{"id":16418,"date":"2026-08-28T17:08:56","date_gmt":"2026-08-28T09:08:56","guid":{"rendered":"https:\/\/hkcablemachine.com\/?p=16418"},"modified":"2026-08-29T00:17:25","modified_gmt":"2026-08-28T16:17:25","slug":"mpo-cable-manufacturing-process","status":"publish","type":"post","link":"https:\/\/hkcablemachine.com\/fa\/mpo-cable-manufacturing-process\/","title":{"rendered":"\u0641\u0631\u0622\u06cc\u0646\u062f \u062a\u0648\u0644\u06cc\u062f \u06a9\u0627\u0628\u0644 MPO: \u0627\u0632 \u06a9\u0627\u0628\u0644 \u062a\u0627 \u0645\u0648\u0646\u062a\u0627\u0698 \u0646\u0647\u0627\u06cc\u06cc"},"content":{"rendered":"<p>A buyer planning an MPO cable manufacturing process has one central decision. Can the proposed scope release the finished assembly with every channel identified and tested? That decision is broader than choosing a polishing machine.<\/p>\n<p><strong>A complete project links two systems. The GJFJV-type cable route makes and bundles the individual tight-buffered fibers. The MPO workcell then separates, orders and loads them into the ferrule. Both the base cable and the finished assembly need their own release evidence.<\/strong><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/08\/mpo-gjfjv-to-ferrule-transition-3d-v2.webp\" alt=\"Twelve tight-buffered fibers bundled inside GJFJV cable and separated into one MPO ferrule row\" title=\"GJFJV bundle to MPO array transition\" \/><\/p>\n<p><em>Verified-structure 3D reference: this 12-core GJFJV example has a bundled core. The ordered row is formed during ferrule preparation; the signed product drawing controls the saleable construction.<\/em><\/p>\n<p>This distinction matters because MPO is a connector interface, not a universal cable construction. The project in this guide uses an indoor multi-core GJFJV-type tight-buffer cable as the reference input. A different launch cable, ferrule family, polarity or optical specification can change the machines, fixtures, test paths and FAT sample.<\/p>\n<p>\u0628\u0631\u0627\u06cc \u06af\u0631\u062f\u0634 \u06a9\u0627\u0631 \u0633\u0646\u062a\u06cc \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u062a\u06a9\u200c\u0641\u06cc\u0628\u0631\u060c \u0628\u0647 <a href=\"https:\/\/hkcablemachine.com\/how-to-make-fiber-optic-patch-cord-step-by-step\/\">\u0631\u0627\u0647\u0646\u0645\u0627\u06cc \u062a\u0648\u0644\u06cc\u062f \u06a9\u0627\u0628\u0644 \u0631\u0634\u062a\u0647\u200c\u0627\u06cc \u0641\u06cc\u0628\u0631 \u0646\u0648\u0631\u06cc<\/a>. \u0622\u0646 \u0645\u0633\u06cc\u0631 \u0644\u06cc\u0633\u062a \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0627\u06cc\u0646 \u0633\u0644\u0648\u0644 \u06a9\u0627\u0631\u06cc MPO \u0646\u06cc\u0633\u062a.<\/p>\n<h2>\u0645\u062d\u062f\u0648\u062f\u0647\u200c\u0627\u06cc \u0628\u0631\u0627\u06cc \u0627\u0646\u062c\u0645\u0627\u062f \u0642\u0628\u0644 \u0627\u0632 \u0627\u0631\u0627\u0626\u0647 \u067e\u06cc\u0634\u0646\u0647\u0627\u062f \u0628\u0631\u0627\u06cc \u062e\u0637 \u06a9\u0627\u0645\u0644<\/h2>\n<p>Freeze the finished assembly, base-cable drawing and release evidence before choosing equipment. An \u201cMPO line\u201d quotation is incomplete without the cable construction, fiber count, connector interface, key orientation, polarity, polish, optical method and traceability unit. These inputs determine the cable-line configuration and the back-end fixtures.<\/p>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/67605\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60794-2-23:2024<\/a> addresses indoor multi-fiber cables used in MPO-terminated assemblies. <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/5847\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61754-7-1:2014<\/a> \u0648 <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/30239\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61754-7-2:2017<\/a> cover one-row and two-row MPO interface variants. These publications help define the relevant product and interface layers. The buyer still has to approve the cable drawing, materials, process route and acceptance limits.<\/p>\n<table>\n<thead>\n<tr>\n<th>\u0648\u0631\u0648\u062f\u06cc \u0628\u0631\u0627\u06cc \u0641\u0631\u06cc\u0632 \u06a9\u0631\u062f\u0646<\/th>\n<th>\u062a\u0635\u0645\u06cc\u0645 \u062e\u0631\u06cc\u062f\u0627\u0631<\/th>\n<th>Equipment consequence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Finished product<\/td>\n<td>\u0627\u0633\u0645 \u0645\u0648\u0646\u062a\u0627\u0698\u060c \u0641\u0631\u0645\u062a \u0637\u0648\u0644 \u0648 \u0634\u0627\u062e\u0647<\/td>\n<td>\u0628\u0631\u0634\u060c \u0633\u064f\u0631\u06a9\u0634\u06cc\u060c \u062c\u0627\u0628\u062c\u0627\u06cc\u06cc\u060c \u0628\u0631\u0686\u0633\u0628\u200c\u06af\u0630\u0627\u0631\u06cc \u0648 \u062f\u0633\u062a\u0631\u0633\u06cc \u0622\u0632\u0645\u0648\u0646<\/td>\n<\/tr>\n<tr>\n<td>\u0633\u0627\u062e\u062a\u0627\u0631 \u06a9\u0627\u0628\u0644<\/td>\n<td>\u062a\u0639\u062f\u0627\u062f \u0641\u06cc\u0628\u0631\u060c \u0686\u06cc\u062f\u0645\u0627\u0646 \u0628\u0627\u0641\u0631 \u0641\u0634\u0631\u062f\u0647\u060c \u0633\u06cc\u0633\u062a\u0645 \u0622\u0631\u0627\u0645\u06cc\u062f \u0648 \u0631\u0648\u06a9\u0634<\/td>\n<td>\u067e\u06cc\u200c\u0627\u0641\u200c\u0647\u0627\u060c \u062c\u0645\u0639\u200c\u0622\u0648\u0631\u06cc\u060c \u0627\u0628\u0632\u0627\u0631\u0647\u0627\u06cc \u0627\u06a9\u0633\u062a\u0631\u0648\u0698\u0646\u060c \u0631\u0627\u0647\u0646\u0645\u0627\u0647\u0627 \u0648 \u0633\u06cc\u0633\u062a\u0645 \u06a9\u0634\u0634<\/td>\n<\/tr>\n<tr>\n<td>Connector system<\/td>\n<td>\u0631\u062f\u06cc\u0641 \u0641\u0650\u0631\u0648\u0644\u060c \u062c\u0646\u0633\u06cc\u062a\u060c \u062c\u0647\u062a\u200c\u06af\u06cc\u0631\u06cc \u06a9\u0644\u06cc\u062f\u060c \u0647\u0648\u0633\u06cc\u0646\u06af \u0648 \u067e\u0648\u0644\u06cc\u0634<\/td>\n<td>\u0646\u06af\u0647\u062f\u0627\u0631\u0646\u062f\u0647\u200c\u0647\u0627\u06cc \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u0648 \u0639\u0645\u0644\u200c\u0622\u0648\u0631\u06cc\u060c \u0641\u06cc\u06a9\u0633\u0686\u0631 \u067e\u0648\u0644\u06cc\u0634 \u0648 \u0622\u062f\u0627\u067e\u062a\u0648\u0631\u0647\u0627\u06cc \u0622\u0632\u0645\u0627\u06cc\u0634<\/td>\n<\/tr>\n<tr>\n<td>\u0646\u0642\u0634\u0647 \u0641\u06cc\u0628\u0631 \u0648 \u06a9\u0627\u0646\u0627\u0644<\/td>\n<td>\u062f\u0633\u062a\u0647\u200c\u0628\u0646\u062f\u06cc \u0641\u06cc\u0628\u0631\u060c \u062a\u0639\u062f\u0627\u062f\u060c \u0646\u0642\u0634\u0647 \u0645\u0648\u0642\u0639\u06cc\u062a \u0648 \u0642\u0637\u0628\u06cc\u062a \u0627\u0632 \u0627\u0628\u062a\u062f\u0627 \u062a\u0627 \u0627\u0646\u062a\u0647\u0627<\/td>\n<td>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0622\u0631\u0627\u06cc\u0647\u060c \u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644 \u06a9\u0627\u0631\u060c \u062a\u0633\u062a\u0631 \u0642\u0637\u0628\u06cc\u062a \u0648 \u0641\u06cc\u0644\u062f\u0647\u0627\u06cc \u062f\u0627\u062f\u0647<\/td>\n<\/tr>\n<tr>\n<td>Cable acceptance<\/td>\n<td>\u0627\u0628\u0639\u0627\u062f\u060c \u0627\u0644\u0632\u0627\u0645\u0627\u062a \u0646\u0648\u0631\u06cc \u0648 \u0645\u06a9\u0627\u0646\u06cc\u06a9\u06cc\u060c \u0631\u0648\u0634\u200c\u0647\u0627 \u0648 \u0646\u0645\u0648\u0646\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc<\/td>\n<td>\u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc\u200c\u0647\u0627\u06cc \u0622\u0646\u0644\u0627\u06cc\u0646 \u0628\u0647 \u0647\u0645\u0631\u0627\u0647 \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0622\u0632\u0645\u0627\u06cc\u0634\u06af\u0627\u0647 \u06a9\u0627\u0628\u0644 \u0628\u0627 \u062f\u0627\u0645\u0646\u0647 \u062c\u062f\u0627\u06af\u0627\u0646\u0647<\/td>\n<\/tr>\n<tr>\n<td>Assembly acceptance<\/td>\n<td>End-face, geometry when required, polarity and optical requirements<\/td>\n<td>Inspector, interferometer when required, channel tester and data system<\/td>\n<\/tr>\n<tr>\n<td>Traceability unit<\/td>\n<td>Reel, cut length, connector pair, component lots and traveler identity<\/td>\n<td>Barcode or traveler fields, data export and rework history<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>In this guide, the <strong>launch product<\/strong> is the signed assembly used to prove the purchased route. A <strong>traveler<\/strong> is the linked production record that follows that assembly. Factory acceptance testing (FAT) must connect the launch product, traveler and raw result files.<\/p>\n<p>Decision criterion: This guide uses a <strong>Make\u2013Map\u2013Prove\u2013Trace<\/strong> test for quotation completeness. Make the signed base cable. Map every fixture, adapter and software path to the launch product. Prove cable release and finished-assembly release at separate gates. Trace each tested channel back to its source reel, components and process records. If any step lacks named equipment, method or retained evidence, the quoted scope is not yet complete. Approve expansion only for named future products.<\/p>\n<h2>GJFJV Cable Making in Two Manufacturing Phases<\/h2>\n<p>The verified HONGKAI reference has two manufacturing phases. HK-30 makes the individual tight-buffered fibers. The configured GJFJV phase gathers them, applies the aramid system and extrudes the common jacket. The quotation must state whether the gathering cage is integrated with HK-50 or supplied as a matched unit.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/08\/gjfjv-cable-making-route-v1.jpg\" alt=\"HONGKAI HK-30 and HK-50 GJFJV cable-making phases\" title=\"Two-phase GJFJV cable production route\" \/><\/p>\n<p><em>HONGKAI reference route: tight buffering, multi-fiber gathering, aramid application and common-jacket extrusion. The signed project controls the final station arrangement.<\/em><\/p>\n<h3>Four stages in the GJFJV cable route<\/h3>\n<ol>\n<li>\n<p><strong>Tight buffer \u2014 Protect each fiber.<\/strong> \u0641\u06cc\u0628\u0631 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc\u200c\u0634\u062f\u0647 \u0631\u0627 \u067e\u0631\u062f\u0627\u062e\u062a \u06a9\u0646\u06cc\u062f\u060c \u0631\u0648\u06a9\u0634 \u062a\u0646\u06af \u0627\u0639\u0645\u0627\u0644 \u0646\u0645\u0627\u06cc\u06cc\u062f\u060c \u0622\u0646 \u0631\u0627 \u0633\u0631\u062f \u06a9\u0646\u06cc\u062f\u060c \u0627\u0628\u0639\u0627\u062f \u0645\u0648\u0631\u062f \u0646\u06cc\u0627\u0632 \u0631\u0627 \u0628\u0631\u0631\u0633\u06cc \u06a9\u0646\u06cc\u062f \u0648 \u0641\u06cc\u0628\u0631 \u0631\u0648\u06a9\u0634\u200c\u062f\u0627\u0631 \u0634\u062f\u0647 \u0631\u0627 \u0628\u067e\u06cc\u0686\u0627\u0646\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>Gather fibers \u2014 Create the cable core.<\/strong> \u0641\u06cc\u0628\u0631\u0647\u0627\u06cc \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc\u200c\u0634\u062f\u0647 \u0628\u0627 \u0631\u0648\u06a9\u0634 \u0645\u062d\u06a9\u0645 \u0631\u0627 \u062f\u0631 \u0633\u06cc\u0633\u062a\u0645 \u062c\u0645\u0639\u200c\u0622\u0648\u0631\u06cc \u067e\u06cc\u06a9\u0631\u0628\u0646\u062f\u06cc\u200c\u0634\u062f\u0647 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u06a9\u0646\u06cc\u062f. \u0647\u0633\u062a\u0647\u0654 \u0628\u0633\u062a\u0647\u200c\u0628\u0646\u062f\u06cc\u200c\u0634\u062f\u0647 \u0631\u0627 \u0645\u0637\u0627\u0628\u0642 \u0646\u0642\u0634\u0647\u0654 \u06a9\u0627\u0628\u0644 \u0634\u06a9\u0644 \u062f\u0647\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>Add the strength system \u2014 Apply aramid yarn.<\/strong> \u0646\u062e \u0622\u0631\u0627\u0645\u06cc\u062f \u0645\u0634\u062e\u0635\u200c\u0634\u062f\u0647 \u0631\u0627 \u062a\u062d\u062a \u06a9\u0634\u0634 \u06a9\u0646\u062a\u0631\u0644\u200c\u0634\u062f\u0647 \u0639\u0628\u0648\u0631 \u062f\u0647\u06cc\u062f. \u0627\u0644\u06cc\u0627\u0641 \u0648 \u0646\u062e \u0631\u0627 \u0628\u0647 \u0627\u0628\u0632\u0627\u0631 \u067e\u0648\u0634\u0634 \u0647\u062f\u0627\u06cc\u062a \u06a9\u0646\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>Jacket and reel \u2014 Finish the base cable.<\/strong> \u0631\u0648\u06a9\u0634 \u0645\u0634\u062a\u0631\u06a9 \u0631\u0627 \u0627\u06a9\u0633\u062a\u0631\u0648\u062f \u0648 \u0633\u067e\u0633 \u062e\u0646\u06a9 \u06a9\u0646\u06cc\u062f. \u0627\u0628\u0639\u0627\u062f \u0645\u0648\u0631\u062f \u0646\u06cc\u0627\u0632 \u0631\u0627 \u0628\u0631\u0631\u0633\u06cc \u06a9\u0631\u062f\u0647 \u0648 \u06cc\u06a9 \u0631\u062f\u06cc\u0641 \u062a\u0645\u0627\u0645\u200c\u0634\u062f\u0647 \u0628\u0627 \u0642\u0627\u0628\u0644\u06cc\u062a \u0631\u062f\u06cc\u0627\u0628\u06cc \u0628\u067e\u06cc\u0686\u06cc\u062f.<\/p>\n<\/li>\n<\/ol>\n<p>The <a href=\"https:\/\/hkcablemachine.com\/gjfjv-cable-production-line\/\">HONGKAI \u0635\u0641\u062d\u0647 \u062e\u0637 \u062a\u0648\u0644\u06cc\u062f GJFJV<\/a> shows the HK-30 tight-buffer phase and an HK-50 reference line. The visible functions include fiber gathering, aramid payoff, jacket extrusion, cooling, diameter measurement, capstan and take-up. This is configuration evidence, not a universal fiber count, material, speed or layout.<\/p>\n<h3>\u062f\u0627\u062f\u0647\u200c\u0647\u0627\u06cc \u0645\u0631\u062d\u0644\u0647 \u06a9\u0627\u0628\u0644 \u06a9\u0647 \u0646\u0628\u0627\u06cc\u062f \u0628\u0647 \u0645\u0648\u0646\u062a\u0627\u0698 \u0646\u0647\u0627\u06cc\u06cc \u0645\u0648\u06a9\u0648\u0644 \u0634\u0648\u0646\u062f<\/h3>\n<p>Online diameter display is useful, but one screen value is not a complete cable release. The quotation should state which data are displayed, stored or checked offline and which laboratory instruments are included.<\/p>\n<table>\n<thead>\n<tr>\n<th>Control point<\/th>\n<th>\u0631\u06a9\u0648\u0631\u062f \u0628\u0631\u0627\u06cc \u0646\u06af\u0647\u062f\u0627\u0631\u06cc<\/th>\n<th>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u062c\u062f\u0627\u06af\u0627\u0646\u0647 \u06cc\u0627 \u062a\u0635\u0645\u06cc\u0645\u200c\u06af\u06cc\u0631\u06cc \u0628\u0631\u0627\u06cc \u062a\u0639\u06cc\u06cc\u0646 \u0645\u062d\u062f\u0648\u062f\u0647<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0641\u06cc\u0628\u0631 \u0646\u0648\u0631\u06cc \u0648\u0631\u0648\u062f\u06cc<\/td>\n<td>\u0647\u0648\u06cc\u062a \u0631\u0648\u0644\u060c \u0645\u0634\u062e\u0635\u0627\u062a \u062a\u0623\u06cc\u06cc\u062f\u0634\u062f\u0647\u0654 \u0641\u06cc\u0628\u0631 \u0648 \u0634\u0648\u0627\u0647\u062f \u067e\u0627\u06cc\u0647<\/td>\n<td>\u0631\u0648\u0634 \u0646\u0648\u0631\u06cc \u0648\u0631\u0648\u062f\u06cc \u0648 \u0637\u0631\u062d \u0646\u0645\u0648\u0646\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc<\/td>\n<\/tr>\n<tr>\n<td>\u0641\u0627\u0632 \u0628\u0627\u0641\u0631 \u0641\u0634\u0631\u062f\u0647<\/td>\n<td>\u0644\u0627\u062a\u0647\u0627\u06cc \u0645\u0648\u0627\u062f\u060c \u0634\u0646\u0627\u0633\u0647 \u0641\u06cc\u0628\u0631\u060c \u062a\u0646\u0638\u06cc\u0645\u0627\u062a \u0641\u0631\u0622\u06cc\u0646\u062f\u060c \u0647\u0634\u062f\u0627\u0631\u0647\u0627 \u0648 \u0627\u0628\u0639\u0627\u062f \u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc\u200c\u0634\u062f\u0647<\/td>\n<td>\u0631\u0648\u0634 \u0627\u0628\u0639\u0627\u062f\u06cc \u06cc\u0627 \u0647\u0645\u200c\u0645\u062d\u0648\u0631\u06cc \u0622\u0641\u0644\u0627\u06cc\u0646 \u062f\u0631 \u0635\u0648\u0631\u062a \u0646\u06cc\u0627\u0632<\/td>\n<\/tr>\n<tr>\n<td>\u0641\u0627\u0632 \u062c\u0645\u0639\u200c\u0622\u0648\u0631\u06cc \u0648 \u0631\u0648\u06a9\u0634<\/td>\n<td>\u0647\u0648\u06cc\u062a\u200c\u0647\u0627\u06cc \u0642\u0631\u0642\u0631\u0647 \u0641\u06cc\u0628\u0631 \u0628\u0627\u0641\u0631\u0634\u062f\u0647\u060c \u067e\u0627\u0631\u0647\u200c\u0647\u0627\u06cc \u0622\u0631\u0627\u0645\u06cc\u062f \u0648 \u0631\u0648\u06a9\u0634\u060c \u062a\u0646\u0638\u06cc\u0645\u0627\u062a \u062e\u0637\u060c \u0647\u0634\u062f\u0627\u0631\u0647\u0627 \u0648 \u0634\u0648\u0627\u0647\u062f \u0642\u0637\u0631\u06cc<\/td>\n<td>\u06af\u0632\u06cc\u0646\u0647 \u062b\u0628\u062a \u062f\u0627\u062f\u0647 \u0648 \u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc \u0622\u0641\u0644\u0627\u06cc\u0646 \u0633\u0637\u062d \u0645\u0642\u0637\u0639<\/td>\n<\/tr>\n<tr>\n<td>\u0642\u064f\u0631\u0642\u0631\u0647 \u06a9\u0627\u0628\u0644 \u062a\u0645\u0627\u0645\u200c\u0634\u062f\u0647<\/td>\n<td>\u0637\u0648\u0644\/\u0634\u0646\u0627\u0633\u0647 \u0628\u0648\u0628\u06cc\u0646\u060c \u0622\u0632\u0627\u062f\u0633\u0627\u0632\u06cc \u0628\u0635\u0631\u06cc \u0648 \u0627\u0628\u0639\u0627\u062f\u06cc\u060c \u067e\u06cc\u0648\u0633\u062a\u06af\u06cc \u0648 \u0646\u062a\u0627\u06cc\u062c \u0646\u0648\u0631\u06cc \u062a\u0648\u0627\u0641\u0642\u200c\u0634\u062f\u0647<\/td>\n<td>\u0627\u0628\u0632\u0627\u0631\u0647\u0627\u06cc \u0622\u0632\u0645\u0648\u0646 \u0646\u0648\u0631\u06cc\u060c \u0631\u0648\u0634 \u0645\u0631\u062c\u0639 \u0648 \u0642\u0627\u0644\u0628 \u062b\u0628\u062a<\/td>\n<\/tr>\n<tr>\n<td>Cable qualification<\/td>\n<td>\u0646\u062a\u0627\u06cc\u062c \u0645\u0648\u0631\u062f \u0646\u06cc\u0627\u0632 \u062a\u0648\u0633\u0637 \u0645\u0634\u062e\u0635\u0627\u062a \u06a9\u0627\u0628\u0644 \u062a\u0623\u06cc\u06cc\u062f\u0634\u062f\u0647<\/td>\n<td>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0622\u0632\u0645\u0627\u06cc\u0634\u06af\u0627\u0647\u06cc \u06a9\u0634\u0634\u060c \u062e\u0631\u062f \u06a9\u0631\u062f\u0646\u060c \u062e\u0645 \u06a9\u0631\u062f\u0646\u060c \u062f\u0645\u0627 \u06cc\u0627 \u0633\u0627\u06cc\u0631 \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0645\u062e\u0635\u0648\u0635 \u067e\u0631\u0648\u0698\u0647<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Common mistakes: A buyer budgets only the extrusion line because it includes a diameter gauge. Optical and mechanical release tests then remain undefined. A later MPO result cannot replace the base cable&#8217;s own acceptance record.<\/p>\n<p>The supplier quotation reviewed for this article contains no cable-making or cable-laboratory equipment. Those items must be added to the complete-project scope rather than inferred from the back-end equipment list.<\/p>\n<h2>\u062c\u0631\u06cc\u0627\u0646 \u06a9\u0627\u0645\u0644 \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0627\u0646\u062a\u0647\u0627\u06cc\u06cc \u0628\u0631\u0627\u06cc \u0645\u0648\u0646\u062a\u0627\u0698 MPO<\/h2>\n<p>\u06a9\u0627\u0628\u0644 GJFJV \u0645\u062c\u0645\u0648\u0639\u0647\u200c\u0627\u06cc \u0627\u0632 \u0641\u06cc\u0628\u0631\u0647\u0627\u06cc \u062c\u062f\u0627\u06af\u0627\u0646\u0647 \u0628\u0627 \u0631\u0648\u06a9\u0634 \u0645\u062d\u06a9\u0645 \u0631\u0627 \u0628\u0647 \u0627\u06cc\u0646 \u0633\u0644\u0648\u0644 \u06a9\u0627\u0631\u06cc \u0648\u0627\u0631\u062f \u0645\u06cc\u200c\u06a9\u0646\u062f. \u0631\u062f\u06cc\u0641 \u062e\u0637\u06cc \u062a\u0646\u0647\u0627 \u062f\u0631 \u062d\u06cc\u0646 \u0645\u0648\u0646\u062a\u0627\u0698 \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u062a\u0634\u06a9\u06cc\u0644 \u0645\u06cc\u200c\u0634\u0648\u062f. \u06cc\u06a9 \u0627\u0645\u0636\u0627\u06cc <strong>channel map<\/strong>\u2014\u0637\u0631\u062d \u0645\u0648\u0642\u0639\u06cc\u062a \u0628\u0647 \u0645\u0648\u0642\u0639\u06cc\u062a \u0628\u0631\u0627\u06cc \u0647\u0631 \u062f\u0648 \u0627\u0646\u062a\u0647\u0627\u06cc \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631\u2014 \u062a\u0631\u062a\u06cc\u0628 \u0648 \u0642\u0637\u0628\u06cc\u062a \u0641\u06cc\u0628\u0631 \u0631\u0627 \u06a9\u0646\u062a\u0631\u0644 \u0645\u06cc\u200c\u06a9\u0646\u062f.<\/p>\n<p>The supplier quotation identifies equipment for array preparation, adhesive handling, cure, polish, inspection and test. It does not establish the production sequence or process settings. The signed bill of materials, connector instruction and release plan must do that.<\/p>\n<p>The evidence boundary is explicit. The public HONGKAI GJFJV page supports cable-line functions. The supplied MPO catalog and quotation support equipment categories and source geometry. The cited IEC publications support interface and test-method layers. None of these sources establishes a universal recipe, throughput, acceptance limit, certification or customer result. The source-backed 3D images preserve the catalog structures while supplier brands, model text, prices and commercial terms remain excluded.<\/p>\n<h3>\u0686\u0647\u0627\u0631 \u0645\u0631\u062d\u0644\u0647 \u0627\u0632 \u0627\u0646\u062a\u0647\u0627\u06cc \u06a9\u0627\u0628\u0644 \u062a\u0627 \u0645\u0648\u0646\u062a\u0627\u0698 \u0622\u0632\u0627\u062f\u0634\u062f\u0647<\/h3>\n<ol>\n<li>\n<p><strong>\u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0648 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc \u2014 \u0647\u0631 \u0641\u06cc\u0628\u0631 \u0631\u0627 \u0628\u06cc\u0631\u0648\u0646 \u0628\u06a9\u0634\u06cc\u062f \u0648 \u0645\u0631\u062a\u0628 \u06a9\u0646\u06cc\u062f.<\/strong> \u0627\u0646\u062a\u0647\u0627\u06cc \u06a9\u0627\u0628\u0644 \u0631\u0627 \u0628\u062f\u0648\u0646 \u0627\u0632 \u062f\u0633\u062a \u062f\u0627\u062f\u0646 \u0647\u0648\u06cc\u062a \u0641\u06cc\u0628\u0631 \u0628\u0627\u0632 \u06a9\u0646\u06cc\u062f. \u0647\u0631 \u0641\u06cc\u0628\u0631 \u0631\u0627 \u0645\u0637\u0627\u0628\u0642 \u0646\u0642\u0634\u0647\u0654 \u06a9\u0627\u0646\u0627\u0644 \u0645\u0634\u062e\u0635\u200c\u0634\u062f\u0647 \u0686\u06cc\u0646\u0634 \u06a9\u0646\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>\u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u0648 \u062a\u062b\u0628\u06cc\u062a \u2014 \u0627\u0632 \u0686\u0633\u0628 \u0648 \u0645\u0633\u06cc\u0631 \u0641\u0650\u0631\u0648\u0644 \u0648\u0627\u062c\u062f \u0634\u0631\u0627\u06cc\u0637 \u0627\u0633\u062a\u0641\u0627\u062f\u0647 \u06a9\u0646\u06cc\u062f.<\/strong> \u0686\u0633\u0628 \u0645\u0634\u062e\u0635\u200c\u0634\u062f\u0647 \u0631\u0627 \u0622\u0645\u0627\u062f\u0647 \u06a9\u0646\u06cc\u062f. \u0641\u06cc\u0628\u0631\u0647\u0627 \u0648 \u0641\u0650\u0631\u0648\u0644 \u0631\u0627 \u0637\u0628\u0642 \u062a\u0648\u0627\u0644\u06cc \u062a\u0623\u06cc\u06cc\u062f\u0634\u062f\u0647\u200c\u06cc \u0645\u062e\u0635\u0648\u0635 \u0645\u062d\u0635\u0648\u0644 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u0646\u0645\u0627\u06cc\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>\u0641\u0650\u0631\u0648\u0644 \u0631\u0627 \u062a\u0645\u0627\u0645 \u06a9\u0646\u06cc\u062f \u2014 \u062e\u0634\u06a9 \u06a9\u0646\u06cc\u062f\u060c \u0622\u0645\u0627\u062f\u0647 \u06a9\u0646\u06cc\u062f\u060c \u067e\u0648\u0644\u06cc\u0634 \u062f\u0647\u06cc\u062f \u0648 \u0628\u0627\u0632\u0631\u0633\u06cc \u06a9\u0646\u06cc\u062f.<\/strong> \u0641\u0650\u0631\u0648\u0644 \u0631\u0627 \u0639\u0645\u0644\u200c\u0622\u0648\u0631\u06cc \u0648 \u0622\u0645\u0627\u062f\u0647 \u06a9\u0646\u06cc\u062f\u060c \u0633\u067e\u0633 \u067e\u0648\u0644\u06cc\u0634 \u0686\u0646\u062f\u0645\u0631\u062d\u0644\u0647\u200c\u0627\u06cc \u0631\u0627 \u0627\u0646\u062c\u0627\u0645 \u062f\u0647\u06cc\u062f. \u0642\u0637\u0639\u0627\u062a \u0633\u062e\u062a\u200c\u0627\u0641\u0632\u0627\u0631\u06cc \u0631\u0627 \u062f\u0631 \u0646\u0642\u0637\u0647\u200c\u0627\u06cc \u06a9\u0647 \u062a\u0648\u0633\u0637 \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u062a\u0639\u06cc\u06cc\u0646 \u0634\u062f\u0647 \u0627\u0633\u062a \u0645\u0648\u0646\u062a\u0627\u0698 \u06a9\u0631\u062f\u0647 \u0648 \u0633\u0637\u062d \u0627\u0646\u062a\u0647\u0627\u06cc\u06cc \u062a\u0645\u06cc\u0632\u0634\u062f\u0647 \u0631\u0627 \u0628\u0627\u0632\u0631\u0633\u06cc \u0646\u0645\u0627\u06cc\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>\u062a\u0623\u06cc\u06cc\u062f \u0648 \u0627\u0646\u062a\u0634\u0627\u0631 \u2014 \u0647\u0646\u062f\u0633\u0647\u060c \u0646\u0642\u0634\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc \u0648 \u0627\u067e\u062a\u06cc\u06a9 \u0631\u0627 \u062a\u0623\u06cc\u06cc\u062f \u06a9\u0646\u06cc\u062f.<\/strong> \u062f\u0631 \u0635\u0648\u0631\u062a \u0646\u06cc\u0627\u0632\u060c \u0647\u0646\u062f\u0633\u0647 \u0631\u0627 \u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc \u06a9\u0646\u06cc\u062f. \u0642\u0628\u0644 \u0627\u0632 \u0627\u0646\u062a\u0634\u0627\u0631 \u0628\u0633\u062a\u0647 \u0633\u0648\u0627\u0628\u0642 \u0645\u0631\u062a\u0628\u0637\u060c \u0646\u0642\u0634\u0647 \u06a9\u0627\u0646\u0627\u0644 \u0648 \u0646\u062a\u0627\u06cc\u062c \u0646\u0648\u0631\u06cc \u0631\u0627 \u062a\u0623\u06cc\u06cc\u062f \u0646\u0645\u0627\u06cc\u06cc\u062f.<\/p>\n<\/li>\n<\/ol>\n<p>\u0628\u0631\u0627\u06cc \u067e\u0631\u0648\u0698\u0647\u0654 \u0631\u0627\u0647\u200c\u0627\u0646\u062f\u0627\u0632\u06cc\u060c \u0647\u0631 \u0645\u0648\u0631\u062f \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0628\u0647 \u06cc\u06a9\u06cc \u0627\u0632 \u0633\u0647 \u0628\u0631\u0686\u0633\u0628 \u062d\u0648\u0632\u0647 \u0646\u06af\u0627\u0634\u062a\u0647 \u0645\u06cc\u200c\u0634\u0648\u062f. <strong>\u0645\u0637\u0644\u0648\u0628<\/strong> \u0628\u0647 \u0645\u0639\u0646\u0627\u06cc \u0627\u0628\u0632\u0627\u0631\u0647\u0627\u06cc \u0645\u0648\u0631\u062f \u0646\u06cc\u0627\u0632 \u0628\u0631\u0627\u06cc \u0627\u06cc\u0646 \u0645\u0633\u06cc\u0631 \u0631\u0627\u0647\u200c\u0627\u0646\u062f\u0627\u0632\u06cc\u060c \u0646\u0647 \u0628\u0631\u0627\u06cc \u0647\u0631 \u0637\u0631\u0627\u062d\u06cc MPO \u0627\u0633\u062a. <strong>Conditional<\/strong> \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u062a\u0646\u0647\u0627 \u0632\u0645\u0627\u0646\u06cc \u0648\u0627\u0631\u062f \u0645\u06cc\u200c\u0634\u0648\u0646\u062f \u06a9\u0647 \u0641\u0631\u0622\u06cc\u0646\u062f \u0627\u0645\u0636\u0627 \u0634\u062f\u0647 \u0627\u0644\u0632\u0627\u0645 \u0622\u0646 \u0631\u0627 \u062f\u0627\u0634\u062a\u0647 \u0628\u0627\u0634\u062f.<\/p>\n<p><strong>Rework<\/strong> equipment stays outside normal production unless an authorized instruction allows its use. This project-specific mapping prevents optional or rework tools from becoming a false universal line. During FAT, run each applicable item with the launch product and keep the device-specific proof named below.<\/p>\n<h3>\u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0648 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc \u0641\u06cc\u0628\u0631\u0647\u0627<\/h3>\n<p>\u0644\u06cc\u0633\u062a \u0646\u0642\u0644\u200c\u0642\u0648\u0644 \u0627\u0632 \u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0622\u0631\u0627\u06cc\u0647 \u0634\u0631\u0648\u0639 \u0645\u06cc\u200c\u0634\u0648\u062f. \u06cc\u06a9 \u0633\u0644\u0648\u0644 \u06a9\u0627\u0631\u06cc \u06a9\u0627\u0645\u0644 \u0647\u0645\u0686\u0646\u06cc\u0646 \u0628\u0647 \u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc \u0648 \u0628\u0631\u0634 \u06a9\u0627\u0628\u0644\u060c \u0628\u0631\u062f\u0627\u0634\u062a\u0646 \u0631\u0648\u06a9\u0634\u060c \u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0622\u0631\u0627\u0645\u06cc\u062f \u0648 \u0647\u0631\u06af\u0648\u0646\u0647 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u067e\u06cc\u0634\u200c\u0627\u0632\u06a9\u0627\u0631 \u0642\u0637\u0639\u0627\u062a \u0645\u0648\u0631\u062f \u0646\u06cc\u0627\u0632 \u0646\u06cc\u0632 \u0646\u06cc\u0627\u0632 \u062f\u0627\u0631\u062f.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/08\/mpo-array-assembly-equipment-v1.jpg\" alt=\"\u062a\u0647\u06cc\u0647 \u0622\u0631\u0627\u06cc\u0647 MPO\u060c \u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0686\u0633\u0628 \u0648 \u0639\u0645\u0644\u200c\u0622\u0648\u0631\u06cc\" title=\"\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0645\u0648\u0646\u062a\u0627\u0698 \u0622\u0631\u0627\u06cc\u0647 \u0648 \u0641\u0650\u0631\u0648\u0644 MPO\" \/><\/p>\n<p><em>Supplier-quoted, source-backed 3D reference: stripping, array handling, adhesive, cure and ultrasonic equipment. Branding and model text are removed.<\/em><\/p>\n<ul>\n<li>\n<p><strong>\u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0627\u0646\u062a\u0647\u0627\u06cc \u06a9\u0627\u0628\u0644.<\/strong> This required operation measures, cuts and opens the cable, prepares the aramid and preloads connector parts. It is absent from the quoted list. Verify the cable identity, dimensions, orientation, preload order and prepared end.<\/p>\n<\/li>\n<li>\n<p><strong>stripper \u062d\u0631\u0627\u0631\u062a\u06cc \u0641\u06cc\u0628\u0631 MPO.<\/strong> This conditional tool exposes the specified bare-fiber length. Use it only with a compatible fiber and coating. Keep the setting, strip length and damage check from the actual cable.<\/p>\n<\/li>\n<li>\n<p><strong>\u0645\u0631\u062a\u0628\u200c\u06a9\u0646\u0646\u062f\u0647 \u0622\u0631\u0627\u06cc\u0647 \u0641\u06cc\u0628\u0631 \u0628\u0631\u0647\u0646\u0647.<\/strong> This required device places the separated fibers in one linear order. It follows the channel map; it does not create polarity. Keep a position-by-position check or identified array image.<\/p>\n<\/li>\n<li>\n<p><strong>\u06af\u06cc\u0631\u0647\u200c\u0647\u0627\u06cc \u0646\u06af\u0647\u062f\u0627\u0631\u0646\u062f\u0647 \u0622\u0631\u0627\u06cc\u0647 \u0641\u06cc\u0628\u0631.<\/strong> These required clamps keep the verified order stable during loading. Confirm the fiber count, pitch and material match. Keep the fixture ID and post-clamp inspection.<\/p>\n<\/li>\n<\/ul>\n<p>\u0645\u0639\u06cc\u0627\u0631 \u062a\u0635\u0645\u06cc\u0645\u200c\u06af\u06cc\u0631\u06cc: \u0642\u0631\u0642\u0631\u0647 \u06a9\u0627\u0628\u0644\u060c \u0637\u0648\u0644 \u0628\u0631\u0634\u200c\u062e\u0648\u0631\u062f\u0647\u060c \u0647\u0648\u06cc\u062a \u0641\u06cc\u0628\u0631\u0647\u0627\u060c \u062c\u0647\u062a\u200c\u06af\u06cc\u0631\u06cc \u0627\u0646\u062a\u0647\u0627\u06cc\u06cc \u0648 \u0646\u0642\u0634\u0647 \u06a9\u0627\u0646\u0627\u0644 \u0628\u0627\u06cc\u062f \u0642\u0628\u0644 \u0627\u0632 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u0686\u0633\u0628\u060c \u06cc\u06a9 \u0645\u0633\u0627\u0641\u0631 \u0645\u0634\u062a\u0631\u06a9 \u062f\u0627\u0634\u062a\u0647 \u0628\u0627\u0634\u0646\u062f.<\/p>\n<h3>\u0686\u0633\u0628 \u0631\u0627 \u0622\u0645\u0627\u062f\u0647 \u06a9\u0631\u062f\u0647 \u0648 \u0641\u0650\u0631\u0648\u0644 \u0631\u0627 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u06a9\u0646\u06cc\u062f<\/h3>\n<ul>\n<li>\n<p><strong>\u0648\u0627\u062d\u062f \u062e\u0644\u0623 \u0632\u062f\u0627\u06cc\u06cc \u0686\u0633\u0628 \u0628\u0647 \u0631\u0648\u0634 \u0633\u0627\u0646\u062a\u0631\u06cc\u0641\u06cc\u0648\u0698.<\/strong> This conditional unit prepares a controlled adhesive batch when the material instruction requires it. Link the adhesive name, lot, usable-life status, quantity and cycle to the loaded ferrules.<\/p>\n<\/li>\n<li>\n<p><strong>\u0648\u0627\u062d\u062f \u0645\u06a9\u0634 \u0686\u0633\u0628 \u0641\u0650\u0631\u0648\u0644 MPO.<\/strong> The quotation identifies this conditional equipment category; it does not establish a universal ferrule-filling route or acceptance condition. Use it only when the signed connector and material instruction specifies it. Keep the equipment ID, component and material lots, settings and the process verification required by that instruction.<\/p>\n<\/li>\n<li>\n<p><strong>\u0639\u0645\u0644\u06cc\u0627\u062a \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u0641\u0650\u0631\u0648\u0644.<\/strong> \u0627\u06cc\u0646 \u0645\u0631\u062d\u0644\u0647\u0654 \u0636\u0631\u0648\u0631\u06cc\u060c \u0641\u06cc\u0628\u0631\u0647\u0627\u06cc \u0633\u0641\u0627\u0631\u0634\u200c\u062f\u0627\u062f\u0647\u200c\u0634\u062f\u0647 \u0631\u0627 \u062f\u0631 \u0641\u0650\u0631\u0648\u0644 \u0642\u0631\u0627\u0631 \u0645\u06cc\u200c\u062f\u0647\u062f. \u0644\u06cc\u0633\u062a \u0647\u06cc\u0686 \u0628\u0627\u0631\u06af\u0630\u0627\u0631 \u062c\u062f\u0627\u06af\u0627\u0646\u0647\u200c\u0627\u06cc \u0628\u0627 \u0646\u06cc\u0631\u0648\u06cc \u0645\u062d\u0631\u06a9\u0647 \u0646\u0627\u0645 \u0646\u0645\u06cc\u200c\u0628\u0631\u062f. \u0634\u0645\u0627\u0631\u0647\u0654 \u0644\u0627\u062a \u0641\u0650\u0631\u0648\u0644\u060c \u062c\u0647\u062a\u200c\u06af\u06cc\u0631\u06cc \u0648 \u0628\u0631\u0631\u0633\u06cc \u0622\u0631\u0627\u06cc\u0647\u0654 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc\u200c\u0634\u062f\u0647 \u0631\u0627 \u062d\u0641\u0638 \u06a9\u0646\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>\u0686\u0633\u0628\u200c\u0647\u0627 \u0648 \u0645\u0627\u06cc\u0639\u0627\u062a \u0641\u0631\u0622\u06cc\u0646\u062f\u06cc.<\/strong> \u0627\u06cc\u0646\u200c\u0647\u0627 \u0645\u0648\u0627\u062f \u0645\u0634\u062e\u0635\u200c\u0634\u062f\u0647 \u0647\u0633\u062a\u0646\u062f\u060c \u0646\u0647 \u06cc\u06a9 \u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644 \u062a\u0639\u0631\u06cc\u0641\u200c\u0634\u062f\u0647 \u062f\u0631 \u06a9\u0627\u062a\u0627\u0644\u0648\u06af. \u0647\u0648\u06cc\u062a\u060c \u0634\u0645\u0627\u0631\u0647 \u0633\u0631\u06cc\u060c \u0645\u0627\u0646\u062f\u06af\u0627\u0631\u06cc\u060c \u0646\u062d\u0648\u0647 \u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0648 \u0632\u0645\u0627\u0646 \u06a9\u0627\u0631 \u0628\u0627 \u0622\u0646\u200c\u0647\u0627 \u0631\u0627 \u06a9\u0646\u062a\u0631\u0644 \u06a9\u0646\u06cc\u062f.<\/p>\n<\/li>\n<\/ul>\n<p>\u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644 \u06a9\u0627\u0631 \u0628\u0627\u06cc\u062f \u062a\u0648\u0627\u0644\u06cc \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u0686\u0633\u0628 \u0648 \u0627\u0644\u06cc\u0627\u0641 \u0631\u0627 \u0645\u0634\u062e\u0635 \u06a9\u0646\u062f. \u0642\u06cc\u0645\u062a\u200c\u0647\u0627\u06cc \u062a\u0623\u0645\u06cc\u0646\u200c\u06a9\u0646\u0646\u062f\u0647\u060c \u062c\u0645\u0639 \u06a9\u0644\u060c \u062c\u0632\u0626\u06cc\u0627\u062a \u062a\u0645\u0627\u0633 \u0648 \u0634\u0631\u0627\u06cc\u0637 \u062a\u062c\u0627\u0631\u06cc \u0645\u0646\u062a\u0634\u0631 \u0646\u0645\u06cc\u200c\u0634\u0648\u0646\u062f.<\/p>\n<h3>\u0641\u0650\u0631\u0648\u0644 \u0631\u0627 \u067e\u062e\u062a\u0647 \u06a9\u0646\u06cc\u062f \u0648 \u0642\u0637\u0639\u0627\u062a \u0633\u062e\u062a\u200c\u0627\u0641\u0632\u0627\u0631\u06cc \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u0631\u0627 \u0645\u0648\u0646\u062a\u0627\u0698 \u0646\u0645\u0627\u06cc\u06cc\u062f<\/h3>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/08\/mpo-handling-tools-v1.jpg\" alt=\"MPO shell-removal tool, fiber-array clamps, adhesive scraper and pneumatic crimping press\" title=\"MPO finishing and array-handling tools\" \/><\/p>\n<p><em>Supplier-quoted, source-backed 3D reference: shell removal, array holding, adhesive scraping and crimping. Branding and model text are removed.<\/em><\/p>\n<ul>\n<li>\n<p><strong>\u06a9\u0648\u0631\u0647 \u0639\u0645\u0644\u200c\u0622\u0648\u0631\u06cc MPO.<\/strong> This required station cures the loaded ferrule in a compatible holder. Keep the adhesive batch, recipe, holder, load, time-temperature evidence and post-cure check. Two quoted ovens do not prove capacity or required redundancy.<\/p>\n<\/li>\n<li>\n<p><strong>\u062f\u0633\u062a\u06af\u0627\u0647 \u062d\u0630\u0641 \u0686\u0633\u0628 \u06cc\u0627 \u06a9\u0646\u062f\u06a9\u0627\u0631\u06cc.<\/strong> This conditional machine removes the specified cured material. Define its target, removal boundary and normal or rework status. Keep actual-ferrule before-and-after images and the damage check.<\/p>\n<\/li>\n<li>\n<p><strong>\u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0627\u0644\u06cc\u0627\u0641 \u0628\u06cc\u0631\u0648\u0646\u200c\u0632\u062f\u0647 \u0648 \u0686\u0633\u0628 \u062e\u0634\u06a9\u200c\u0634\u062f\u0647.<\/strong> \u0627\u06cc\u0646 \u0645\u0631\u062d\u0644\u0647\u0654 \u0636\u0631\u0648\u0631\u06cc\u060c \u0641\u0650\u0631\u0648\u0644 \u0633\u062e\u062a\u200c\u0634\u062f\u0647 \u0631\u0627 \u0628\u0631\u0627\u06cc \u067e\u0648\u0644\u06cc\u0634 \u0622\u0645\u0627\u062f\u0647 \u0645\u06cc\u200c\u06a9\u0646\u062f. \u0641\u0631\u0622\u06cc\u0646\u062f \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u0628\u0627\u06cc\u062f \u0631\u0648\u0634 \u0645\u062c\u0627\u0632 \u0631\u0627 \u0645\u0634\u062e\u0635 \u06a9\u0646\u062f. \u0646\u0633\u062e\u0647\u0654 \u0622\u0646\u060c \u0647\u0648\u06cc\u062a \u0641\u0650\u0631\u0648\u0644 \u0648 \u0628\u0631\u0631\u0633\u06cc \u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0631\u0627 \u062d\u0641\u0638 \u06a9\u0646\u06cc\u062f.<\/p>\n<\/li>\n<li>\n<p><strong>\u062f\u0633\u062a\u06af\u0627\u0647 \u067e\u0631\u0633 \u06a9\u0631\u06cc\u0645\u067e \u0627\u062a\u0635\u0627\u0644\u0627\u062a \u067e\u0646\u0648\u0645\u0627\u062a\u06cc\u06a9.<\/strong> This conditional press assembles compatible hardware or strength-member parts at the connector-defined stage. Prove the jaw and tooling with the actual housing and aramid setup. Keep the tooling ID and assembly inspection.<\/p>\n<\/li>\n<li>\n<p><strong>\u0627\u0628\u0632\u0627\u0631 \u0628\u0631\u062f\u0627\u0634\u062a\u0646 \u067e\u0648\u0633\u062a\u0647 \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631.<\/strong> This is a rework tool unless the connector instruction states otherwise. Define its permitted use, housing match and rework limit. Repeat the required inspection, polarity and optical checks after reassembly.<\/p>\n<\/li>\n<li>\n<p><strong>\u0648\u0627\u062d\u062f \u0641\u0631\u0622\u06cc\u0646\u062f \u0627\u0648\u0644\u062a\u0631\u0627\u0633\u0648\u0646\u06cc\u06a9.<\/strong> This unit remains conditional because its object, liquid, timing and material compatibility are not yet defined. If selected, keep those inputs, cycle settings and before-and-after inspection.<\/p>\n<\/li>\n<\/ul>\n<h3>\u067e\u0648\u0644\u06cc\u0634 \u06a9\u0631\u062f\u0646 \u0641\u0650\u0631\u0648\u0644 MPO \u0627\u0646\u062a\u062e\u0627\u0628\u200c\u0634\u062f\u0647<\/h3>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/08\/mpo-end-face-equipment-v1.jpg\" alt=\"MPO polishing, end-face inspection and geometry equipment\" title=\"MPO ferrule end-face equipment\" \/><\/p>\n<p><em>Supplier-quoted, source-backed 3D reference: MPO polishing, full-array inspection and rectangular-ferrule geometry measurement.<\/em><\/p>\n<ul>\n<li>\n<p><strong>\u062f\u0633\u062a\u06af\u0627\u0647 \u067e\u0648\u0644\u06cc\u0634 MPO.<\/strong> This required machine runs the multi-stage surface-finishing route. The recipe defines load, time, fixture, cleaning and allowed rework. Keep the machine, program, recipe and rework history.<\/p>\n<\/li>\n<li>\n<p><strong>24-position UPC and APC fixtures.<\/strong> Select the fixture that matches each purchased polish. \u201c24-position\u201d is fixture capacity, not fiber count or guaranteed throughput. Keep the fixture ID and result for every loaded position.<\/p>\n<\/li>\n<li>\n<p><strong>\u067e\u062f\u0647\u0627\u060c \u0641\u06cc\u0644\u0645\u200c\u0647\u0627\u060c \u067e\u0627\u0631\u0686\u0647\u200c\u0647\u0627 \u0648 \u0645\u0627\u06cc\u0639\u0627\u062a.<\/strong> \u0627\u06cc\u0646 \u0645\u0635\u0631\u0641\u06cc\u200c\u0647\u0627 \u0628\u0647\u200c\u0639\u0646\u0648\u0627\u0646 \u06cc\u06a9 \u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644 \u0647\u0645\u0627\u0647\u0646\u06af \u06a9\u0627\u0631 \u0645\u06cc\u200c\u06a9\u0646\u0646\u062f. \u0641\u0647\u0631\u0633\u062a \u0628\u0647\u200c\u062a\u0646\u0647\u0627\u06cc\u06cc \u062a\u0631\u062a\u06cc\u0628\u060c \u0639\u0645\u0631 \u06cc\u0627 \u0633\u0627\u0632\u06af\u0627\u0631\u06cc \u0622\u0646\u200c\u0647\u0627 \u0631\u0627 \u0645\u0634\u062e\u0635 \u0646\u0645\u06cc\u200c\u06a9\u0646\u062f. \u0647\u0648\u06cc\u062a \u0645\u0648\u0627\u062f\u060c \u0634\u0645\u0627\u0631\u0647\u200c\u0647\u0627\u06cc \u0644\u0627\u062a\u060c \u0648\u0636\u0639\u06cc\u062a \u0627\u0633\u062a\u0641\u0627\u062f\u0647 \u0648 \u0646\u0633\u062e\u0647 \u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644 \u0631\u0627 \u062d\u0641\u0638 \u06a9\u0646\u06cc\u062f.<\/p>\n<\/li>\n<\/ul>\n<h3>Clean, inspect and measure the ferrule<\/h3>\n<ul>\n<li>\n<p><strong>\u0633\u06cc\u0633\u062a\u0645 \u0628\u0627\u0632\u0631\u0633\u06cc \u0633\u0637\u062d \u0627\u0646\u062a\u0647\u0627\u06cc\u06cc MPO.<\/strong> This required gate evaluates the rectangular contact area and every fiber position with a qualified MPO adapter. Keep the image, adapter, method, criteria revision and clean-reinspect-disposition chain. It does not replace geometry or optical testing.<\/p>\n<\/li>\n<li>\n<p><strong>\u0627\u06cc\u0646\u062a\u0631\u0641\u0631\u0648\u0645\u062a\u0631 \u0647\u0646\u062f\u0633\u0647 \u0641\u0631\u0648\u0644 MPO.<\/strong> This conditional instrument measures specified rectangular-ferrule geometry. The control plan decides full inspection or sampling. Keep the reference state, adapter, raw report, repeatability evidence and product limits.<\/p>\n<\/li>\n<\/ul>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/64254\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61300-3-35:2022<\/a> covers visual inspection and classification for contamination, scratches and defects. It includes the complete contact surface of rectangular ferrules and separates visual inspection from other measurements. When geometry evidence is required, <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/93658\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61300-3-30:2026<\/a> \u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc \u0648\u06cc\u0698\u06af\u06cc\u200c\u0647\u0627\u06cc \u0645\u0634\u062e\u0635 \u0627\u0646\u062a\u0647\u0627\u06cc \u0635\u0648\u0631\u062a \u0631\u0627 \u0628\u0631\u0627\u06cc \u0641\u0631\u0648\u0644\u200c\u0647\u0627\u06cc \u0686\u0646\u062f\u0641\u06cc\u0628\u0631\u06cc \u0645\u0633\u062a\u0637\u06cc\u0644\u06cc \u0642\u0627\u0628\u0644 \u0627\u062c\u0631\u0627 \u062a\u0648\u0635\u06cc\u0641 \u0645\u06cc\u200c\u06a9\u0646\u062f.<\/p>\n<h3>\u062a\u0623\u06cc\u06cc\u062f \u0646\u0642\u0634\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc \u06a9\u0627\u0646\u0627\u0644 \u0648 \u0639\u0645\u0644\u06a9\u0631\u062f \u0646\u0648\u0631\u06cc<\/h3>\n<p><img decoding=\"async\" src=\"https:\/\/hkcablemachine.com\/wp-content\/uploads\/2026\/08\/mpo-final-test-equipment-v1.jpg\" alt=\"MPO end-face, geometry, polarity and optical test equipment\" title=\"MPO final inspection and test equipment\" \/><\/p>\n<p><em>Supplier-quoted, source-backed 3D reference: end-face, geometry, polarity and multi-channel optical test equipment.<\/em><\/p>\n<ul>\n<li>\n<p><strong>\u062a\u0633\u062a\u0631 \u067e\u0644\u0627\u0631\u06cc\u062a\u0647 \u06cc\u0627 \u062a\u0648\u0627\u0644\u06cc \u0641\u06cc\u0628\u0631 MPO.<\/strong> This required station compares both connector ends with the signed map. It detects an error; it does not define or correct the map. Challenge the actual gender and key orientation, then save every channel result.<\/p>\n<\/li>\n<li>\n<p><strong>\u0633\u06cc\u0633\u062a\u0645 \u062a\u0633\u062a \u0646\u0648\u0631\u06cc MPO \u0686\u0646\u062f\u062d\u0627\u0644\u062a\u0647.<\/strong> This required station measures the specified channels of the reference multimode assembly. Confirm the wavelengths, metrics, method, directions and limits. Keep the tester, adapters, reference cords, calibration state, setup and raw values. Scope single-mode or return-loss needs separately.<\/p>\n<\/li>\n<\/ul>\n<p>How to verify: Follow one identified launch assembly through the complete route. Retrieve its cable-reel data, array map, material and cure lots, tooling, rework history, inspection images and required test files. Machine operation alone is not proof that the connected process can release the product.<\/p>\n<h2>\u0645\u062f\u0627\u0631\u06a9 \u0622\u0632\u0627\u062f\u0633\u0627\u0632\u06cc \u0628\u0631\u0627\u06cc \u06a9\u0627\u0628\u0644 \u0648 \u0645\u062c\u0645\u0648\u0639\u0647\u200c\u0647\u0627\u06cc \u0646\u0647\u0627\u06cc\u06cc MPO<\/h2>\n<p>No single pass\/fail number covers every failure layer. The base cable needs release evidence before connectorization. The finished assembly then needs channel-specific inspection, mapping and optical results.<\/p>\n<table>\n<thead>\n<tr>\n<th>Failure layer<\/th>\n<th>Detecting gate<\/th>\n<th>Release record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0628\u0627\u0641\u0631 \u0641\u0634\u0631\u062f\u0647 \u06cc\u0627 \u0631\u0648\u06a9\u0634<\/td>\n<td>\u0627\u0628\u0639\u0627\u062f\u060c \u0628\u0631\u0631\u0633\u06cc\u200c\u0647\u0627\u06cc \u0641\u0631\u0622\u06cc\u0646\u062f \u0648 \u0628\u0627\u0632\u0631\u0633\u06cc \u0642\u0631\u0642\u0631\u0647<\/td>\n<td>\u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc\u200c\u0647\u0627 \u0648 \u0646\u062a\u06cc\u062c\u0647 \u06a9\u0644\u0627\u0641 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc \u0634\u062f\u0647<\/td>\n<\/tr>\n<tr>\n<td>\u0645\u0633\u06cc\u0631 \u0646\u0648\u0631\u06cc \u06a9\u0627\u0628\u0644<\/td>\n<td>\u0622\u0632\u0645\u0648\u0646 \u0646\u0648\u0631\u06cc \u0631\u0648\u06cc \u0642\u0631\u0642\u0631\u0647\u200c\u06cc \u062a\u0645\u0627\u0645\u200c\u0634\u062f\u0647 \u0628\u0627 \u0641\u06cc\u0628\u0631 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc\u200c\u0634\u062f\u0647<\/td>\n<td>\u0631\u0648\u0634\u060c \u062a\u0646\u0638\u06cc\u0645\u0627\u062a \u0648 \u0646\u062a\u0627\u06cc\u062c \u0627\u0644\u06cc\u0627\u0641 \u062e\u0627\u0645<\/td>\n<\/tr>\n<tr>\n<td>\u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0641\u06cc\u0628\u0631<\/td>\n<td>\u0628\u0627\u0632\u0631\u0633\u06cc \u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0648 \u0646\u062a\u06cc\u062c\u0647 \u067e\u06cc\u0648\u0633\u062a\u06af\u06cc \u06cc\u0627 \u067e\u0627\u06cc\u06cc\u0646\u200c\u062f\u0633\u062a<\/td>\n<td>\u0628\u0631\u0631\u0633\u06cc \u0627\u0646\u062a\u0647\u0627\u06cc \u0622\u0645\u0627\u062f\u0647\u200c\u0634\u062f\u0647 \u0648 \u062a\u0635\u0645\u06cc\u0645\u200c\u06af\u06cc\u0631\u06cc<\/td>\n<\/tr>\n<tr>\n<td>Array order<\/td>\n<td>\u0628\u0631\u0631\u0633\u06cc \u0622\u0631\u0627\u06cc\u0647 \u0628\u0647 \u0647\u0645\u0631\u0627\u0647 \u062a\u0633\u062a \u0646\u0647\u0627\u06cc\u06cc \u0642\u0637\u0628\u06cc\u062a \u06cc\u0627 \u062a\u0648\u0627\u0644\u06cc<\/td>\n<td>\u0646\u0642\u0634\u0647 \u0627\u0645\u0636\u0627 \u0634\u062f\u0647 \u0648 \u0646\u062a\u06cc\u062c\u0647 \u0647\u0631 \u06a9\u0627\u0646\u0627\u0644<\/td>\n<\/tr>\n<tr>\n<td>\u0686\u0633\u0628 \u0648 \u0639\u0645\u0644\u200c\u0622\u0648\u0631\u06cc<\/td>\n<td>\u0645\u0648\u0627\u062f\u060c \u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0648 \u06a9\u0646\u062a\u0631\u0644\u200c\u0647\u0627\u06cc \u0639\u0645\u0644\u200c\u0622\u0648\u0631\u06cc \u062a\u0623\u06cc\u06cc\u062f\u0634\u062f\u0647 \u0628\u0647 \u0647\u0645\u0631\u0627\u0647 \u0628\u0627\u0632\u0631\u0633\u06cc<\/td>\n<td>\u0644\u0627\u0628\u200c\u0647\u0627\u060c \u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644\u060c \u0686\u0631\u062e\u0647 \u0648 \u0646\u062a\u06cc\u062c\u0647 \u067e\u0633\u200c\u0627\u0632 \u0639\u0645\u0644\u06cc\u0627\u062a \u062d\u0631\u0627\u0631\u062a\u06cc<\/td>\n<\/tr>\n<tr>\n<td>Polished end face<\/td>\n<td>Full-array visual inspection<\/td>\n<td>\u062a\u0627\u0631\u06cc\u062e\u0686\u0647 \u062a\u0635\u0648\u06cc\u0631 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc\u200c\u0634\u062f\u0647 \u0648 \u0648\u0636\u0639\u06cc\u062a \u0628\u0627\u0632\u0631\u0633\u06cc \u0645\u062c\u062f\u062f \u067e\u0633 \u0627\u0632 \u062a\u0645\u06cc\u0632\u06a9\u0627\u0631\u06cc<\/td>\n<\/tr>\n<tr>\n<td>Ferrule geometry<\/td>\n<td>\u062f\u0631\u06cc\u0686\u0647\u0654 \u062a\u062f\u0627\u062e\u0644\u200c\u0633\u0646\u062c \u0647\u0646\u06af\u0627\u0645 \u0645\u0634\u062e\u0635\u200c\u0634\u062f\u0646<\/td>\n<td>\u06af\u0632\u0627\u0631\u0634 \u062e\u0627\u0645 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc\u200c\u0634\u062f\u0647 \u0648 \u062d\u062f\u0648\u062f \u0642\u0627\u0628\u0644 \u0627\u062c\u0631\u0627<\/td>\n<\/tr>\n<tr>\n<td>\u0645\u0633\u06cc\u0631 \u0646\u0648\u0631\u06cc \u062a\u0645\u0627\u0645\u200c\u0634\u062f\u0647<\/td>\n<td>Channel-level optical test<\/td>\n<td>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a\u060c \u062a\u0646\u0638\u06cc\u0645 \u0645\u0631\u062c\u0639\u060c \u0645\u0642\u0627\u062f\u06cc\u0631 \u062e\u0627\u0645 \u0648 \u062d\u062f\u0648\u062f<\/td>\n<\/tr>\n<tr>\n<td>Traceability<\/td>\n<td>\u0628\u0631\u0631\u0633\u06cc \u0633\u0641\u0631\u06a9\u0631\u062f\u0647 \u0648 \u0641\u0627\u06cc\u0644 \u062f\u0627\u062f\u0647<\/td>\n<td>\u06cc\u06a9 \u0647\u0648\u06cc\u062a \u06a9\u0647 \u0645\u0648\u0646\u062a\u0627\u0698\u060c \u0644\u0627\u062a\u200c\u0647\u0627 \u0648 \u0646\u062a\u0627\u06cc\u062c \u0631\u0627 \u0628\u0647 \u0647\u0645 \u067e\u06cc\u0648\u0646\u062f \u0645\u06cc\u200c\u062f\u0647\u062f<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These gates answer different questions. A clean end-face image does not prove geometry, polarity or optical performance. An optical pass does not replace the cable-stage record.<\/p>\n<p><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/68498\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61300-3-4:2023<\/a> describes attenuation-measurement methods for optical components. The buyer must still select the method, source conditions, reference arrangement, wavelengths, directions, limits and sampling. If return loss is required, name the equipment and method explicitly; \u201cMPO tester\u201d is not enough.<\/p>\n<p>Pitfalls: Test software uses different channel numbers from the assembly drawing. Rework overwrites the failed result. Master cords or adapters lack identities. Cable and connector records cannot be joined under one assembly ID.<\/p>\n<p>\u0647\u06cc\u0686 \u0634\u0648\u0627\u0647\u062f\u06cc \u0648\u062c\u0648\u062f \u0646\u062f\u0627\u0631\u062f \u06a9\u0647 \u06cc\u06a9 \u0639\u06cc\u0628 \u0631\u0627 \u0628\u0647\u200c\u0635\u0648\u0631\u062a \u062c\u0647\u0627\u0646\u06cc \u201c\u0631\u0627\u06cc\u062c\u200c\u062a\u0631\u06cc\u0646\u201d \u0628\u0646\u0627\u0645\u062f. \u062f\u0631 \u0647\u0631 \u0644\u0627\u06cc\u0647 \u062e\u0631\u0627\u0628\u06cc\u060c \u06cc\u06a9 \u062f\u0631\u0648\u0627\u0632\u0647 \u062a\u0634\u062e\u06cc\u0635 \u0642\u0631\u0627\u0631 \u062f\u0647\u06cc\u062f \u0648 \u0633\u0648\u0627\u0628\u0642 \u0645\u0631\u062a\u0628\u0637 \u0631\u0627 \u062d\u0641\u0638 \u06a9\u0646\u06cc\u062f.<\/p>\n<h2>\u0645\u062d\u0635\u0648\u0644 \u0631\u0627\u0647\u200c\u0627\u0646\u062f\u0627\u0632\u06cc FAT \u0648 \u0628\u0633\u062a\u0647 \u0633\u0648\u0627\u0628\u0642<\/h2>\n<p>Use the signed launch product for FAT, not a convenient demonstration sample. A 12-core GJFJV-to-MPO trunk is representative only after its cable drawing, ferrule, key orientation, polarity, polish and optical plan are signed. Demonstrate the purchased cable and back-end route under the same traceability identity.<\/p>\n<table>\n<thead>\n<tr>\n<th>FAT gate<\/th>\n<th>Representative run<\/th>\n<th>\u0631\u06a9\u0648\u0631\u062f \u0628\u0631\u0627\u06cc \u0646\u06af\u0647\u062f\u0627\u0631\u06cc<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0648\u0631\u0648\u062f\u06cc \u0648 \u062a\u0648\u0644\u06cc\u062f \u06a9\u0627\u0628\u0644<\/td>\n<td>\u0645\u0648\u0627\u062f \u0631\u0627 \u0622\u0632\u0627\u062f \u06a9\u0646\u06cc\u062f\u061b \u0628\u0627\u0641\u0631\u0647\u0627\u06cc \u0645\u062d\u06a9\u0645 \u062a\u0648\u0644\u06cc\u062f \u06a9\u0646\u06cc\u062f \u0648 \u06a9\u0627\u0628\u0644 \u067e\u0627\u06cc\u0647 GJFJV \u0631\u0627 \u0628\u0633\u0627\u0632\u06cc\u062f<\/td>\n<td>\u0644\u0627\u0628\u200c\u0647\u0627\u060c \u0631\u0648\u0644\u200c\u0647\u0627\u06cc \u0648\u0631\u0648\u062f\u06cc\u060c \u062a\u0646\u0638\u06cc\u0645\u0627\u062a\u060c \u0622\u0644\u0627\u0631\u0645\u200c\u0647\u0627\u060c \u0627\u0628\u0639\u0627\u062f \u0648 \u0634\u0646\u0627\u0633\u0647 \u0631\u0648\u0644 \u0646\u0647\u0627\u06cc\u06cc<\/td>\n<\/tr>\n<tr>\n<td>Cable release<\/td>\n<td>\u0637\u0631\u062d \u0627\u0628\u0639\u0627\u062f\u06cc\u060c \u0646\u0648\u0631\u06cc \u0648 \u0645\u06a9\u0627\u0646\u06cc\u06a9\u06cc \u0627\u0645\u0636\u0627\u0634\u062f\u0647 \u0631\u0627 \u0627\u062c\u0631\u0627 \u06a9\u0646\u06cc\u062f<\/td>\n<td>\u0631\u0648\u0634\u200c\u0647\u0627\u060c \u062a\u062c\u0647\u06cc\u0632\u0627\u062a\u060c \u0648\u0636\u0639\u06cc\u062a \u06a9\u0627\u0644\u06cc\u0628\u0631\u0627\u0633\u06cc\u0648\u0646\u060c \u0646\u062a\u0627\u06cc\u062c \u062e\u0627\u0645 \u0648 \u062a\u0635\u0645\u06cc\u0645\u200c\u06af\u06cc\u0631\u06cc<\/td>\n<\/tr>\n<tr>\n<td>\u0622\u0645\u0627\u062f\u0647\u200c\u0633\u0627\u0632\u06cc \u0627\u0646\u062a\u0647\u0627\u06cc\u06cc \u0648 \u0622\u0631\u0627\u06cc\u0647<\/td>\n<td>\u06a9\u0627\u0628\u0644 \u0631\u0627 \u0628\u0628\u0631\u06cc\u062f \u0648 \u0628\u0627\u0632 \u06a9\u0646\u06cc\u062f\u061b \u0641\u06cc\u0628\u0631\u0647\u0627 \u0631\u0627 \u0634\u0646\u0627\u0633\u0627\u06cc\u06cc\u060c \u067e\u0648\u0633\u062a\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc\u060c \u0645\u0631\u062a\u0628\u200c\u0633\u0627\u0632\u06cc \u0648 \u0628\u0627\u0631\u06af\u0630\u0627\u0631\u06cc \u06a9\u0646\u06cc\u062f<\/td>\n<td>\u0628\u0631\u0631\u0633\u06cc \u0627\u0646\u062a\u0647\u0627\u06cc \u0622\u0645\u0627\u062f\u0647\u200c\u0634\u062f\u0647\u060c \u0646\u0642\u0634\u0647 \u06a9\u0627\u0646\u0627\u0644\u060c \u062f\u0633\u062a\u0647\u200c\u0647\u0627\u06cc \u0641\u0650\u0631\u0648\u0644 \u0648 \u0686\u0633\u0628<\/td>\n<\/tr>\n<tr>\n<td>\u0633\u062e\u062a\u200c\u0627\u0641\u0632\u0627\u0631 \u0648 \u0639\u0645\u0644\u06cc\u0627\u062a \u067e\u062e\u062a<\/td>\n<td>\u062f\u0631 \u0645\u0631\u062d\u0644\u0647 \u062a\u0639\u0631\u06cc\u0641\u200c\u0634\u062f\u0647\u060c \u0639\u0645\u0644\u06cc\u0627\u062a \u0648\u0644\u06a9\u0627\u0646\u0634 \u0648 \u0645\u0648\u0646\u062a\u0627\u0698 \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u0631\u0627 \u06a9\u0627\u0645\u0644 \u06a9\u0646\u06cc\u062f<\/td>\n<td>Recipe, batch, holder, tooling and assembly status<\/td>\n<\/tr>\n<tr>\n<td>\u0635\u06cc\u0642\u0644 \u062f\u0627\u062f\u0646 \u0648 \u062a\u0645\u06cc\u0632 \u06a9\u0631\u062f\u0646<\/td>\n<td>\u0627\u0632 \u062f\u0633\u062a\u06af\u0627\u0647\u060c \u0641\u06cc\u06a9\u0633\u0686\u0631 \u0648 \u0645\u0635\u0631\u0641\u06cc\u200c\u0647\u0627\u06cc \u0647\u0645\u0627\u0647\u0646\u06af \u0627\u0633\u062a\u0641\u0627\u062f\u0647 \u06a9\u0646\u06cc\u062f<\/td>\n<td>Recipe revision, fixture, consumable lots and rework history<\/td>\n<\/tr>\n<tr>\n<td>\u0635\u0648\u0631\u062a \u0627\u0646\u062a\u0647\u0627\u06cc\u06cc \u0648 \u0647\u0646\u062f\u0633\u0647<\/td>\n<td>\u062a\u0645\u0627\u0645\u06cc \u0645\u0648\u0642\u0639\u06cc\u062a\u200c\u0647\u0627 \u0631\u0627 \u0628\u0627\u0632\u0631\u0633\u06cc \u06a9\u0646\u06cc\u062f\u061b \u0647\u0646\u062f\u0633\u0647 \u0631\u0627 \u062f\u0631 \u0635\u0648\u0631\u062a \u0645\u0634\u062e\u0635 \u0628\u0648\u062f\u0646 \u0627\u0646\u062f\u0627\u0632\u0647\u200c\u06af\u06cc\u0631\u06cc \u0646\u0645\u0627\u06cc\u06cc\u062f<\/td>\n<td>Saved images and the identified geometry report when required<\/td>\n<\/tr>\n<tr>\n<td>\u0646\u0642\u0634\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc \u0648 \u0627\u067e\u062a\u06cc\u06a9<\/td>\n<td>\u0646\u0642\u0634\u0647 \u0627\u0645\u0636\u0627 \u0634\u062f\u0647 \u0631\u0627 \u062a\u0623\u06cc\u06cc\u062f \u06a9\u0646\u06cc\u062f\u061b \u0647\u0631 \u06a9\u0627\u0646\u0627\u0644 \u0645\u0648\u0631\u062f \u0646\u06cc\u0627\u0632 \u0631\u0627 \u0622\u0632\u0645\u0627\u06cc\u0634 \u06a9\u0646\u06cc\u062f<\/td>\n<td>\u062c\u0647\u062a\u200c\u06cc\u0627\u0628\u06cc\u060c \u062a\u0646\u0638\u06cc\u0645\u060c \u0637\u0648\u0644\u200c\u0645\u0648\u062c\u200c\u0647\u0627\u060c \u062c\u0647\u062a\u200c\u0647\u0627\u060c \u0645\u0642\u0627\u062f\u06cc\u0631 \u062e\u0627\u0645 \u0648 \u062d\u062f\u0648\u062f<\/td>\n<\/tr>\n<tr>\n<td>Handover<\/td>\n<td>\u062e\u0631\u06cc\u062f\u0627\u0631 \u0639\u0645\u0644\u06cc\u0627\u062a \u062a\u0648\u0627\u0641\u0642\u200c\u0634\u062f\u0647 \u0631\u0627 \u062a\u06a9\u0631\u0627\u0631 \u06a9\u0631\u062f\u0647 \u0648 \u062f\u0627\u062f\u0647\u200c\u0647\u0627\u06cc \u0622\u0646 \u0631\u0627 \u0628\u0627\u0632\u06cc\u0627\u0628\u06cc \u0645\u06cc\u200c\u06a9\u0646\u062f<\/td>\n<td>\u0622\u0645\u0648\u0632\u0634\u060c \u062f\u0633\u062a\u0648\u0631\u0627\u0644\u0639\u0645\u0644\u200c\u0647\u0627\u060c \u0642\u0637\u0639\u0627\u062a \u06cc\u062f\u06a9\u06cc\u060c \u0645\u0644\u0632\u0648\u0645\u0627\u062a \u0648 \u0633\u0627\u0645\u0627\u0646\u0647 \u062b\u0628\u062a \u0645\u0648\u0627\u0631\u062f \u0628\u0627\u0632<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u0645\u062f\u0627\u0631\u06a9 \u062f\u0631\u062e\u0648\u0627\u0633\u062a\u06cc: \u0628\u0633\u062a\u0647 \u062f\u0627\u062f\u0647\u200c\u0647\u0627 \u0628\u0627\u06cc\u062f \u06cc\u06a9 \u06a9\u0627\u0646\u0627\u0644 \u0646\u0647\u0627\u06cc\u06cc \u0631\u0627 \u0628\u0647 \u0633\u0648\u06a9\u062a\u060c \u0641\u0650\u0631\u0648\u0644\u060c \u0686\u0633\u0628\u060c \u0637\u0648\u0644 \u06a9\u0627\u0628\u0644 \u0622\u0645\u0627\u062f\u0647\u200c\u0634\u062f\u0647\u060c \u0631\u062f\u06cc\u0641 \u0645\u0646\u0628\u0639 \u0648 \u0633\u0648\u0627\u0628\u0642 \u062a\u0648\u0644\u06cc\u062f \u06a9\u0627\u0628\u0644 \u0645\u0631\u062a\u0628\u0637 \u06a9\u0646\u062f.<\/p>\n<p>Back-end inspection and test equipment are essential parts of the complete-project FAT. One successful run approves only the documented product, tooling and method range. Expansion needs a written compatibility or requalification decision.<\/p>\n<p><a href=\"https:\/\/hkcablemachine.com\/peter-he-cable-machinery-expert\/\">\u067e\u06cc\u062a\u0631 \u0627\u0648<\/a> reviewed the project scope used in this article. His input was specific: treat cable-stage results and finished-assembly results as separate acceptance layers. Include the applicable back-end inspection and test route in FAT. These boundaries apply to the signed launch product; they are not a universal MPO recipe.<\/p>\n<h2>HONGKAI \u0645\u0631\u0632 \u0645\u0633\u0626\u0648\u0644\u06cc\u062a \u067e\u0631\u0648\u0698\u0647 \u06a9\u0627\u0645\u0644<\/h2>\n<p>HONGKAI insight: HONGKAI can contract the integrated scope. HONGKAI engineers the GJFJV cable-making route and coordinates verified specialist MPO assembly, inspection and test stations. The signed responsibility matrix, launch product and FAT plan\u2014not the catalog or quotation alone\u2014control the final equipment list and delivery scope.<\/p>\n<table>\n<thead>\n<tr>\n<th>Scope block<\/th>\n<th>Reference responsibility<\/th>\n<th>\u0622\u0646\u0686\u0647 \u0642\u0631\u0627\u0631\u062f\u0627\u062f \u0628\u0627\u06cc\u062f \u0628\u06cc\u0627\u0646 \u06a9\u0646\u062f<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>HK-30 and GJFJV phases<\/td>\n<td>\u0645\u062d\u062f\u0648\u062f\u0647 \u0633\u0627\u062e\u062a \u06a9\u0627\u0628\u0644 HONGKAI<\/td>\n<td>\u0645\u062d\u0635\u0648\u0644\u0627\u062a\u060c \u067e\u06cc\u06a9\u0631\u0628\u0646\u062f\u06cc\u060c \u0686\u06cc\u062f\u0645\u0627\u0646 \u0642\u0641\u0633\u0647\u060c \u0627\u0628\u0632\u0627\u0631\u0622\u0644\u0627\u062a\u060c \u062a\u0633\u062a \u067e\u0630\u06cc\u0631\u0634 \u06a9\u0627\u0631\u062e\u0627\u0646\u0647 (FAT) \u0648 \u0622\u0645\u0648\u0632\u0634<\/td>\n<\/tr>\n<tr>\n<td>Cable laboratory<\/td>\n<td>\u06cc\u06a9\u067e\u0627\u0631\u0686\u0647\u200c\u0634\u062f\u0647 \u06cc\u0627 \u062a\u0623\u0645\u06cc\u0646\u200c\u0634\u062f\u0647 \u062a\u0648\u0633\u0637 \u062e\u0631\u06cc\u062f\u0627\u0631 \u0628\u0631 \u0627\u0633\u0627\u0633 \u062a\u0648\u0627\u0641\u0642<\/td>\n<td>\u0627\u0628\u0632\u0627\u0631\u0647\u0627\u060c \u0631\u0648\u0634\u200c\u0647\u0627\u060c \u06a9\u0627\u0644\u06cc\u0628\u0631\u0627\u0633\u06cc\u0648\u0646\u060c \u0627\u0645\u06a9\u0627\u0646\u0627\u062a \u0648 \u0646\u0645\u0648\u0646\u0647\u200c\u0628\u0631\u062f\u0627\u0631\u06cc<\/td>\n<\/tr>\n<tr>\n<td>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u0645\u0648\u0646\u062a\u0627\u0698 MPO<\/td>\n<td>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u062a\u062e\u0635\u0635\u06cc \u0627\u062f\u063a\u0627\u0645\u200c\u0634\u062f\u0647 \u062f\u0631 \u067e\u0631\u0648\u0698\u0647<\/td>\n<td>Source, fixtures, work instructions, consumables, FAT and training<\/td>\n<\/tr>\n<tr>\n<td>\u0628\u0627\u0632\u0631\u0633\u06cc \u0648 \u062a\u0633\u062a MPO<\/td>\n<td>\u062a\u062c\u0647\u06cc\u0632\u0627\u062a \u062a\u062e\u0635\u0635\u06cc \u0627\u062f\u063a\u0627\u0645\u200c\u0634\u062f\u0647 \u062f\u0631 \u067e\u0631\u0648\u0698\u0647<\/td>\n<td>\u0633\u0627\u0632\u06af\u0627\u0631\u06cc\u060c \u0622\u062f\u0627\u067e\u062a\u0648\u0631\u0647\u0627\u060c \u0646\u0631\u0645\u200c\u0627\u0641\u0632\u0627\u0631\u060c \u0641\u06cc\u0644\u062f\u0647\u0627\u06cc \u062f\u0627\u062f\u0647 \u0648 \u06a9\u0627\u0644\u06cc\u0628\u0631\u0627\u0633\u06cc\u0648\u0646<\/td>\n<\/tr>\n<tr>\n<td>Site, documents and samples<\/td>\n<td>Assigned in the contract<\/td>\n<td>Utilities, drawings, components, limits, samples and approvals<\/td>\n<\/tr>\n<tr>\n<td>\u0646\u0635\u0628 \u0648 \u062e\u062f\u0645\u0627\u062a \u067e\u0633 \u0627\u0632 \u0641\u0631\u0648\u0634<\/td>\n<td>Named by equipment group<\/td>\n<td>Lead party, specialist participation, escalation and spares<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>What to ask: Require one responsibility matrix rather than separate supplier promises. Public equipment images are presentation references; the signed list, drawings and FAT machines control delivery.<\/p>\n<p>\u0628\u0631\u0631\u0633\u06cc\u200c\u0646\u0627\u0645\u0647:<\/p>\n<ul>\n<li>\n<p>\u2610 The cable line and laboratory plan match the signed GJFJV construction<\/p>\n<\/li>\n<li>\n<p>\u2610 \u0647\u0631 \u0645\u0627\u0634\u06cc\u0646 \u0648 \u0641\u06cc\u06a9\u0633\u0686\u0631 \u0628\u06a9\u200c\u0627\u0646\u062f \u0628\u0647 \u0641\u0631\u0622\u06cc\u0646\u062f \u06a9\u0627\u0646\u06a9\u062a\u0648\u0631 \u0631\u0627\u0647\u200c\u0627\u0646\u062f\u0627\u0632\u06cc \u0645\u0631\u062a\u0628\u0637 \u0627\u0633\u062a<\/p>\n<\/li>\n<li>\n<p>\u2610 \u062a\u0631\u062a\u06cc\u0628 \u0622\u0631\u0627\u06cc\u0647 \u0648 \u0642\u0637\u0628\u06cc\u062a \u0646\u0647\u0627\u06cc\u06cc \u0627\u0632 \u0647\u0645\u0627\u0646 \u0646\u0642\u0634\u0647 \u06a9\u0627\u0646\u0627\u0644 \u0639\u0644\u0627\u0645\u062a\u200c\u062f\u0627\u0631 \u0627\u0633\u062a\u0641\u0627\u062f\u0647 \u0645\u06cc\u200c\u06a9\u0646\u0646\u062f<\/p>\n<\/li>\n<li>\n<p>\u2610 Visual, geometry and optical gates have separate acceptance evidence<\/p>\n<\/li>\n<li>\n<p>\u2610 \u0633\u0648\u0627\u0628\u0642 \u06a9\u0627\u0628\u0644 \u0648 \u0645\u0648\u0646\u062a\u0627\u0698 \u06cc\u06a9 \u0632\u0646\u062c\u06cc\u0631\u0647 \u0631\u062f\u06cc\u0627\u0628\u06cc \u0645\u0634\u062a\u0631\u06a9 \u0631\u0627 \u0628\u0647 \u0627\u0634\u062a\u0631\u0627\u06a9 \u0645\u06cc\u200c\u06af\u0630\u0627\u0631\u0646\u062f<\/p>\n<\/li>\n<li>\n<p>\u2610 Responsibilities are named, and FAT retains raw data instead of pass labels<\/p>\n<\/li>\n<\/ul>\n<p>A complete line is not complete just because every machine is present. It becomes complete when one approved product moves from verified cable inputs to release with linked process and test evidence.<\/p>","protected":false},"excerpt":{"rendered":"<p>M\u06cc\u06a9\u06a9\u0627\u0628\u0644 \u062a\u0640\u0647\u0640\u0627\u06cc\u0640 \u06a9\u0640\u0645\u0640\u067e\u0640\u0644\u0640\u06cc\u0640\u062a\u0640\u0647\u0640\u06cc\u0640 MPO \u0631\u0640\u0648\u0640\u0634\u0640\u062a\u0640\u0647\u0640 \u0641\u0640\u0631\u0640\u0648\u0640\u0645\u0640 GJFJV \u062a\u0640\u06cc\u0640\u063a\u0640\u062a\u0640\u0647\u0640-\u0628\u0640\u0648\u0641\u0640\u0641\u0640\u0631\u0640\u0647\u0640\u06cc\u0640 \u06a9\u0640\u0627\u0628\u0640\u0644\u0640\u0647\u0640\u06cc\u0640 \u067e\u0640\u0631\u0640\u0648\u0640\u062f\u0640\u0648\u0640\u062a\u0640\u06cc\u0640\u0647\u0640\u06cc\u0640\u0646\u0640 \u062a\u0640\u0648\u0640 \u0627\u0640 \u062a\u0640\u0647\u0640\u0633\u0640\u062a\u0640\u0647\u0640\u062f\u0640\u060c \u062a\u0640\u0631\u0640\u0627\u0640\u06a9\u0640\u06cc\u0640\u0628\u0640\u0644\u0640\u0647\u0640\u06cc\u0640 \u0641\u0640\u06cc\u0640\u0646\u0640\u06cc\u0640\u0634\u0640\u0647\u0640\u062f\u0640 \u0627\u0640\u0633\u0640\u062a\u0640\u0647\u0640\u0645\u0640\u0628\u0640\u0644\u0640\u06cc\u0640\u0647\u0640.<\/p>","protected":false},"author":1,"featured_media":16420,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_angie_page":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"page_builder":"","thumbnail_url":"","footnotes":""},"categories":[878,1],"tags":[],"buyer-route":[],"process":[],"class_list":["post-16418","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fiber-optic-cable","category-how-to-produce-the-fiber-optic-cables"],"acf":[],"_links":{"self":[{"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/posts\/16418","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/comments?post=16418"}],"version-history":[{"count":6,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/posts\/16418\/revisions"}],"predecessor-version":[{"id":16438,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/posts\/16418\/revisions\/16438"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/media\/16420"}],"wp:attachment":[{"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/media?parent=16418"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/categories?post=16418"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/tags?post=16418"},{"taxonomy":"buyer-route","embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/buyer-route?post=16418"},{"taxonomy":"process","embeddable":true,"href":"https:\/\/hkcablemachine.com\/fa\/wp-json\/wp\/v2\/process?post=16418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}