decision criterion: Check each claimed approval against its issuer&#8217;s records. Match the holder, site where specified, product or construction, scope, current status and permitted mark. A supplier&#8217;s PDF is a starting point for verification.<\/p>\n<p>Gi\u1eef ba lo\u1ea1i b\u1eb1ng ch\u1ee9ng n\u00e0y ri\u00eang bi\u1ec7t.<\/p>\n<ul>\n<li>A Fluke test report records a test. Fluke states that it does not certify or endorse another manufacturer&#8217;s cabling components. Ask for the original result file and check the tested object, selected limits and instrument details; a cropped PASS screenshot is not enough.<sup id=\"fnref1:7\"><a href=\"#fn:7\" class=\"footnote-ref\">4<\/a><\/sup><\/li>\n<li>M\u1ed9t tuy\u00ean b\u1ed1 UL c\u1ea7n c\u00f3 h\u1ed3 s\u01a1 s\u1ea3n ph\u1ea9m li\u00ean quan v\u00e0 ph\u1ea1m vi \u0111\u00e1nh d\u1ea5u. Product iQ h\u1ed7 tr\u1ee3 t\u00ecm ki\u1ebfm theo c\u00e1c \u0111\u1ecbnh danh nh\u01b0 s\u1ed1 l\u01b0u tr\u1eef, s\u1ed1 ki\u1ec3m so\u00e1t danh m\u1ee5c v\u00e0 s\u1ed1 hi\u1ec7u c\u1ea5u t\u1ea1o.<sup id=\"fnref1:3\"><a href=\"#fn:3\" class=\"footnote-ref\">5<\/a><\/sup> H\u01b0\u1edbng d\u1eabn d\u00e2y v\u00e0 c\u00e1p c\u1ee7a UL ph\u00e2n bi\u1ec7t d\u1ea5u hi\u1ec7u nh\u1eadn d\u1ea1ng tr\u00ean cu\u1ed9n, \u1ed1ng qu\u1ea5n, th\u00e0nh b\u00ean ho\u1eb7c h\u1ed9p v\u1edbi ph\u1ea7n in b\u1ed5 sung tr\u00ean b\u1ec1 m\u1eb7t c\u00e1p.<sup id=\"fnref1:4\"><a href=\"#fn:4\" class=\"footnote-ref\">6<\/a><\/sup><\/li>\n<li>ISO 9001 concerns a quality-management system, not approval of the ordered Cat6 cable&#8217;s transmission performance. Check the certified company, site and scope as well as the issuing body and current status.<\/li>\n<\/ul>\n<p>IAF CertSearch cung c\u1ea5p th\u00f4ng tin v\u1ec1 c\u00f4ng ty, ti\u00eau chu\u1ea9n, tr\u1ea1ng th\u00e1i, ph\u1ea1m vi v\u00e0 t\u1ed5 ch\u1ee9c c\u1ea5p\/ch\u1ee9ng nh\u1eadn cho vi\u1ec7c ki\u1ec3m tra ch\u1ee9ng ch\u1ec9 h\u1ec7 th\u1ed1ng qu\u1ea3n l\u00fd.<sup id=\"fnref1:5\"><a href=\"#fn:5\" class=\"footnote-ref\">7<\/a><\/sup> If a record is missing or unclear, seek confirmation from the issuer rather than drawing a conclusion from the search alone. Which product approvals you need depends on the target market and order; these three items are not one universal certification package.<\/p>\n<p>C\u00e1ch x\u00e1c minh: L\u01b0u h\u1ed3 s\u01a1 x\u00e1c minh c\u00f3 ghi ng\u00e0y th\u00e1ng v\u00e0o h\u1ed3 s\u01a1 nh\u00e0 cung c\u1ea5p. Ki\u1ec3m tra l\u1ea1i tr\u01b0\u1edbc l\u00f4 h\u00e0ng \u0111\u1ea7u ti\u00ean v\u00e0 sau b\u1ea5t k\u1ef3 thay \u0111\u1ed5i n\u00e0o v\u1ec1 ng\u01b0\u1eddi gi\u1eef, \u0111\u1ecba \u0111i\u1ec3m, c\u1ea5u t\u1ea1o ho\u1eb7c nh\u00e3n m\u00e1c.<\/p>\n<h3>4. Ki\u1ec3m so\u00e1t quy tr\u00ecnh: Nh\u00e0 m\u00e1y c\u00f3 th\u1ec3 truy v\u1ebft k\u1ebft qu\u1ea3 ng\u01b0\u1ee3c l\u1ea1i qua qu\u00e1 tr\u00ecnh s\u1ea3n xu\u1ea5t kh\u00f4ng?<\/h3>\n<p>Why it matters: Final testing finds a problem; it does not fix the process that caused it. Ask whether each finished box or reel can be traced to its materials, production settings and test records.<\/p>\n<p>C\u00e1c <a href=\"https:\/\/hkcablemachine.com\/lan-cable-production-line-guide\/\">HONGKAI tuy\u1ebfn s\u1ea3n xu\u1ea5t c\u00e1p LAN<\/a> \u00e1nh x\u1ea1 qu\u00e1 tr\u00ecnh chu\u1ea9n b\u1ecb ru\u1ed9t d\u1eabn, c\u00e1ch \u0111i\u1ec7n l\u00f5i d\u00e2y, xo\u1eafn \u0111\u00f4i, b\u1ec7n c\u00e1p, l\u1edbp ch\u1eafn (n\u1ebfu c\u00f3), b\u1ecdc v\u1ecf, ki\u1ec3m tra \u0111i\u1ec7n v\u00e0 \u0111\u00f3ng g\u00f3i nh\u01b0 m\u1ed9t quy tr\u00ecnh li\u00ean k\u1ebft duy nh\u1ea5t. The <a href=\"https:\/\/hkcablemachine.com\/cat6-cable-compliance-testing-guide\/\">H\u01b0\u1edbng d\u1eabn tu\u00e2n th\u1ee7 ti\u00eau chu\u1ea9n nh\u00e0 m\u00e1y cho c\u00e1p Cat6<\/a> gi\u1ea3i th\u00edch l\u00fd do v\u00ec sao thi\u1ebft k\u1ebf c\u00e1p, vi\u1ec7c ph\u00ea duy\u1ec7t l\u00f4 s\u1ea3n xu\u1ea5t, x\u00e1c minh s\u1ea3n ph\u1ea9m \u0111\u1ed9c l\u1eadp v\u00e0 b\u1eb1ng ch\u1ee9ng v\u1ec1 li\u00ean k\u1ebft \u0111\u00e3 l\u1eafp \u0111\u1eb7t ph\u1ea3i \u0111\u01b0\u1ee3c gi\u1eef ri\u00eang bi\u1ec7t.<\/p>\n<p>Evidence to request: Choose one recent lot of the offered cable. Trace the conductor and compound batches through insulation, pair twisting, cabling, any screening, sheathing and final tests. Match the package label to that record, including failed tests and any rework. Use the approved product&#8217;s control limits, not generic numbers.<\/p>\n<p>Machine condition is part of this review. Older or simplified equipment is a reason to examine maintenance, tension and speed control, repeatability and production records more closely. Age alone does not prove poor quality, and a new machine alone does not prove stable production. Ask to see the actual setup making a comparable cable.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/05-cabling.webp\" alt=\"Existing HONGKAI 3D reference of LAN cable cabling and taping equipment with payoff stands and an enclosed main machine\" title=\"Inspect the actual production setup\" \/><\/p>\n<p><em>Existing HONGKAI 3D cabling-equipment reference. During a supplier review, inspect the actual line&#8217;s condition and production records; this reference is not evidence of that supplier&#8217;s factory or output.<\/em><\/p>\n<p>Also ask how the factory invests in product development and process improvement. A claimed research budget is only one indicator, not a Cat6 pass criterion. To check the capability behind it, request relevant engineering roles, development projects, trial and test records, and examples of documented improvements that the supplier can share. Use these as supporting evidence, without imposing an invented spending threshold.<\/p>\n<p>Red flags: The only test evidence is a cropped PASS screenshot; material lots are not recorded; failed first tests disappear after retesting; production settings are handwritten without product revision; or the sample room cannot identify which line and lot made the displayed cable.<\/p>\n<h3>5. B\u1eb1ng ch\u1ee9ng n\u0103ng l\u1ef1c: Nh\u00e0 m\u00e1y c\u00f3 th\u1ec3 \u0111\u00e1p \u1ee9ng \u0111\u01a1n h\u00e0ng n\u00e0y v\u1edbi ph\u01b0\u01a1ng \u00e1n thi c\u00f4ng \u0111\u00e3 \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t kh\u00f4ng?<\/h3>\n<p>Decision criterion: Use the stable production speed at which the specified cable passes its agreed tests. Do not use the machine&#8217;s brochure maximum or the tester&#8217;s measurement speed as the production rate.<\/p>\n<p>Ask what speed the line was running when it produced cable that passed the specified test. Connect the product revision, run date and line speed to the lot&#8217;s quality records. A short demonstration is useful, but it does not by itself establish sustained output.<\/p>\n<p>How to verify: Build the delivery calculation from that supported rate, available shifts, stoppages, changeovers, usable yield and the slowest stage. Include testing and packing, and check what capacity is already booked. For a new construction, make pilot-run evidence a condition before accepting a volume promise.<\/p>\n<p>Common mistakes: Multiplying brochure maximum speed by operating hours; counting every machine as available for the order; ignoring setup, material change, test, packing and rework time; or accepting a monthly total that mixes different cable types and package units.<\/p>\n<h3>6. Ki\u1ec3m so\u00e1t thay \u0111\u1ed5i: C\u00e1p \u0111\u00e3 \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t c\u00f3 ph\u1ea3i l\u00e0 c\u00e1p \u0111\u01b0\u1ee3c giao kh\u00f4ng?<\/h3>\n<p>What to ask: Define which changes require written buyer approval or renewed evidence. Typical decision fields include conductor source or construction, insulation and jacket compounds, foaming route, pair lay plan, separator or screen materials, manufacturing site, process route, test method, marking and packaging.<\/p>\n<p>Evidence to request: Attach the approved drawing, BOM revision, sample ID, test plan and accepted deviations to the order. Agree how changes will be approved, how failed results and retests will be recorded, and who can stop shipment when the delivered product or evidence does not match.<\/p>\n<p>Red flags: The contract permits \u201cequivalent material\u201d without a review path; the golden sample has no sealed or photographed identity; the sales team can change construction verbally; or the pre-shipment inspector receives only a visual checklist with no product-specific data.<\/p>\n<h2>So s\u00e1nh c\u00e1c nh\u00e0 cung c\u1ea5p trong danh s\u00e1ch ng\u1eafn g\u1ecdn b\u1eb1ng m\u1ed9t ma tr\u1eadn minh ch\u1ee9ng<\/h2>\n<p>Do not total vague scores before resolving hard gates. Record a finding as verified, conditional or not demonstrated, and keep the evidence link or document reference in the same row.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/cat6-test-record-pass-rate-v1.jpg\" alt=\"Phi\u1ebfu ki\u1ec3m tra ghi ch\u00e9p k\u1ebft qu\u1ea3 th\u1eed nghi\u1ec7m Cat6 c\u00f3 gi\u1ea3i th\u00edch, li\u00ean k\u1ebft th\u00f4ng tin nh\u1eadn d\u1ea1ng m\u1eabu, thi\u1ebft l\u1eadp th\u1eed nghi\u1ec7m, chi ti\u1ebft thi\u1ebft b\u1ecb v\u00e0 to\u00e0n b\u1ed9 t\u1ec7p k\u1ebft qu\u1ea3\" title=\"Compare traceable records\" \/><\/p>\n<p><em>Explanatory illustration, not supplier performance data. If suppliers quote a pass rate, compare the same test configuration and agreed unit; passed units divided by tested units gives the rate. Record first tests and retests separately. No minimum acceptance percentage is implied.<\/em><\/p>\n<table>\n<thead>\n<tr>\n<th>Evidence gate<\/th>\n<th>Verified<\/th>\n<th>Conditional<\/th>\n<th>Gi\u1eef l\u1ea1i ho\u1eb7c t\u1eeb ch\u1ed1i cho \u0111\u1ebfn khi \u0111\u01b0\u1ee3c gi\u1ea3i quy\u1ebft<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Danh t\u00ednh c\u00f4ng ty v\u00e0 \u0111\u1ecba \u0111i\u1ec3m<\/td>\n<td>H\u1ee3p \u0111\u1ed3ng, th\u1ef1c th\u1ec3 thanh to\u00e1n, \u0111\u1ecba \u0111i\u1ec3m s\u1ea3n xu\u1ea5t v\u00e0 c\u00e1c ph\u00ea duy\u1ec7t \u0111\u01b0\u1ee3c y\u00eau c\u1ea7u \u0111\u00e3 \u0111\u01b0\u1ee3c \u0111\u1ed1i chi\u1ebfu<\/td>\n<td>M\u1ed9t th\u1ef1c th\u1ec3 li\u00ean quan ho\u1eb7c nh\u00e0 th\u1ea7u ph\u1ee5 \u0111\u01b0\u1ee3c ti\u1ebft l\u1ed9 k\u00e8m theo t\u00e0i li\u1ec7u v\u00e0 tr\u00e1ch nhi\u1ec7m<\/td>\n<td>Kh\u00f4ng th\u1ec3 \u0111\u1ed1i chi\u1ebfu \u0111\u01b0\u1ee3c th\u00f4ng tin thanh to\u00e1n, s\u1ea3n xu\u1ea5t ho\u1eb7c danh t\u00ednh ch\u1ee9ng ch\u1ec9<\/td>\n<\/tr>\n<tr>\n<td>Product definition<\/td>\n<td>B\u00e1o gi\u00e1, b\u1ea3n v\u1ebd, BOM, m\u1eabu v\u00e0 nh\u00e3n chia s\u1ebb c\u00f9ng m\u1ed9t phi\u00ean b\u1ea3n s\u1eeda \u0111\u1ed5i<\/td>\n<td>C\u00e1c khu \u0111\u1ea5t tr\u1ed1ng nh\u1ecf c\u00f3 ch\u1ee7 s\u1edf h\u1eefu v\u00e0 th\u1eddi h\u1ea1n c\u1ee5 th\u1ec3 tr\u01b0\u1edbc khi s\u1ea3n xu\u1ea5t<\/td>\n<td>\u201cCat6\u201d l\u00e0 \u0111\u1eb7c t\u1ea3 \u1ed5n \u0111\u1ecbnh duy nh\u1ea5t<\/td>\n<\/tr>\n<tr>\n<td>Khi\u1ebfu n\u1ea1i c\u1ee7a b\u00ean th\u1ee9 ba<\/td>\n<td>H\u1ed3 s\u01a1 t\u1ed5 ch\u1ee9c c\u1ea5p hi\u1ec7n t\u1ea1i ph\u00f9 h\u1ee3p v\u1edbi ph\u1ea1m vi v\u1ec1 ch\u1ee7 s\u1edf h\u1eefu, \u0111\u1ecba \u0111i\u1ec3m, s\u1ea3n ph\u1ea9m v\u00e0 ghi nh\u00e3n<\/td>\n<td>H\u1ed3 s\u01a1 c\u00f4ng khai kh\u00f4ng \u0111\u1ea7y \u0111\u1ee7 v\u00e0 \u0111ang ch\u1edd x\u00e1c nh\u1eadn b\u1eb1ng v\u0103n b\u1ea3n t\u1eeb b\u00ean ph\u00e1t h\u00e0nh<\/td>\n<td>Logo, \u1ea3nh ch\u1ee5p m\u00e0n h\u00ecnh ho\u1eb7c ch\u1ee9ng ch\u1ec9 kh\u00f4ng li\u00ean quan \u0111\u01b0\u1ee3c tr\u00ecnh b\u00e0y nh\u01b0 l\u00e0 b\u1eb1ng ch\u1ee9ng v\u1ec1 ph\u1ea1m vi b\u1ea3o hi\u1ec3m<\/td>\n<\/tr>\n<tr>\n<td>Production traceability<\/td>\n<td>M\u1ed9t l\u00f4 h\u00e0ng c\u00f3 th\u1ec3 \u0111\u01b0\u1ee3c truy xu\u1ea5t t\u1eeb nguy\u00ean v\u1eadt li\u1ec7u qua c\u00e1c qu\u00e1 tr\u00ecnh, ki\u1ec3m tra v\u00e0 \u0111\u00f3ng g\u00f3i<\/td>\n<td>M\u1ed9t kho\u1ea3ng tr\u1ed1ng c\u00f3 h\u00e0nh \u0111\u1ed9ng kh\u1eafc ph\u1ee5c v\u00e0 ph\u1ea3i \u0111\u01b0\u1ee3c \u0111\u00f3ng l\u1ea1i tr\u01b0\u1edbc khi ph\u00e1t h\u00e0nh \u0111\u01a1n h\u00e0ng<\/td>\n<td>M\u1eabu hi\u1ec3n th\u1ecb ho\u1eb7c k\u1ebft qu\u1ea3 PASS kh\u00f4ng c\u00f3 th\u00f4ng tin l\u00f4 v\u00e0 quy tr\u00ecnh<\/td>\n<\/tr>\n<tr>\n<td>N\u0103ng l\u1ef1c v\u00e0 giao h\u00e0ng<\/td>\n<td>T\u00ednh to\u00e1n \u0111\u01b0\u1ee3c h\u1ed7 tr\u1ee3 b\u1edfi c\u00e1c h\u1ed3 s\u01a1 s\u1ea3n xu\u1ea5t t\u01b0\u01a1ng \u0111\u01b0\u01a1ng v\u00e0 h\u1ed3 s\u01a1 c\u1ed5 chai<\/td>\n<td>C\u1ea7n c\u00f3 b\u1eb1ng ch\u1ee9ng th\u1eed nghi\u1ec7m ho\u1eb7c ch\u1ea1y th\u1eed \u0111\u1ea7u ti\u00ean tr\u01b0\u1edbc khi \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t s\u1ea3n xu\u1ea5t h\u00e0ng lo\u1ea1t<\/td>\n<td>T\u1ed1c \u0111\u1ed9 brochure, di\u1ec7n t\u00edch nh\u00e0 m\u00e1y ho\u1eb7c cam k\u1ebft b\u00e1n h\u00e0ng l\u00e0 b\u1eb1ng ch\u1ee9ng duy nh\u1ea5t<\/td>\n<\/tr>\n<tr>\n<td>Order controls<\/td>\n<td>S\u1ea3n ph\u1ea9m, k\u1ebf ho\u1ea1ch th\u1eed nghi\u1ec7m, ph\u00ea duy\u1ec7t thay \u0111\u1ed5i v\u00e0 ph\u00ea duy\u1ec7t xu\u1ea5t h\u00e0ng \u0111\u00e3 \u0111\u01b0\u1ee3c th\u1ed1ng nh\u1ea5t b\u1eb1ng v\u0103n b\u1ea3n<\/td>\n<td>C\u00e1c t\u00e0i li\u1ec7u c\u00f2n thi\u1ebfu ph\u1ea3i \u0111\u01b0\u1ee3c \u0111\u00ednh k\u00e8m tr\u01b0\u1edbc khi ph\u00ea duy\u1ec7t \u0111\u01a1n h\u00e0ng ho\u1eb7c s\u1ea3n xu\u1ea5t<\/td>\n<td>Vi\u1ec7c thay th\u1ebf v\u00e0 ch\u1ea5p nh\u1eadn v\u1eabn ch\u01b0a \u0111\u01b0\u1ee3c x\u00e1c \u0111\u1ecbnh<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>How to verify: Ask a colleague or third-party auditor to pick one finished package at random and reconstruct its evidence chain. A presentation assembled only from the supplier&#8217;s best sample is not the same as a traceable production record.<\/p>\n<h2>Chuy\u1ec3n Danh s\u00e1ch r\u00fat g\u1ecdn th\u00e0nh \u0110\u01a1n h\u00e0ng \u0111\u1ea7u ti\u00ean c\u00f3 ki\u1ec3m so\u00e1t<\/h2>\n<p><strong>Before the first order, write down what will be tested, at what length, by which method and against which pass criteria. \u201cMust pass Fluke\u201d does not contain enough information to settle an acceptance disagreement.<\/strong><\/p>\n<p>Complete this test-agreement worksheet before production, alongside the approved product specification. Fill the fields from the buyer&#8217;s requirement and applicable method; no single test length or instrument suits every Cat6 order.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/cat6-fluke-test-forms-v1.jpg\" alt=\"So s\u00e1nh kh\u00e1i ni\u1ec7m gi\u1eefa cu\u1ed9n c\u00e1p Cat6 \u0111\u00f3ng g\u00f3i s\u1eb5n, m\u1eabu th\u1eed \u0111\u00e3 chu\u1ea9n b\u1ecb, k\u00eanh \u0111\u00e3 l\u1eafp \u0111\u1eb7t v\u00e0 d\u00e2y nh\u1ea3y \u0111\u1ed9c l\u1eadp\" title=\"Agree the test object first\" \/><\/p>\n<p><em>Explanatory comparison, not a wiring instruction. The pictured reel and channel lengths describe different example configurations, not a default factory test length. Agree the test object, method, adapters and limits for the order; a patch-cord test is not the same as a channel test.<sup id=\"fnref2:6\"><a href=\"#fn:6\" class=\"footnote-ref\">3<\/a><\/sup><\/em><\/p>\n<table>\n<thead>\n<tr>\n<th>Acceptance field<\/th>\n<th>\u0110i\u1ec1u m\u00e0 ng\u01b0\u1eddi mua v\u00e0 nh\u00e0 cung c\u1ea5p n\u00ean ghi ch\u00e9p l\u1ea1i<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product form<\/td>\n<td>Model v\u00e0 phi\u00ean b\u1ea3n ch\u00ednh x\u00e1c; c\u00e1p cu\u1ed9n\/th\u00f9ng l\u1edbn ho\u1eb7c d\u00e2y nh\u1ea3y ho\u00e0n ch\u1ec9nh; bao b\u00ec v\u00e0 s\u1ed1 l\u01b0\u1ee3ng \u0111\u1eb7t h\u00e0ng<\/td>\n<\/tr>\n<tr>\n<td>M\u1eabu v\u00e0 \u0111\u1ed1i t\u01b0\u1ee3ng th\u1eed nghi\u1ec7m<\/td>\n<td>M\u00e3 l\u00f4 v\u00e0 m\u00e3 m\u1eabu; m\u1eabu c\u00e1p, d\u00e2y nh\u1ea3y \u0111\u1ed9c l\u1eadp, li\u00ean k\u1ebft c\u1ed1 \u0111\u1ecbnh ho\u1eb7c k\u00eanh; l\u1ef1a ch\u1ecdn v\u00e0 chu\u1ea9n b\u1ecb m\u1eabu<\/td>\n<\/tr>\n<tr>\n<td>Test length<\/td>\n<td>Chi\u1ec1u d\u00e0i \u0111\u00e3 th\u1ecfa thu\u1eadn t\u00ednh b\u1eb1ng m\u00e9t, c\u00e1ch \u0111o chi\u1ec1u d\u00e0i \u0111\u00f3 v\u00e0 vi\u1ec7c th\u1eed nghi\u1ec7m \u0111\u01b0\u1ee3c th\u1ef1c hi\u1ec7n tr\u00ean to\u00e0n b\u1ed9 cu\u1ed9n h\u00e0ng hay tr\u00ean m\u1eabu \u0111\u00e3 chu\u1ea9n b\u1ecb<\/td>\n<\/tr>\n<tr>\n<td>Thi\u1ebft b\u1ecb v\u00e0 c\u00e1c k\u1ebft n\u1ed1i<\/td>\n<td>H\u1ec7 th\u1ed1ng Fluke ho\u1eb7c h\u1ec7 th\u1ed1ng kh\u00e1c \u0111\u01b0\u1ee3c th\u1ecfa thu\u1eadn, bao g\u1ed3m model, t\u00ecnh tr\u1ea1ng hi\u1ec7u chu\u1ea9n, ph\u1ea7n m\u1ec1m, \u0111\u1ed3 g\u00e1\/b\u1ed9 chuy\u1ec3n \u0111\u1ed5i v\u00e0 c\u00e1ch b\u1ed1 tr\u00ed k\u1ebft n\u1ed1i ph\u00f9 h\u1ee3p v\u1edbi ph\u01b0\u01a1ng ph\u00e1p<\/td>\n<\/tr>\n<tr>\n<td>Ti\u00eau chu\u1ea9n v\u00e0 ti\u00eau ch\u00ed \u0111\u1ea1t<\/td>\n<td>T\u00e0i li\u1ec7u \u0111i\u1ec1u ch\u1ec9nh v\u00e0 phi\u00ean b\u1ea3n, b\u1ed9 th\u1eed nghi\u1ec7m\/gi\u1edbi h\u1ea1n \u0111\u00e3 ch\u1ecdn, c\u00e1c th\u00f4ng s\u1ed1 y\u00eau c\u1ea7u v\u00e0 c\u00e1c y\u00eau c\u1ea7u c\u1ee5 th\u1ec3 c\u1ee7a kh\u00e1ch h\u00e0ng<\/td>\n<\/tr>\n<tr>\n<td>K\u1ebft qu\u1ea3 v\u00e0 ph\u00e1t h\u00e0nh<\/td>\n<td>C\u00e1c t\u1ec7p k\u1ebft qu\u1ea3 g\u1ed1c, bi\u1ec3u \u0111\u1ed3 khi c\u1ea7n thi\u1ebft, ng\u00e0y v\u00e0 ng\u01b0\u1eddi v\u1eadn h\u00e0nh, tham chi\u1ebfu l\u00f4 h\u00e0ng, l\u1ecbch s\u1eed l\u1ed7i\/ki\u1ec3m tra l\u1ea1i v\u00e0 ng\u01b0\u1eddi ph\u00ea duy\u1ec7t vi\u1ec7c giao h\u00e0ng<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Keep package length and test length as separate fields. Testing a prepared sample from a box does not mean the whole packaged length was tested in that configuration. Likewise, an installed-channel result should not be relabelled as a standalone patch-cord result.<\/p>\n<p>Before shipment, compare the production lot with the approved specification and sample. Check labels, quantity, the agreed inspection results and any failed tests or rework. Record deviations and resolve them through the agreed release process. Keep the first accepted lot&#8217;s record pack as the comparison point for repeat orders.<\/p>\n<p>Pitfalls: A buyer approves a polished sample but not its BOM; pays an exporter without reconciling the manufacturer; asks for \u201cfull Cat6 test\u201d without naming the test object; or allows shipment because the cable appearance matches while the traceability and raw results remain missing.<\/p>\n<h2>N\u01a1i HONGKAI B\u1eb1ng ch\u1ee9ng Thi\u1ebft b\u1ecb Ph\u00f9 h\u1ee3p<\/h2>\n<p><strong>HONGKAI can help review whether a proposed cable construction matches the equipment and production route. That is different from certifying a finished-cable manufacturer or independently approving its product.<\/strong><\/p>\n<p>C\u00e1c <a href=\"https:\/\/hkcablemachine.com\/cat-6-network-cable-production-line\/\">HONGKAI Tham chi\u1ebfu d\u00e2y chuy\u1ec1n s\u1ea3n xu\u1ea5t Cat6<\/a> provides a starting point for equipment questions. Match the actual drawing, materials, process controls and production target to the proposed configuration. A machine picture or equipment list does not prove a cable supplier&#8217;s ownership, available capacity or certification.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/09\/04-pair-twisting.webp\" alt=\"Existing HONGKAI 3D reference of a LAN cable back-twist payoff and pair-twisting system\" title=\"Review the actual pairing setup\" \/><\/p>\n<p><em>Existing HONGKAI 3D equipment reference, not a factory-audit photo. Use it to frame questions about the actual pairing setup, tension control and process records. The pictured equipment does not establish any supplier&#8217;s ownership, available output or cable approval.<\/em><\/p>\n<p>For a machinery project, agree the supplied equipment, any integration, factory acceptance test (FAT), training and exclusions in the project scope. Product certification, independent factory audits and shipment acceptance need their own named responsible parties; they are not implied services.<\/p>\n<p>Choose the supplier that can connect your exact cable to a matching sample, relevant tests, controlled production and a credible delivery plan. Keep those same requirements in the first order and every repeat order.<\/p>\n<div class=\"footnotes\">\n<hr \/>\n<ol>\n<li id=\"fn:1\">\n<p><a href=\"https:\/\/tiaonline.org\/standardannouncement\/tia-publishes-new-standards-ansi-tia-568-2-e-and-ansi-tia-568-5-1\/\" rel=\"nofollow noopener\" target=\"_blank\">Th\u00f4ng b\u00e1o c\u1ee7a TIA v\u1ec1 ANSI\/TIA-568.2-E<\/a>, dated November 5, 2024; identifies the cabling and components standard, not a factory certificate.&#160;<a href=\"#fnref1:1\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:2\">\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/66838\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61156-5:2020 RLV publication page<\/a>, ch\u1ec9 \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng cho ph\u1ea1m vi c\u00f4ng c\u1ed9ng c\u1ee7a ti\u00eau chu\u1ea9n; RLV bao g\u1ed3m ti\u00eau chu\u1ea9n v\u00e0 phi\u00ean b\u1ea3n redline c\u1ee7a n\u00f3, kh\u00f4ng ph\u1ea3i quy tr\u00ecnh th\u1eed nghi\u1ec7m \u0111\u1ea7y \u0111\u1ee7 mi\u1ec5n ph\u00ed.<a href=\"#fnref1:2\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:6\">\n<p><a href=\"https:\/\/www.flukenetworks.com\/blog\/cabling-chronicles\/channel-permanent-link-patch-cords-mptl-e2e-oh-my\" rel=\"nofollow noopener\" target=\"_blank\">Fluke Networks: Ki\u1ec3m tra k\u00eanh, li\u00ean k\u1ebft c\u1ed1 \u0111\u1ecbnh v\u00e0 c\u00e1p n\u1ed1i<\/a>, \u0111\u01b0\u1ee3c d\u00f9ng \u0111\u1ec3 ph\u00e2n bi\u1ec7t gi\u1eefa c\u00e1c lo\u1ea1i k\u1ebft n\u1ed1i \u0111\u00e3 \u0111\u01b0\u1ee3c ki\u1ec3m tra v\u00e0 c\u00e1c \u0111\u1ea7u n\u1ed1i d\u00e2y nh\u1ea3y; kh\u00f4ng d\u00e0nh cho \u0111\u1ed9 d\u00e0i ki\u1ec3m tra c\u00e1p nguy\u00ean cu\u1ed9n ph\u1ed5 qu\u00e1t hay phi\u00ean b\u1ea3n ti\u00eau chu\u1ea9n hi\u1ec7n h\u00e0nh.<a href=\"#fnref1:6\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a> <a href=\"#fnref2:6\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:7\">\n<p><a href=\"https:\/\/www.flukenetworks.com\/blog\/cabling-chronicles\/third-party-network-cable-certification\" rel=\"nofollow noopener\" target=\"_blank\">Fluke Networks: Ch\u1ee9ng nh\u1eadn c\u00e1p m\u1ea1ng c\u1ee7a b\u00ean th\u1ee9 ba<\/a>, \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng \u0111\u1ec3 ph\u00e2n bi\u1ec7t gi\u1eefa b\u00e1o c\u00e1o c\u1ee7a \u0111\u01a1n v\u1ecb th\u1eed nghi\u1ec7m v\u00e0 ch\u1ee9ng nh\u1eadn s\u1ea3n ph\u1ea9m \u0111\u1ed9c l\u1eadp, c\u0169ng nh\u01b0 nhu c\u1ea7u ki\u1ec3m tra c\u00e1c k\u1ebft qu\u1ea3 g\u1ed1c v\u00e0 c\u00e1ch thi\u1ebft l\u1eadp c\u1ee7a ch\u00fang.<a href=\"#fnref1:7\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:3\">\n<p><a href=\"https:\/\/www.ul.com\/software\/product-sourcing-and-certifications-database\" rel=\"nofollow noopener\" target=\"_blank\">T\u1ed5ng quan v\u1ec1 Product iQ c\u1ee7a UL Solutions<\/a>, \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng cho c\u00e1c tr\u01b0\u1eddng t\u00ecm ki\u1ebfm h\u1ed3 s\u01a1 ch\u1ee9ng nh\u1eadn v\u00e0 m\u1ee5c \u0111\u00edch x\u00e1c minh.<a href=\"#fnref1:3\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:4\">\n<p><a href=\"https:\/\/www.ul.com\/thecodeauthority\/knowledge\/wire-cable-guide\" rel=\"nofollow noopener\" target=\"_blank\">UL H\u01b0\u1edbng d\u1eabn \u1ee8ng d\u1ee5ng D\u00e2y v\u00e0 C\u00e1p<\/a>, \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng \u0111\u1ec3 ph\u00e2n bi\u1ec7t gi\u1eefa nh\u1eadn d\u1ea1ng g\u00f3i h\u00e0ng ho\u1eb7c cu\u1ed9n d\u00e2y v\u00e0 in ph\u1ee5 tr\u00ean b\u1ec1 m\u1eb7t c\u00e1p.<a href=\"#fnref1:4\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<li id=\"fn:5\">\n<p><a href=\"https:\/\/www.iafcertsearch.org\/services\/certificate-search\" rel=\"nofollow noopener\" target=\"_blank\">H\u01b0\u1edbng d\u1eabn x\u00e1c minh ch\u1ee9ng ch\u1ec9 IAF CertSearch<\/a>, \u0111\u01b0\u1ee3c s\u1eed d\u1ee5ng \u0111\u1ec3 ki\u1ec3m tra th\u00f4ng tin \u0111\u1ecbnh danh, tr\u1ea1ng th\u00e1i, ph\u1ea1m vi v\u00e0 t\u1ed5 ch\u1ee9c c\u1ea5p ch\u1ee9ng ch\u1ec9 c\u1ee7a h\u1ec7 th\u1ed1ng qu\u1ea3n l\u00fd.<a href=\"#fnref1:5\" rev=\"footnote\" class=\"footnote-backref\">\u21a9<\/a><\/p>\n<\/li>\n<\/ol>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>M\u1ed9t l\u1ed9 tr\u00ecnh th\u1ef1c t\u1ebf t\u1eeb vi\u1ec7c t\u00ecm ki\u1ebfm c\u00e1c \u1ee9ng vi\u00ean nh\u00e0 cung c\u1ea5p c\u00e1p Cat6 \u0111\u1ebfn so s\u00e1nh b\u1eb1ng ch\u1ee9ng v\u00e0 th\u1ed1ng nh\u1ea5t c\u00e1c \u0111i\u1ec1u kho\u1ea3n v\u1ec1 s\u1ea3n ph\u1ea9m, th\u1eed nghi\u1ec7m v\u00e0 nghi\u1ec7m thu cho \u0111\u01a1n h\u00e0ng \u0111\u1ea7u ti\u00ean.<\/p>","protected":false},"author":1,"featured_media":17002,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_angie_page":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"page_builder":"","thumbnail_url":"","footnotes":""},"categories":[892,404,879],"tags":[],"buyer-route":[2686,2687,2689],"process":[2690],"class_list":["post-13912","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lan-cable","category-investment","category-knowledge","buyer-route-factory","buyer-route-cable","buyer-route-problem","process-extrusion"],"acf":[],"_links":{"self":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts\/13912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/comments?post=13912"}],"version-history":[{"count":2,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts\/13912\/revisions"}],"predecessor-version":[{"id":17035,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/posts\/13912\/revisions\/17035"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/media\/17002"}],"wp:attachment":[{"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/media?parent=13912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/categories?post=13912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/tags?post=13912"},{"taxonomy":"buyer-route","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/buyer-route?post=13912"},{"taxonomy":"process","embeddable":true,"href":"https:\/\/hkcablemachine.com\/vi\/wp-json\/wp\/v2\/process?post=13912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}